Home PMP Study Guide Flashcards Revision · free to flip or print
PMP Flashcards: Key Tools, Techniques and Models One card for each tool, technique or model the exam uses: open a card to see its figure full size, recall what you can, then flip it to see what it is, when to use it and how the exam tests it, and step to the next card. Each card links to its study guide lesson; for formulas see the formula sheet , and for each lesson's key points the cheat sheet .
Written and reviewed by the PMLyceum team · Updated 2026-11-22 · How we write and review →
All89 Foundations and Value Delivery5 Project Environment and Organization4 Life Cycles and Development Approaches5 Project Management Principles3 Governance and Business Environment7 Scope7 Schedule9 Finance7 Quality5 Stakeholders and Communication7 Resources and Team9 Risk8 Procurement5 Agile and Hybrid8
Foundations and Value Delivery Business Case Tap to open What it is The business case is a documented economic feasibility study used to establish validity of the benefits to be delivered by a portfolio component, program, or project.When to use it Before a project starts, to decide whether it is worth doing; during the project, to judge whether to continue or stop; at the end, to measure whether the project succeeded.On the exam Typical questions: "Which document is used before a project starts?" or "A senior leader proposes a new idea; what does the project manager do first?" The answer points to the business case. Do not confuse it with the project charter: the business case says whether it is worth doing, while the charter authorizes the project. Common exam practice: look at business need, economic feasibility, and technical feasibility.Study this in the guide → Benefits Management Plan Tap to open What it is The benefits management plan is the documented explanation defining the processes for creating, maximizing, and sustaining the benefits provided by a program or project.When to use it It is started early, as the target benefits are defined, and maintained iteratively during the project. It explains how and when benefits will be realized and how they will be measured, and it tracks them until they are delivered.On the exam Typical questions: "Someone says the project did not deliver the expected value; what now?" or "The project is closing but benefits have not appeared yet." Check the benefits management plan first. The business case answers whether the project is worth doing; the benefits management plan answers whether the promised benefits were delivered and how to prove it.Study this in the guide → Portfolio, Program, and Project Tap to open What it is A portfolio is a collection of programs, projects, and operations managed as a group to maximize overall value delivery and achieve strategic objectives, meet mandatory obligations, or generate income streams. Program: A group of related projects and program activities managed in a coordinated manner to obtain benefits not available from managing them individually.When to use it Use it to place a management activity at the right level. Selecting, ranking, and trading off under limited resources is portfolio work. Coordinating interdependent projects with shared schedules and resources is program work. One team working toward a unique goal with a defined start and end is a project.On the exam A question describes a management activity and asks whether it is project, program, or portfolio management. Look at the verbs first: "prioritize, trade off, decide which to do first" points to the portfolio; "interdependent, interface conflicts, coordinate centrally" points to the program. A program is not just a big project.Study this in the guide → Value Delivery System Tap to open What it is Value delivery system: A collection of strategic business activities aimed at building, sustaining, and/or advancing an organization. Portfolios, programs, projects, products, and operations can all be part of an organization's system for value delivery.When to use it It puts a project in the organization's big picture: portfolios, programs, projects, products, and operations can all be part of the system, which helps the organization align work with strategic objectives and achieve desired outcomes.On the exam The exam tests the steps between a deliverable and value, and the project's role in the system. A project produces deliverables; value comes from outcomes and benefits, so delivery alone is not value.Study this in the guide → Two Dimensions of Project Success Tap to open What it is Project success is assessed on two dimensions at once: whether the project outcome effectively achieved the intended value, and whether the project management process was efficient against constraints such as cost, scope, time, and quality.When to use it Use it when judging whether a project succeeded: when both outcome value and management efficiency are good, the project is more successful. Weak management does not necessarily cancel success, but it lowers the degree of success.On the exam Scenario questions describe a project that finished on time and budget but delivered no value, or one that overran but delivered great value. On time, on budget, and in scope only speaks to the management dimension; it does not equal overall project success.Study this in the guide → Project Environment and Organization Enterprise Environmental Factors (EEFs) Tap to open What it is Enterprise environmental factors are conditions, not under the immediate control of the team, that influence, constrain, or direct the portfolio, program, or project. These conditions can be internal and/or external to the organization.When to use it Identify and consider the relevant factors when planning, then adjust the plan accordingly. They are inputs to many project management processes, especially planning, and the attitude toward them is to comply and adapt.On the exam Remember three features: the team cannot directly control them; the effect may be favorable, unfavorable, or neutral; they come from inside or outside the organization. Organizational structure, regulations, markets, and industry standards are common examples. To tell them from OPAs, ask whether it is a condition or a reusable practice or record.Study this in the guide → Organizational Process Assets (OPAs) Tap to open What it is Organizational process assets are plans, processes, policies, procedures, regulations, and knowledge bases specific to and used by the performing organization. These assets influence the management of the project.When to use it Borrow the organization's existing templates, processes, and historical information at the start; at closure, add this project's lessons and data back to the knowledge base for future projects.On the exam A typical question gives a concrete item and asks whether it is an EEF or an OPA. The knowledge base can be updated by the project at any time, while policies and procedures are updated per organizational rules; organizational structure and company-wide purchased software are EEFs.Study this in the guide → Organizational Structures Tap to open What it is Organizational structure arranges people and reporting lines by function, by project, or by both: functional, weak matrix, balanced matrix, strong matrix, and project-oriented. The project manager's authority and resource availability generally increase in that order.When to use it When you take on a project, first find out the organizational structure: it determines how much authority the project manager has over resources, whom team members answer to, and how information flows between departments.On the exam Identify the type from the description: members who "only listen to the functional manager" and a project manager acting as a liaison indicate functional; a full-time project manager with a team reporting directly indicates projectized; dual reporting indicates matrix. No single structure is best for every organization.Study this in the guide → Project Management Office (PMO) Tap to open What it is Project management office: Organizational entities, typically established as departments or teams, primarily tasked with centralizing activities related to the management of portfolios, programs, and/or projects. The nature of these activities can vary according to the unique needs of each organization.When to use it Set one up when an organization has many projects run in different ways: it standardizes governance processes and promotes sharing of resources, methodologies, tools, and techniques across projects. In common exam practice, PMOs are classified as supportive, controlling, or directive, with control over projects rising in that order.On the exam Common traps: a PMO is an organizational entity, not a person, and it does not do the project manager's work. The PMO looks at the whole, while the project manager looks at one project. The supportive-controlling-directive classification is common exam practice: control over projects rises in that order; supportive offers templates and training, controlling requires compliance, directive manages projects directly.Study this in the guide → Life Cycles and Development Approaches Predictive and Adaptive Approaches Tap to open What it is A predictive approach, also called waterfall or plan-driven, fits when scope, schedule, cost, resource needs, quality requirements, and risks can be clearly defined early and are expected to stay relatively stable, so most planning is done up front. An adaptive approach uses short iterations or increments and adjusts continuously based on feedback.When to use it Choose predictive when requirements are clear, scope stabilizes early, iteration costs far outweigh the value (such as construction), or regulation is strict. Choose adaptive when requirements are unclear and can only be refined after seeing results.On the exam The most common scenario question gives a project background and asks which approach to use. Separate iterative (refine the same target repeatedly for correctness) from incremental (deliver usable parts in batches for earlier value). A predictive project can also deliver incrementally; the difference is whether the overall scope is already clear.Study this in the guide → Stacey Matrix Tap to open What it is The Stacey Matrix, a common exam term, judges project uncertainty with two axes: requirements uncertainty on the vertical axis and technology uncertainty on the horizontal axis, each from low to high, dividing projects into four zones.When to use it Use it to place a scenario or real project and pick a suitable approach: in the simple zone (clear requirements and technology) a linear, predictive approach works; the complicated zone calls for predictive, iterative, incremental, or hybrid depending on the case; in the complex zone (neither requirements nor technology clear) an adaptive approach fits best; the chaotic zone is fundamentally risky.On the exam The Stacey Matrix is a common exam term. Judge how certain the requirements and technology each are, then place the project. A fixed deadline does not move a complex-zone project to predictive. The matrix uses requirements and technology, not project budget or size.Study this in the guide → Tailoring Tap to open What it is Tailoring is the deliberate adaptation of the project management approach, governance, and processes to make them more suitable for a given environment (environmental factors include industry, culture, regulations, etc.) and fit for the purpose of the work at hand.When to use it Use it when handed a full set of templates or when you want to introduce a practice: first assess the project's environment, goals, and constraints, then select and adjust to what fits. If organizational policy or a contract limits you, tailor within what is allowed.On the exam A common question: the project manager receives a full set of templates; what next? The answer is usually to tailor to the project, neither copying everything nor discarding everything. Too few processes miss critical activities; too many add cost and waste.Study this in the guide → Hybrid Approach Tap to open What it is A hybrid development approach is a combination of adaptive and predictive approaches. This development approach incorporates some elements from a predictive approach and some from an adaptive approach.When to use it Use it when some parts of a project must be planned carefully up front while others can only be adjusted as the work proceeds. Different phases or components use different methods, and you should be able to say why.On the exam Scenario questions ask you to spot a hybrid situation: for example, software built adaptively but installed in a data center built predictively. "Phased" is not itself a development approach; hybrid means using different approaches in different phases or components.Study this in the guide → Project Phases and Phase Gates Tap to open What it is Project life cycle: The series of phases that a project passes through from its start to its completion. A phase gate may occur after the end of a phase, before the beginning of the next phase.When to use it In phased predictive projects, set a gate at the end of each phase (or before it starts) to compare the phase's performance against the expectations in the business documents, then decide to continue, modify, stay, repeat, or pause or end.On the exam A common question is "what happens at the end of a phase?" The answer is a gate review: check against exit criteria, then decide. Concept questions ask about curve trends: risk and uncertainty fall as the project progresses, while the cost of change rises.Study this in the guide → Project Management Principles Six Project Management Principles Tap to open What it is The Eighth Edition condenses the guiding ideas of project management into six principles: Adopt a Holistic View; Focus on Value; Embed Quality Into Processes and Deliverables; Be an Accountable Leader; Integrate Sustainability Within All Project Areas; Build an Empowered Culture.When to use it The principles are a judgment framework, not fixed steps. In a scenario question, ask which option best fits them; together they describe the project management mindset.On the exam A common format gives a team's behavior and asks which principle it follows or violates. The test for the holistic view is global rather than local optimization; Focus on Value means seriously considering termination when deviations persist and value is out of reach.Study this in the guide → Sustainability and the Triple Bottom Line Tap to open What it is By integrating sustainability into project management, organizations can align with the triple bottom line, balancing social equity, environmental stewardship, and economic prosperity. Sustainability means meeting current needs without harming the ability of future generations to meet their own.When to use it When a project may cause negative external effects, choose a strategy by increasing impact: compensate or offset, restore, mitigate, or avoid completely. Each step is closer to removing the problem at its source.On the exam The triple bottom line is environmental, social, and economic, not scope, schedule, and cost. Given a specific action, you may be asked which level of the pyramid it is: paying afterward is compensation, repairing ecosystems is restoration, reducing emissions is mitigation, and relocating so the impact never occurs is avoidance.Study this in the guide → Four Professional Ethics Values Tap to open What it is On the exam, professional ethics for project management professionals is usually summarized in four values (from the PMI Code of Ethics and Professional Conduct): responsibility, respect, fairness, and honesty. They are the project manager's minimum standard and the most common yardstick in scenario questions.When to use it In a difficult situation, work through it in order: verify the facts, check against the four values, and choose the response that is honest, appropriately transparent, and follows the rules and procedures; transparency must still respect confidentiality and the situation.On the exam A question often offers a tempting quiet fix or going along with the flow, for example a sponsor asking to lower a risk rating before a review. Do not comply: polishing the data conceals facts from the review board and violates honesty; present the risk and its responses truthfully. If something is only hearsay with no evidence, verify with the people involved first rather than disciplining or accusing on rumor.Study this in the guide → Governance and Business Environment Project Charter Tap to open What it is A project charter is a document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities.When to use it Produced in the Initiate Project or Phase process, usually once. It holds only high-level information (purpose, success criteria, milestones, pre-approved funding, key stakeholders, approval requirements), and leaves detail to the project management plan.On the exam Typical questions: "Which document proves the project manager's authority?" or "The sponsor says no charter is needed; what now?" The answer is the project charter. Acceptance criteria and exclusions belong in the project scope statement, not the charter. A contract governs between organizations; the charter governs authorization within one.Study this in the guide → Project Management Plan Tap to open What it is The project management plan is the document that describes how the project will be executed, monitored and controlled, and closed. The project management plan defines the basis for all project decisions and is a living document that can be expected to change over time.When to use it Built by integrating the sub-plans and baselines from each domain. Execution, monitoring, and closing all rely on it, and actual results are compared against it. After approval it is maintained as approved changes occur.On the exam Keep three things apart: plan components explain how to do the work, baselines are approved versions (scope, schedule, cost), and project documents record current status (issue log, risk register). In predictive settings baselines change only through formal change control, while the team updates project documents freely.Study this in the guide → Change Control Process and Change Control Board (CCB) Tap to open What it is The CCB is a formally established group responsible for reviewing, evaluating, approving, deferring, or rejecting changes—and for documenting and communicating these decisions.When to use it In predictive projects with an established baseline, handle a change request in this order: record, evaluate, submit, update, notify, and do not implement before approval. Adaptive projects usually add the change to the backlog and reprioritize.On the exam Questions often ask what the next step is. A verbally requested change is documented first, then its impact is assessed, and only then is it submitted for approval; never implement first and notify later. In common exam practice, if the question does not name an approver, submit it to the CCB.Study this in the guide → Issue Log Tap to open What it is An issue log is a project document where information about issues is recorded and monitored.When to use it Record an issue as soon as it occurs, with an owner, a due date, and closing criteria. It is first created in the Manage Project Execution process, updated throughout monitoring, and closed once the issue is resolved.On the exam The classic question is issue versus risk versus change request: an issue has already happened, a risk might happen, and a change request asks to modify a baseline or controlled document. A log that has not been updated for two months is a management defect, so restore the update rhythm.Study this in the guide → Lessons Learned Register Tap to open What it is A lessons learned register is a project document or repository used to record knowledge gained during a project, phase, or iteration so that it can be used to improve future performance for the team and the organization.When to use it Created early in the Manage Project Knowledge process and updated throughout the project. A good entry states what happened, its impact, the cause, and what to do next time.On the exam Tell the three registers apart: the risk register records what might happen, the issue log records what has happened and must be resolved, and the lessons learned register records knowledge gained. Successful practices belong in it too; its purpose is improvement, not blame.Study this in the guide → PESTLE Analysis Tap to open What it is PESTLE is a prompt list for scanning a project's external environment: it lays out political, economic, sociocultural, technological, legal, and environmental factors to widen the team's thinking and avoid omissions.When to use it Use it to investigate the external environment (regulation, technology, market, politics) after initiation and before planning, to identify sources of overall project risk, and to assess the impact when the environment changes.On the exam The key words are "investigate proactively, as early as possible" (common exam practice): do not wait to be told, reuse the last project's conclusions, or look only at internal policy. When an external change appears, assess its impact first and decide afterward; do not change the plan straight away.Study this in the guide → ADKAR Change Model Tap to open What it is ADKAR breaks an individual's adoption of change into five steps: Awareness, Desire, Knowledge, Ability, and Reinforcement, built up in that logical order.When to use it When a project drives organizational change, use it to diagnose where people are stuck and take the matching action, starting with the earliest barrier.On the exam Given a symptom, name the missing step: employees asking "why change?" lack awareness, so communicate; those who know but cannot do it lack ability, so train; those who revert to old ways lack reinforcement. ADKAR is a common exam term.Study this in the guide → Scope Work Breakdown Structure (WBS) Tap to open What it is The WBS is a hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables. The lowest level components are work packages.When to use it After Define Scope, to turn the project scope statement into a structure that can be assigned, estimated, tracked, and measured. Decompose to work packages; only later, when building the schedule, are work packages broken into activities.On the exam The 100% rule: the WBS must include all product work and project work (including project management work), with nothing missing and nothing extra. The biggest trap is confusing WBS elements (outcomes) with schedule activities (actions). In adaptive projects, the product backlog plays the corresponding role.Study this in the guide → WBS Dictionary Tap to open What it is The WBS dictionary is a document that provides detailed deliverable, activity, scheduling, cost, and resource information about each component in the WBS. The WBS dictionary is a document that supports the WBS. Most information included in the WBS dictionary is created by other processes and added to this document at a later stage.When to use it Prepare it when deliverables are complex or interdependent, and add to it as quality, schedule, and cost are planned. Together with the WBS and the project scope statement, it forms the scope baseline.On the exam The WBS is the table of contents; the dictionary is the description of each entry. A new member who wants to know what a work package involves and what resources it needs, or who must check work descriptions when interfaces do not match, should consult the dictionary, not just the WBS.Study this in the guide → Requirements Traceability Matrix (RTM) Tap to open What it is The requirements traceability matrix is a grid that links product requirements from their origin to the deliverables that satisfy them.When to use it Build it after requirements are elicited and use it throughout the life cycle: trace backward to business and project objectives and forward to deliverables, design, development, and testing. It also supports managing product scope changes and acceptance.On the exam Its four purposes are nearly the answer text: every requirement adds business value, requirements can be tracked across the life cycle, every approved requirement is delivered by the end, and it provides a structure for product scope changes. If a question says "ensure every approved requirement is eventually delivered," choose the RTM.Study this in the guide → Project Scope Statement Tap to open What it is The project scope statement is the description of the project scope, major deliverables, assumptions, and constraints. The project scope statement documents the entire scope, including the project and product scope.When to use it Prepared in the Define Scope process to let the team plan in more detail and guide execution, and used as the basis for judging whether a change request or extra work falls inside the project boundary.On the exam Two facts to memorize: acceptance criteria and project exclusions live in the scope statement, not in the charter. When there is a dispute about whether a request is in scope, open the scope statement first, rather than raising a change or revising the plan.Study this in the guide → Requirements Elicitation Techniques Tap to open What it is The most common elicitation techniques include interviews, focus groups, questionnaires and surveys, brainstorming, benchmarking, observation, and prototypes, each suited to particular situations; document analysis, design thinking, and meetings are also used.When to use it Choose by situation: a large, widely dispersed audience that needs statistics calls for questionnaires and surveys; sensitive or confidential information calls for interviews; mutual stimulation among one type of person calls for focus groups; many ideas call for brainstorming; early hands-on feedback calls for prototypes.On the exam A scenario is given and you pick the technique. Spot the signal words first; with none, eliminate options that do not fit the situation. When stakeholders say they will know it when they see it, prefer a prototype.Study this in the guide → MoSCoW Prioritization Tap to open What it is MoSCoW sorts requirements into four tiers: must have, should have, could have, and will not have.When to use it Use it when requirements exceed resources: must-haves are delivered on time, should-haves can slip, could-haves are done only with spare capacity, and will-not-haves are explicitly out of this release.On the exam MoSCoW and Kano analysis are common exam terms. Other prioritization methods include the 100-point method and cost of delay. Kano analysis classifies requirements by their effect on user satisfaction; it is for classification and ranking, not estimating.Study this in the guide → Scope Creep and Gold Plating Tap to open What it is Scope creep: The uncontrolled expansion to product or project scope without adjustments to time, cost, and resources. Gold plating is the team adding, on its own initiative, features or content that go beyond the scope baseline and that nobody asked for.When to use it When monitoring scope, prevent both with variance analysis, trend analysis, and inspection. If out-of-scope work appears, control first, then change: record the request and reason, assess its impact on scope, schedule, and cost, and submit it through change control.On the exam The difference is the source: creep usually starts with a customer or sponsor request that the team just does, while gold plating is the team adding what it thinks users will like. Both exceed the scope baseline without change control. An addition approved with an adjusted baseline is a normal change, not creep.Study this in the guide → Schedule Critical Path Method (CPM) Tap to open What it is Critical path method is a method used to estimate the minimum project duration and determine the amount of scheduling flexibility (float) on the logical network paths within the schedule model. The CPM identifies the critical path, which is the sequence of activities that determines the shortest possible duration to complete the project.When to use it After the network diagram and duration estimates are ready: list all paths, add up durations, and take the longest; or use the forward and backward pass to get each activity's earliest and latest dates and float.On the exam A common calculation question: find the critical path and the minimum duration. If a critical activity slips, the project generally slips by the same amount; a non-critical activity slipping within its total float does not affect the project. CPM ignores resource limits, and its dates are windows rather than the actual schedule.Study this in the guide → Float Tap to open What it is Float (scheduling flexibility): On any network path, total float refers to the amount of time an activity can be delayed without delaying the project finish date or violating a constraint. Free float is the time an activity can be delayed without affecting the early start of its successor.When to use it Calculate it after the forward and backward passes of the critical path method to see how much flexibility the plan has when a non-critical activity slips: TF = LF − EF = LS − ES; the critical path usually has zero total float. When an imposed date is earlier than the logic and durations allow, negative float appears, and acceleration strategies such as schedule compression need to be analyzed.On the exam Common exam practice: when a non-critical activity slips, first check whether the delay exceeds its total float. If not, just update the plan and keep monitoring, with no need to crash; if it does, assess the consequences and consider measures such as schedule compression. Total float protects the finish date and free float protects the successor's early start; activities on the same path may share one stretch of total float, so once one activity uses it, the others have less.Study this in the guide → Precedence Diagramming Method (PDM) Tap to open What it is Precedence diagramming method is a technique used for constructing a schedule model in which activities are represented by nodes and are graphically linked by one or more logical relationships to show the sequence in which the activities are to be performed.When to use it Use it when sequencing activities: connect activities with four logical relationships, finish-to-start, finish-to-finish, start-to-start, and start-to-finish, and add leads or lags where needed.On the exam Its aliases are the node method and activity-on-node (AON). Finish-to-start (FS) is the most common relationship. An activity with several predecessors is a path merge, and one with several successors is a path split; merges concentrate risk.Study this in the guide → Gantt Chart and Milestone Schedule Tap to open What it is Gantt chart: A bar chart of schedule information where activities are listed on the vertical axis, dates are shown on the horizontal axis, and activity durations are shown as horizontal bars placed according to start and finish dates. Milestone schedule: A type of schedule that presents milestones with planned dates.When to use it Choose the form to fit the audience's information needs. A milestone schedule shows only points in time (diamond symbols) and is often used for high-level communication; a Gantt chart (bar chart) shows each activity's timing at a glance, which makes it easy for the team and stakeholders to see each activity's start, finish and overlap.On the exam Common exam practice: for executives, choose the milestone schedule; to see each activity's start and finish at a glance, choose the Gantt chart (bar chart); to analyze the logical relationships between activities, use the project schedule network diagram. Do not swap them.Study this in the guide → Multipoint Estimating (Three-Point Estimating) Tap to open What it is Multipoint estimating is a method used to estimate cost or duration by applying an average or weighted average of optimistic, pessimistic, and most likely estimates when there is uncertainty with the individual activity estimates.When to use it Use it when there is uncertainty, risk, and not enough historical data. The triangular distribution takes the simple average (O+M+P)/3; the beta (PERT) distribution weights the most likely value by 4: (O+4M+P)/6.On the exam In calculation questions, check which formula the question names. If it names no distribution, use the beta (PERT) formula (common exam practice); if it says "triangular distribution" or "simple average", use the triangular one. The wider the gap between the pessimistic and optimistic values, the more uncertain the activity. The technique originates from the Program Evaluation and Review Technique (PERT).Study this in the guide → Crashing and Fast Tracking Tap to open What it is Crashing: A schedule compression technique used to shorten the schedule duration for the least incremental cost by adding resources. Examples of crashing include approving overtime, bringing in additional resources, or paying to expedite delivery to activities on the critical path. Fast tracking: A schedule compression technique in which activities or phases normally done in sequence are performed in parallel for at least a portion of their duration. An example is constructing the foundation of a building before completing all of the architectural drawings.When to use it Use them when the schedule must be shortened without reducing scope (for example, when there is negative float or the finish date is moved up), and compress only activities that can shorten the critical path. For crashing, use the cost slope to choose which activity to crash first. For fast tracking, review dependencies first: discretionary dependencies can be overlapped, but mandatory dependencies must not be violated. Redo the critical path analysis afterward.On the exam Common exam practice: decide from the conditions in the question. Crashing adds resources (people, overtime, expedite fees) and increases cost; it works only on critical path activities that can actually be shortened, compressing non-critical activities does not shorten the project, and not every activity speeds up with more resources. Fast tracking turns activities that were sequential into parallel work and typically does not rely on added resources, but it may cause rework and adds risk and coordination effort. If the question offers budget and extra resources, choose crashing; if it says no extra resources and sequential activities can overlap, choose fast tracking.Study this in the guide → Resource Leveling and Resource Smoothing Tap to open What it is Resource leveling is a resource optimization technique in which adjustments are made to the project schedule to optimize the allocation of resources and which may affect the critical path. In resource smoothing, as opposed to resource leveling, the project's critical path is not changed and the completion date may not be delayed.When to use it Use it when shared resources are available only in certain periods, resources are over-allocated, or resource use needs to be kept even. A resource histogram shows which days exceed what is available.On the exam The difference: leveling may lengthen the critical path and push out the finish date; smoothing adjusts only within float and does not change the critical path or finish date. "Limited resources, no extra available" points to leveling; adding "without delaying the project" narrows it to smoothing.Study this in the guide → Critical Chain Method Tap to open What it is Critical chain method: A schedule method that allows the project team to place buffers on any project schedule path to account for limited resources and project uncertainties.When to use it Use it when resources are tight and uncertainty is high: pull the safety margin out of each activity, pool it into buffers at chosen points on the path, have teams work to the tighter times, and draw on the buffer only when something goes wrong.On the exam It builds on the critical path method and adds resource constraints; a resource-constrained critical path is the critical chain. The buffer replaces task-level buffers rather than being added on top of them.Study this in the guide → Rolling Wave Planning Tap to open What it is Rolling wave planning is an iterative planning technique in which the work to be accomplished in the near term is planned in detail, while the work in the future is planned at a higher level.When to use it When early information is unclear, decompose only as far as you can see. As more information arrives, refine planning packages in the near-term window into work packages, break them into activities, and update the activity list, schedule, and estimates.On the exam It expresses progressive elaboration: detailed in the near term, rough for the future. A planning package has a name and rough scope but no detailed activities yet, sitting below the control account and above work packages. It does not mean far-future work is left unplanned.Study this in the guide → Finance Earned Value Management (EVM) Tap to open What it is Earned value management integrates the scope baseline with the cost baseline and schedule baseline to form the performance measurement baseline. EVM develops and monitors three key dimensions for each work package and control account: planned value, earned value, and actual cost.When to use it Use it to monitor schedule and cost performance: SV = EV - PV and CV = EV - AC. EV always comes first; a positive variance is good. The index formulas are on the SPI and CPI card.On the exam Calculations follow three steps: find BAC, duration, percent complete, and spending; compute PV, EV, and AC; then compute variances or indices and interpret. PV and EV both use the budgeted rate, and EV and AC both refer to work actually done. An index below 1 means behind schedule or over budget.Study this in the guide → Performance Indices SPI and CPI Tap to open What it is Schedule performance index (SPI): A measure of schedule efficiency expressed as the ratio of earned value to planned value. Cost performance index (CPI): A measure of the cost efficiency of budgeted resources expressed as the ratio of earned value to actual cost.When to use it Use them to judge project status and its likely cause: both below 1 means behind and over budget; CPI below 1 with SPI above 1 often means schedule was bought with crashing; CPI above 1 with SPI below 1 means under budget but behind.On the exam A CPI of 0.8 means only 0.8 of value is earned for every 1 spent. Memory aid: S is schedule, divide by PV; C is cost, divide by AC. After finding a variance, the project manager analyzes the root cause first and then decides on action.Study this in the guide → Estimate at Completion (EAC) Tap to open What it is Estimate at completion: The expected total cost of completing all work expressed as the sum of the actual cost to date and the estimate to complete.When to use it Pick the formula from the question's signals: a one-off variance with the rest on plan, EAC = AC + (BAC - EV); current performance continues, EAC = BAC / CPI; cost and schedule both drive the remaining work, EAC = AC + (BAC - EV) / (CPI x SPI); a bottom-up re-estimate, EAC = AC + new ETC.On the exam "One-off" or "problem resolved" signals an atypical variance; "current performance continues" signals a typical one; "re-estimated" means use AC plus the new ETC and do not apply CPI again. With no further information, common exam practice treats it as a typical variance: BAC / CPI. Variance at completion VAC = BAC - EAC.Study this in the guide → To-Complete Performance Index (TCPI) Tap to open What it is The to-complete performance index (TCPI) is a measure of the cost performance that should be achieved with the remaining resources in order to meet a specified management goal, expressed as the ratio of the cost to finish the outstanding work to the remaining budget.When to use it Use it to test whether a target is still realistic: with BAC as the goal, TCPI = (BAC - EV) / (BAC - AC); with a new EAC as the goal, TCPI = (BAC - EV) / (EAC - AC).On the exam Interpretation: above 1 means future work must be more efficient than planned, and the larger the harder; equal to 1 means finishing exactly at planned efficiency; below 1 means you can finish even at lower efficiency. Memory aid: it is CPI with a subtraction in both numerator and denominator.Study this in the guide → Net Present Value (NPV) and Discounting Tap to open What it is Money today is worth more than money later: converting future money to today's value is discounting, PV = FV / (1 + r)^n. Net present value is the sum of discounted cash flows, and at a discount rate equal to the internal rate of return, NPV is exactly 0.When to use it Use it to compare investment options or payment terms: the further away and the higher the discount rate, the smaller the present value. An NPV above 0 is generally acceptable, and an IRR above the organization's minimum required return is acceptable on that standard.On the exam The number of years is the number of discount periods, and you divide. Do not confuse present value with planned value in EVM, which share the abbreviation PV: a discount rate and years signal present value. Under common exam practice, the payback period counts from the start of the project, including the build period.Study this in the guide → Cost Baseline and Reserves Tap to open What it is The cost baseline is the approved version of the time-phased project budget, excluding any management reserves, which can be changed only through formal change control procedures and is used as a basis for comparison to actual results.When to use it Aggregate costs from activities to work packages, control accounts, and the project, then add contingency reserve to get the cost baseline; adding management reserve gives the project budget. Contingency reserve covers known risks; management reserve covers unforeseen work within scope.On the exam The difference: contingency reserve is generally inside the cost baseline and the project manager uses it within authority per the risk response plan; management reserve is outside the baseline, and using it changes the baseline, so it requires formal change control. Unless stated otherwise, the exam assumes the project manager must submit a change request.Study this in the guide → Cost Estimating Methods Tap to open What it is Analogous estimating is a technique for estimating the duration, cost, or required resources for an activity or a project using historical data from a similar activity or project. Parametric estimating is an estimating technique in which an algorithm is used to calculate cost or duration based on historical data and project parameters.When to use it Choose by the information at hand: early, little information, need speed, use analogous; a reliable statistical relationship such as cost per data point, use parametric; higher accuracy needed, roll up bottom-up from work packages; high uncertainty, use multipoint.On the exam Look for signal words: "based on similar past projects" means analogous, "statistical relationship, parametric model" means parametric, "roll up by work package" means bottom-up, and "optimistic, pessimistic, most likely" means multipoint. The methods differ essentially in how much information they use.Study this in the guide → Quality Cause-and-Effect Diagram (Fishbone) Tap to open What it is A cause-and-effect diagram is a visual representation that helps trace an effect back to its root cause. A cause-and-effect diagram may also be known as a fishbone or Ishikawa diagram. This type of diagram breaks down the causes of the problem statement identified into discrete branches, helping to identify the main or root cause of the problem.When to use it Use it when a quality problem or defect appears and you need to find out why it happened, before ranking priorities.On the exam Fishbone, Ishikawa, and cause-and-effect diagrams are the same tool. The problem statement sits at the head, the main bones are cause categories (commonly people, machines, materials, methods, environment), and you keep asking why down to an actionable root cause. It answers why, not which cause matters most.Study this in the guide → Pareto Chart Tap to open What it is A Pareto chart is a bar chart ordered from highest to lowest by a chosen measure, usually frequency in defect analysis, often with a cumulative-percentage line. The first few bars on the left are the vital few causes behind most of the problems.When to use it Use it when you already have counts of defects or causes and need to decide which categories to tackle first.On the exam It rests on the 80/20 rule; when the question gives no other criterion, common exam practice treats about 80% cumulative as the cutoff for the priority categories. It shows frequency only, not severity or cost to fix, so a rare but serious problem must not be postponed casually. Do not mix it up with a histogram: a histogram shows distribution, a Pareto chart ranks categories.Study this in the guide → Control Charts Tap to open What it is Control charts are used to determine whether or not a process is stable or has predictable performance. Upper and lower control limits are different from specification limits. The control limits are determined using standard statistical calculations and principles to ultimately establish the natural capability for a stable process.When to use it Use it to monitor whether a process is stable and to spot checkpoints that need corrective action; most often used to track repetitive activities in batch production, but also usable for cost variances, scope changes, and similar measures.On the exam Specification limits come from requirements and control limits from the process itself; do not mix them up, which is why "in control but out of spec" and "out of control but within spec" can both occur. A point outside the control limits, or points in a clearly non-random pattern, is an out-of-control signal and calls for investigating a special cause.Study this in the guide → Cost of Quality Tap to open What it is The cost of quality includes all costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraisal of the product or service for conformance to requirements, and failure to meet requirements. It breaks down into prevention, appraisal, and failure (internal and external) costs.When to use it Use it when planning quality to balance how much to invest in prevention and appraisal so as to avoid failure costs.On the exam Sorting questions: training and process documentation are prevention; testing and inspection are appraisal; rework and scrap are internal failure (found by the project team); warranty work, liabilities, and lost business are external failure (found by the customer, often after delivery). Prevention and appraisal are conformance costs, failure is nonconformance cost. There is an optimal cost of quality beyond which more prevention and appraisal spending brings no benefit.Study this in the guide → Checklists and Check Sheets Tap to open What it is A checklist is a list of items, actions, or points to be considered, often used as a reminder. A check sheet is used to count and collect data, tallying how many times each type of event occurs.When to use it Use a checklist to confirm that required steps or requirements are all covered and nothing is missed; use a check sheet to collect defect data that can later feed a histogram or Pareto chart.On the exam Match the keywords: verify item by item and avoid omissions means checklist; counting and tallying means check sheet, which is a common exam term. A histogram shows distribution, a scatter diagram shows correlation, a cause-and-effect diagram finds causes, and a Pareto chart ranks priorities.Study this in the guide → Stakeholders and Communication Power/Interest Grid Tap to open What it is A two-dimensional grid that groups stakeholders by power (level of authority) and interest (level of concern about project outcomes), commonly sorted into four cells: manage closely, keep satisfied, keep informed, and monitor.When to use it Use it when there are many stakeholders and you must decide whom to focus on and how much effort each deserves; it suits small projects or projects where relationships are fairly simple.On the exam Judge the two dimensions first, then place the person: final decision rights or veto power means high power; deep concern for success or direct use of the results means high interest. High on both means manage closely, even if the person currently opposes the project. The four cell names are common exam practice.Study this in the guide → Stakeholder Engagement Assessment Matrix Tap to open What it is A stakeholder engagement assessment matrix is a matrix that compares current and desired stakeholder engagement levels. The levels are unaware, resistant, neutral, supportive, and leading.When to use it Use it when planning and monitoring stakeholder engagement to find the gap between each person's current and desired engagement and decide how much communication effort is needed.On the exam C marks the current level and D the desired level; the gap sets the communication effort, and closing it is the core of monitoring engagement. D need not be Leading, a resistant stakeholder calls for analyzing the resistance first, and an unaware one mainly lacks information.Study this in the guide → Communication Models Tap to open What it is A communication model is a description, analogy, or schematic used to represent how the communication process will be performed for the project. The basic model runs through encode, transmit, and decode; the interactive model adds acknowledge and feedback.When to use it Use it when planning communications and when analyzing why a message was not understood as intended.On the exam The basic model only ensures the message gets delivered. "Received" is merely an acknowledgment, not agreement or understanding; communication succeeds only when the receiver sends back their own understanding and the sender confirms it matches. Do not send important information just once.Study this in the guide → Communication Channels Tap to open What it is With n people, the number of potential communication channels is n(n−1)/2. Each person talks to the other n−1 people, and A-to-B is the same channel as B-to-A, so the total is divided by 2.When to use it Use it when headcount changes and you need to gauge communication complexity, and to explain why larger groups need layered or grouped communication.On the exam A common calculation question: 4 people give 6 channels, 5 people give 10, and adding one person adds as many channels as the original headcount. Count carefully who is included in n before applying the formula. The formula is common exam practice.Study this in the guide → Stakeholder Register Tap to open What it is A stakeholder register is a project document that contains information about project stakeholders, including an assessment and classification of project stakeholders.When to use it Start it when identifying stakeholders and update it whenever someone joins or leaves or a person's power, interest, or attitude changes.On the exam The register records who the person is and how much power and interest they have; as common exam practice, current and desired engagement and the engagement strategy go in the stakeholder engagement plan. When a new stakeholder appears during execution, add and analyze them in the register first, then update the engagement plan, and update the communications management plan if they need project information.Study this in the guide → Communication Methods Tap to open What it is A communication method is a systematic procedure, technique, or process used to transfer information among project stakeholders. The three common types are interactive, push, and pull communication.When to use it Use it when planning communications: choose by how complex the information is, how large the audience is, and whether on-the-spot clarification is needed.On the exam Interactive communication is real-time back-and-forth, such as meetings and calls; push sends information directly to chosen recipients, which ensures it is sent but not that it arrives or is understood, such as email and reports; pull lets recipients retrieve it themselves, which suits large volumes or wide audiences, such as portals and knowledge bases. Technology is the tool and method is the route: asked what tool to use, answer technology; asked about a missing standard way of working, answer method.Study this in the guide → Salience Model Tap to open What it is The salience model describes classes of stakeholders based on assessments of their power (level of authority or ability to influence the outcomes of the project), urgency (need for immediate attention, either time-constrained or relating to the stakeholders' high stakes in the outcome), and legitimacy (their involvement is appropriate).When to use it It is useful for large, complex communities of stakeholders or where there are complex networks of relationships within the community, and for determining the relative importance of identified stakeholders. PMBOK 8 also mentions an adaptation that substitutes proximity (direct involvement in project activities) for legitimacy.On the exam Remember the three dimensions: power, urgency, and legitimacy. If the question gives two dimensions, use a grid such as the power/interest grid; if it says the community is huge and the relationships complex, choose the salience model; if it wants the full three-dimensional picture, choose the cube. Do not confuse it with the power/interest grid or the stakeholder cube.Study this in the guide → Resources and Team Responsibility Assignment Matrix (RACI) Tap to open What it is A responsibility assignment matrix is a grid that shows the project resources assigned to each work package. The matrix is used to illustrate the connections between work packages, or activities, and project team members. RACI stands for responsible, accountable, consulted, informed.When to use it Use it when planning resource management to make clear who does each activity, who decides, who is consulted, and who is informed; it is especially useful for teams mixing internal and external people.On the exam The iron rule: each activity has exactly one A (accountable), while there can be several Rs. R does the work, A answers for the result, C is asked before the work, and I is told afterward. Options about schedule, cost, or risk ranking are not what the matrix is for.Study this in the guide → Resource Breakdown Structure Tap to open What it is A resource breakdown structure is a hierarchical representation of resources by category and type. Examples of resource categories include but are not limited to labor, materials, equipment, and supplies. Resource types may include the skill level, grade level, required certifications, or other information as appropriate to the project.When to use it Use it as an output of Estimate Resources; it supports acquiring, managing, and reporting on resources.On the exam Do not confuse it with the WBS, which decomposes deliverables; this structure layers resources by category and type. The abbreviation RBS can also mean risk breakdown structure, so check whether the stem is about resources or risk sources.Study this in the guide → Tuckman Ladder Tap to open What it is The Tuckman ladder is one of the models used to describe team development; it includes five stages that teams may go through: forming, storming, norming, performing, and adjourning. These stages commonly occur in order, but a team may get stuck in a stage or fall back to a previous one.When to use it Use it to judge which development stage a team is in and to choose the leadership approach and team-building actions that fit.On the exam The Tuckman ladder is a common exam term. Read the signals in the stem: polite, surface-level exchanges mean forming; fights over solutions and refusals to give way mean storming; fewer disputes and willingness to follow agreements mean norming; little need for oversight means performing; members rotating off means adjourning. Storming having the most conflict and lowest efficiency is common exam practice. Members who have worked together before may skip stages.Study this in the guide → Conflict Resolution Techniques Tap to open What it is There are five general techniques for resolving conflict: withdraw/avoid, smooth/accommodate, compromise/reconcile, force/direct, and collaborate/problem-solve. The order listed does not indicate priority; each has its place and use.When to use it Use it when team members are in conflict; weigh the conflict's importance and intensity, urgency, the relative power of those involved, the importance of the relationship, and whether the aim is a short- or long-term resolution.On the exam With no special conditions in the stem, collaborate/problem-solve (win-win) comes first; this order of preference is common exam practice. Special conditions: urgent and you hold the authority, force/direct; minor conflict where the relationship comes first, smooth/accommodate; unimportant issue or emotions running high, withdraw/avoid; only a temporary or partial fix is needed, compromise/reconcile.Study this in the guide → Maslow's Hierarchy of Needs Tap to open What it is Maslow's hierarchy, a common exam term, holds that people have five levels of needs, from lowest to highest: physiological, safety, social, esteem, and self-actualization. As a rule, people do not pursue a higher level while a lower-level need is still unmet.When to use it Use it when choosing ways to motivate team members: first work out which level the person is currently missing, then pick the measure.On the exam Maslow's five-level model is a common exam term. Typical questions ask which level an action satisfies: stability and no fear of layoffs is safety; friendship, belonging, and connection with colleagues is social; achievement and recognition is esteem; learning, growth, and realizing potential is self-actualization. Social and esteem are the easiest to confuse.Study this in the guide → Herzberg: Hygiene and Motivational Factors Tap to open What it is Herzberg believed that job satisfaction and dissatisfaction stem from conditions called motivational factors. Motivational factors include matters that relate to the content of the work, such as achievement, growth, and advancement. He also identified hygiene factors related to the work, such as company policies, salary, and the physical environment; if they are insufficient they cause dissatisfaction, but even if they are sufficient they do not lead to satisfaction.When to use it Use it to judge whether a measure merely removes dissatisfaction or actually drives motivation, for example the difference between a raise, a better workplace, and a challenging assignment.On the exam Herzberg's two-factor model is a common exam term. Typical questions ask whether a factor is hygiene or motivational. Hygiene factors act like a threshold: without them people are dissatisfied, and with them people are merely not dissatisfied; motivators such as achievement, growth, and advancement drive greater effort. Salary is a hygiene factor.Study this in the guide → Team Charter Tap to open What it is The team charter is a document that establishes the values, agreements, and operating guidelines for the team. It may include team values, communication guidelines, decision-making criteria and processes, conflict resolution process, meeting guidelines, and team agreements.When to use it Develop it with the team before work starts so that how people work together is agreed in advance and there is something to point to when friction appears.On the exam The team charter covers how the team works together; do not confuse it with the project charter that authorizes the project. Ground rules should be set early with everyone taking part, with prevention first; handing out a charter after the fact or demanding signatures does not address the cause.Study this in the guide → Multicriteria Decision Analysis Tap to open What it is Multicriteria decision analysis is a technique that uses a decision matrix to provide a systematic, analytical approach for establishing criteria, such as risk levels, uncertainty, and valuation, to evaluate and rank many ideas.When to use it Use it when more than one candidate could fill a resource need, or when several options or vendors must be compared against multiple criteria.On the exam Steps: set the evaluation criteria, rank them and assign weights before applying them to candidates, score each candidate on each criterion, multiply scores by weights, add them up, and rank by total. Typical criteria for choosing people are availability, cost, experience, ability, skills, and attitude.Study this in the guide → Leadership Styles Tap to open What it is Management activities focus on the methods used to achieve project objectives, while leadership activities focus on people, including influencing, motivating, listening, and empowering. Styles that commonly appear on the exam are laissez-faire, transactional, charismatic, transformational, and servant, plus the directive and supportive pair from PMBOK 8 situational leadership. The project manager adjusts style to members' willingness and ability, the team's needs, the time sensitivity of tasks, and project complexity.When to use it Look at the audience first when leading a team: a newly formed team that has not worked together calls for directive plus coaching; a team starting to gel, participative; experienced and stable members, delegation plus support; a self-organizing team on an adaptive project, servant or supportive. This tiering is common exam practice.On the exam Name the style from the key action: goals and decisions left to the team with little intervention is laissez-faire; rewards and penalties for performance is transactional; personal appeal is charismatic; vision that inspires members to go beyond the status quo is transformational; meeting the team's needs first and removing obstacles is servant. Laissez-faire does not mean no management, and it causes trouble with a new team. When senior members complain about being over-managed, the project manager adjusts his or her own style. An option saying to "always keep the same style" is usually wrong. The laissez-faire, transactional, charismatic, and transformational classification is common exam practice.Study this in the guide → Risk Probability and Impact Matrix Tap to open What it is A probability and impact matrix is a grid for mapping the probability of occurrence of each risk and its impact on project objectives if that risk occurs. Where numeric values are used, probability and impact can be multiplied to give each risk a probability-impact score.When to use it Use it in qualitative risk analysis to rank individual risks and decide which to respond to first and which to analyze quantitatively.On the exam Threats and opportunities can share one matrix, with negative impact definitions for threats and positive ones for opportunities. Assess probability and impact separately, scoring against the definitions in the risk management plan. Qualitative analysis only ranks priority; it does not give an overall numerical result.Study this in the guide → Decision Tree Analysis Tap to open What it is Decision tree analysis is a diagramming and calculation technique for evaluating the implications of a chain of multiple options in the presence of uncertainty. Decision trees are used to support selection of the best of several alternative courses of action.When to use it Use it when choosing among several options whose outcomes depend on uncertain events; calculate the expected monetary value (EMV) of each branch to pick the best path.On the exam Common exam drawing: a square is a decision node, a circle is a chance node, and a triangle is the end of a branch. To tell square from circle, ask who decides: our choice is a square, the environment's is a circle. Path net value = benefit − costs along the path, and a chance node's EMV is the sum of probability × outcome.Study this in the guide → Monte Carlo Simulation and the S-Curve Tap to open What it is Monte Carlo analysis/simulation is a method of identifying the potential impacts of risk and uncertainty using multiple iterations of a computer model to develop a probability distribution of a range of outcomes that could result from a decision or course of action. Accumulating the results of thousands of iterations gives the S-curve.When to use it Use it in quantitative risk analysis to answer how confident you can be of finishing within the current budget or date, and how much more to add to raise that confidence.On the exam On the S-curve the horizontal axis is total cost (or finish date) and the vertical axis is the probability of not exceeding it, the confidence level; read it both ways: from a budget to a confidence, or from a confidence to a budget. Contingency reserve = the total cost at the chosen confidence − the base estimate without reserve. Cautious organizations often pick 75% or 85%, which is common exam practice.Study this in the guide → Sensitivity Analysis and the Tornado Diagram Tap to open What it is Sensitivity analysis helps to determine which individual project risks or other sources of uncertainty have the most potential impact on project outcomes. The analysis correlates variations in project outcomes with variations in elements of the quantitative risk analysis model; a typical display is the tornado diagram.When to use it Use it, as part of quantitative risk analysis, to find out which uncertain factors deserve the most management attention.On the exam Each bar of a tornado diagram is one factor, sorted from largest to smallest effect from top to bottom, wide at the top and narrow at the bottom; the longest bar has the greatest impact and gets management attention first. Common exam practice: sensitivity analysis changes one factor at a time while the others stay at baseline.Study this in the guide → Risk Breakdown Structure (RBS) Tap to open What it is A risk breakdown structure is a hierarchical representation of potential sources of risks. A common example groups sources into four top-level categories, technical, management, commercial, and external, each split into subcategories.When to use it Use it when identifying risks to help the team consider the full range of sources, and when categorizing risks by source during risk analysis.On the exam Categorize by risk source with the RBS and by affected area of the project with the WBS; do not mix them up. The lowest-level RBS categories can serve as a prompt list. The abbreviation RBS can also mean resource breakdown structure, so check whether the stem is about risk or resources.Study this in the guide → Threat Response Strategies Tap to open What it is There are five response strategies for threats: escalate, avoid, transfer, mitigate, and accept. Avoid targets the event so it no longer occurs; mitigate reduces probability and impact so it happens less or costs less; transfer hands responsibility and impact to a third party; accept takes no active step to reduce probability or impact; escalate passes it to a higher level when it exceeds your authority.When to use it Use it when planning risk responses: choose one strategy for each high-priority threat and record it in the risk register.On the exam The stem usually gives one scenario and asks which strategy it is. Examples: insurance or performance bonds are transfer; clarifying requirements or cutting scope is avoid; extra testing, a stable supplier, or a prototype is mitigate; setting aside contingency reserve is active acceptance; affecting several projects or exceeding your authority is escalate. Learn the strategy names exactly.Study this in the guide → Risk Register Tap to open What it is A risk register is a repository in which outputs of risk management processes are recorded. The risk register captures details of identified individual project risks.When to use it Start it when identifying risks, fill it in step by step as analysis, response planning, and monitoring are performed, and keep updating it throughout the project.On the exam The risk management plan says how to manage risk and contains no individual risks; individual risks go in the risk register, which starts with Identify Risks rather than with Plan Risk Management. When a new risk is found, record it in the register first, then analyze it.Study this in the guide → Opportunity Response Strategies Tap to open What it is There are five response strategies for opportunities: escalate, exploit, share, enhance, and accept, which parallel the threat strategies. Exploit raises probability to 100% so the opportunity definitely happens; share lets a third party take ownership and share the benefit; enhance increases the probability and/or impact; accept acknowledges the opportunity but takes no proactive action; escalate hands it to a higher level when it is outside the project's scope or authority.When to use it Use it when planning risk responses: choose one strategy for each high-priority opportunity and record it in the risk register.On the exam Learn the pairs: avoid with exploit, transfer with share, mitigate with enhance; escalate and accept apply to both. "Ensure" or "make sure it happens" in the stem is exploit; "improve the chance" or "cannot be guaranteed" is enhance; a joint venture or partner splitting the benefit is share; setting up a contingency reserve is active acceptance. Exploit versus enhance is the easiest mix-up, and this cue is common exam practice.Study this in the guide → Procurement Contract Types Tap to open What it is Contract types define the terms and conditions under which goods, services, or results are acquired from external sources. Contract types establish the framework for financial arrangements, risk distribution, and the nature of relationships among project stakeholders. The three most common basic types are fixed-price, cost-reimbursable, and time-and-materials.When to use it Use it when planning procurement: choose the type by how clearly the scope is defined, how risky the work is, and how much risk each side is willing to carry.On the exam A fixed-price contract passes cost risk to the seller and suits clearly defined scope; a cost-reimbursable contract pays actual cost plus a fee and suits uncertain scope or high risk; time-and-materials sits in between. Look at how the stem prices the work: billing at a daily rate points to time-and-materials, actual cost plus fee points to cost-reimbursable.Study this in the guide → Fixed-Price Contracts: FFP, FPIF, FP-EPA Tap to open What it is There are three fixed-price types: firm fixed price (FFP) sets the price once and for all; fixed price incentive fee (FPIF) sets a target cost, target profit, ceiling price, and sharing ratio; fixed price with economic price adjustment (FP-EPA) keeps the price fixed but adjusts it by an agreed index as outside prices move.When to use it Use FFP for well-defined scope; FPIF when you want buyer and seller to control cost together; FP-EPA for long performance periods where material prices or exchange rates will move.On the exam FPIF calculation questions are common: final profit = target profit + the seller's share ratio × (target cost − actual cost), with price capped at the ceiling. Under FFP the buyer's risk is lowest and the seller bears all overruns. These formulas are common exam practice.Study this in the guide → Make-or-Buy Analysis Tap to open What it is Make-or-buy analysis is the decision-making process of gathering and organizing data about product requirements and analyzing them against available alternatives, including the purchase or internal manufacture of the product. A make-or-buy analysis results in a make-or-buy decision as to whether particular work can be best accomplished by the project team or if it should be purchased from outside sources.When to use it Use it before procurement starts, when asking whether the work should be bought at all; only after deciding to buy do you write the statement of work and issue bid documents.On the exam The analysis must count all relevant costs, direct and indirect; beyond cost, consider current resources and skills, need for specialized capability, the wish to avoid long-term employment obligations, and the risk of each option. Lease-versus-buy questions use a break-even point: set the two total costs equal and solve for the number of days.Study this in the guide → Bidder Conference Tap to open What it is A bidder conference is a meeting with prospective sellers prior to the preparation of a bid or proposal to ensure all prospective vendors have a clear and common understanding of the procurement. Also known as contractor conferences, vendor conferences, or pre-bid conferences.When to use it Hold it after the bid documents go out and before sellers submit proposals, to answer questions and give all prospective sellers the same information.On the exam The key is fairness and transparency: treat all bidders alike and never answer privately for just one. Order: issue bid documents, bidder conference, receive proposals, evaluate, select the seller, negotiate, sign. Negotiation comes after the seller is selected and before signing; do not confuse it with the bidder conference.Study this in the guide → Claims and Alternative Dispute Resolution Tap to open What it is A claim (also called a dispute or an appeal) arises when buyer and seller cannot agree on whether something is a change or on compensation for it. Handle it in order: negotiation first, then alternative dispute resolution such as mediation or arbitration, and litigation last.When to use it Use it when a disputed change arises while controlling procurements, with the aim of staying out of court where possible.On the exam Negotiation is direct discussion with no third party; mediation uses a neutral third party to help the discussion but does not decide; arbitration ends in a binding decision by an arbitrator; litigation is the last resort. If asked for the first step, answer negotiation. This order is common exam practice.Study this in the guide → Agile and Hybrid Scrum Framework (3-3-5-5) Tap to open What it is The core of Scrum can be remembered as 3-3-5-5 (a common exam term): three accountabilities (Product Owner, Scrum Master, Developers), three artifacts (Product Backlog, Sprint Backlog, Increment), five events (the Sprint, Sprint Planning, Daily Scrum, Sprint Review, Sprint Retrospective), and five values (commitment, focus, openness, respect, courage).When to use it Use it when needs are vague and need refining, time is short, and requirements may change midstream; in each Sprint, the Developers select and complete the top-ordered Product Backlog items and produce a usable Increment.On the exam The 3-3-5-5 mnemonic is a common exam term. Questions may ask for the members of a category or which value a scenario demonstrates. The Sprint itself is an event and the other four events occur within it; artifacts are things, so events and people are not artifacts; Product Owner, Scrum Master, and Developers are the three accountabilities, and together they form the Scrum Team. Changes enter the Product Backlog and do not automatically disrupt a Sprint in progress.Study this in the guide → Kanban Method and Kanban Board Tap to open What it is The Kanban method is a visual workflow management method that limits work in progress (WIP) based on lean principles, focuses on continuous delivery, and avoids overburdening the team. A kanban board shows workflow states as columns; value flows left to right, and cards move from left to right as work advances.When to use it Use it for teams with a continuous flow of work and shifting priorities, such as operations and service work, to see flow and limit the amount of work in progress.On the exam WIP limits go on the in-progress columns; backlog and done columns usually need none. When a column is full, do not raise its limit or start new work; stop pulling new tasks and help the stuck stage, which is swarming. Kanban has no fixed Sprints and does not require a daily meeting.Study this in the guide → Cumulative Flow Diagram Tap to open What it is A cumulative flow diagram is a chart indicating features completed over time, features in other states of development, and those in the backlog. The horizontal axis is time, the vertical axis is the cumulative number of work items, and each state is one band.When to use it Kanban teams use it to see whether flow is improving: arrival rate, work in progress, cycle time, and lead time can all be read from it.On the exam Read vertically: the width of the in-progress band on a day is the work in progress. Read horizontally: the gap between the entry and exit lines estimates cycle time. The slope of the done line is throughput. A widening in-progress band signals a bottleneck: enforce the WIP limit and stop pulling new tasks first, then locate the bottleneck, rather than adding people first.Study this in the guide → Burndown and Burnup Charts Tap to open What it is A burndown chart is a graphical representation of the work remaining versus the time left in a timebox. A burnup chart shows the work completed toward a milestone: completed work starts at zero and keeps growing, with a separate total-scope line across the top.When to use it Use it to check progress each day or Sprint and forecast whether the work will finish on time; it is one of the most common charts on an information radiator.On the exam Reading it comes down to one step: subtract the ideal remaining from the actual remaining each day; actual above the ideal line means behind. When measuring in story points, only stories that meet the definition of done come off the remaining total. Use a burnup chart when scope changes: a burndown line that rises may mean work was finished and more was added, and it shows only the net result.Study this in the guide → Planning Poker and Story Points Tap to open What it is Planning poker is a way for the team to reach estimating consensus: everyone picks a card from a Fibonacci-like sequence and reveals at the same time; if estimates differ widely, the lowest and highest explain their reasoning and the team votes again. The unit is the story point, which reflects relative effort or complexity rather than absolute time.When to use it Use it in Sprint Planning or backlog refinement to estimate the relative size of user stories.On the exam Traps: comparing story points or velocity across teams (the scale belongs to each team), replacing discussion with an average, and having the Product Owner or an expert estimate on the team's behalf. Revealing cards at the same time avoids anchoring on others. The people who will do the work estimate it, and lines of code are not used.Study this in the guide → User Stories Tap to open What it is A user story is a brief, textual description of an outcome from a specific stakeholder perspective, and is a promise for a conversation to clarify details.When to use it Use it in adaptive projects to capture requirements and put them in the Product Backlog, leaving the details to be talked through when the work is about to start.On the exam The common three-part template is: as a <role>, I want <feature>, so that <value>, and the value clause matters most. The 3Cs (card, conversation, confirmation) and INVEST are common exam terms. Scenarios such as "too vague to verify" or "too big to estimate" point to the relevant INVEST criteria.Study this in the guide → Minimum Viable Product (MVP) Tap to open What it is A minimum viable product is a concept used to define the scope of the first release of a solution to customers by identifying the fewest number of features or requirements that would deliver value.When to use it Use it when the environment is uncertain and customer acceptance is unknown: build something usable cheaply first and let market feedback decide the next step.On the exam An MVP is not just cutting half the features: first find the must-haves without which the product cannot stand, then add some should-haves if needed. The aims are validating assumptions fast and failing early. When budget or time is tight or management wants a prototype, first work with the team to decide the minimum functions the product needs.Study this in the guide → Definition of Done (DoD) Tap to open What it is The definition of done is a checklist of all the criteria required to be met so that a deliverable can be considered ready for customer use.When to use it If the organization has a standard Definition of Done, the Scrum Team follows it as a minimum; otherwise, the Scrum Team creates one together. It is used throughout the Sprint to judge whether an Increment is done, and it may become stricter as the team matures, for example through more automation.On the exam It is the only standard for whether an Increment is done, regardless of whether the Sprint Review is over or time ran out; items that do not meet it go back to the Product Backlog. Do not confuse it with acceptance criteria (per story, agreed before development) or the definition of ready (whether an item is ready to enter a Sprint). To keep documentation in step, put updating it into the definition of done.Study this in the guide → PMP Flashcards: Key Tools, Techniques and Models: common questions Are the PMP flashcards free? Yes. They are free to flip online or print, with no account.
What is on the cards? 89 cards in 14 topics. Each card is one tool, technique or model the exam uses: the front has its name and a figure; the back says what it is, when to use it and how the exam tests it.
How are they different from the study guide? A card holds only the few lines that matter for one tool or model, so you can run through them again and again. The study guide has the full explanations and worked examples; every card links to its lesson.
Can I print them? Yes. Printing shows the front and the back of every card, and you can filter by topic first.