Scope
Requirements Elicitation
PMP · Scope · 4 lessons · about 47 min
Part of the free PMP video course: every lesson starts with its video →
What this chapter covers
Scope management starts with “finding out what everyone wants.” This chapter first looks at the Scope performance domain as a whole: it must capture all the work that is needed and perform no unnecessary work, and it contains six processes. It then focuses on the process that gathers the needs, Elicit and Analyze Requirements, which determines, documents and manages stakeholder needs and requirements and produces the requirements documentation. Next comes how to ask (techniques such as brainstorming, interviews, questionnaires and surveys, focus groups, benchmarking, prototypes and facilitated workshops), and how to decide and rank once you have the answers (voting, multicriteria decision analysis, MoSCoW, Kano analysis and others). The chapter ends with user stories and INVEST for adaptive projects.
The exam points in this chapter fall mainly in two areas: technique selection (the stem gives a situation and asks which technique to use) and handling conflicting and competing requirements through ranking. Matching the signals in the situation to the technique is the key to scoring here.
Lessons in this chapter
- Lesson 1: Scope Performance Domain: Value, Quality and the Six Processes. Why scope matters; the six processes and where they sit; project scope, product scope, requirement and scope baseline; how predictive and adaptive approaches differ.
- Lesson 2: Elicit and Analyze Requirements: Objectives, Inputs, Requirements Documentation and the Six Requirement Classes. The process's objective, inputs and outputs; the five criteria every requirement must meet before baselining; the six classes: business, stakeholder, solution, transition and readiness, project, and quality requirements.
- Lesson 3: Requirements Elicitation Techniques: From Brainstorming to Prototypes and Facilitation. A situation-by-situation comparison of the data gathering techniques; prototypes and storyboards; facilitated workshops (JAD and QFD are common exam names); affinity diagrams and mind mapping.
- Lesson 4: Decision Methods and Prioritizing Requirements: Voting, Multicriteria Analysis, MoSCoW and User Stories. Voting, autocratic decision-making, multicriteria decision analysis, the nominal group and Delphi; MoSCoW and Kano; relative weighting and virtual currency as agile practice; user stories and INVEST (relative weighting, virtual currency and INVEST are common exam practice; user stories are the adaptive way of expressing requirements that PMBOK 8 explicitly adopts).
Chapter map
Scope performance domain (capture all necessary work, do no extra work; quality is part of scope)
- Six processes: Plan Scope Management · Elicit and Analyze Requirements · Define Scope · Develop Scope Structure · Monitor and Control Scope · Validate Scope
- Elicit and Analyze Requirements
- Inputs: charter · business case · stakeholder register · requirements management plan ...
- Techniques: brainstorming · interviews · focus groups · questionnaires · benchmarking · prototypes · facilitation
- Decisions and ranking: voting · multicriteria decision analysis · nominal group · Delphi · MoSCoW · Kano
- Output: requirements documentation (six classes); the requirements traceability matrix links requirements to deliverables (next chapter)
Adaptive: user stories → backlog → INVEST check (common exam practice)
Lesson 1
Scope Performance Domain: Value, Quality and the Six Processes
Lesson overview
Scope is the starting point of the whole project. What you will do and what you will not do shape how schedule, cost, risk and quality are arranged afterward. This lesson looks at the Scope performance domain from the top: what problem it solves, which six processes it contains, where those processes sit in the project, and what a few concepts that keep coming back in later chapters (project scope, product scope, requirement, scope baseline) actually mean. ECO: Process domain, Task 2 (Develop and manage project scope). This lesson is the entry point to the scope topic, and each later chapter covers one of the processes.
What problem the Scope domain solves
The Scope performance domain opens with this idea: “Scope carries a unique and central place in project management, as the value of a project derives from the outcome delivered in alignment with its scope.” The domain does two things. First, it ensures that the project encompasses all of the work required to complete the project successfully. Second, it plans only the required work and performs no unnecessary work. The first guards against omissions and the second guards against doing too much; together they help optimize cost and schedule and maximize the project's value.
The domain also covers quality. PMBOK 8 says: “Quality is defined by meeting stakeholder expectations and fulfilling the project and product requirements.” So the Scope domain does not stop at “what did we build?” It also asks whether what was built can pass the acceptance criteria and whether the way it was built is effective and efficient. Quality is an integral attribute of scope: the scope of a bridge-construction project includes the bridge itself, and also target thresholds for how sturdy and long-lasting it should be.
The exam often uses a multiple-response question that asks which practices are appropriate when developing and managing project scope. Three kinds of practice are appropriate: reaching agreement with stakeholders on the scope; decomposing the scope level by level; and, once the scope baseline is set, handling changes through a formal change control procedure (in a predictive environment; in adaptive projects the product owner usually approves changes dynamically through the backlog). Three kinds are inappropriate: saying yes to every request, deliberately leaving the boundary undefined, and changing the baseline casually.
The six processes and where they sit
The Scope performance domain contains six processes, shown in the figure below. Plan Scope Management, Elicit and Analyze Requirements, Define Scope and Develop Scope Structure belong to planning; Monitor and Control Scope and Validate Scope belong to monitoring and controlling. The domain has no separate executing process: the actual building of deliverables is done under project execution.
| Process | In one sentence | Covered in |
|---|---|---|
| Plan Scope Management | Create a scope management plan that documents how the project and product scope will be defined, validated and controlled | Project scope statement |
| Elicit and Analyze Requirements | Determine, document and manage stakeholder needs and requirements to meet project objectives | Requirements elicitation; requirements traceability matrix |
| Define Scope | Develop a detailed or high-level description of the project and product, and identify the quality requirements and standards for the deliverables | Project scope statement |
| Develop Scope Structure | Subdivide project deliverables and project work into smaller, more manageable components | Work breakdown structure |
| Monitor and Control Scope | Monitor the status of the project and product scope, manage changes to the scope baseline, and measure the quality of the deliverables | Scope creep |
| Validate Scope | Formalize acceptance of the completed project deliverables | Validate Scope |
The six processes can be strung into one line: set the rules first; then find out what everyone wants; choose what will be built and write it down as a description; break it into assignable work; keep watch while the work is done so it does not drift; and when it is done, ask the customer to formally accept it.
Concepts that keep coming back
Project scope is the work performed to deliver a product, service or result with the specified features and functions. Product scope is a description of the features, functions and characteristics of the product, service or result the project is intended to deliver. Its focus is the deliverables themselves, including their quality and performance specifications. A simple way to tell them apart: project scope answers “what work must be done?” and product scope answers “what will the thing we build look like?”
A requirement is a condition or capability that is necessary to be present in a product, service or result to satisfy a business need. When you elicit requirements you collect and analyze the needs of all parties; when you define scope you then use value, priority and constraints to decide which requirements go into the project and what work they require. There are usually more candidate requirements than requirements finally included, but requirements and scope are not like-for-like things whose numbers you can compare directly.
The scope baseline, in predictive environments, is the approved version of formal scope documents that can be changed using formal change control procedures and is used as the basis for comparison to actual results. It forms part of the performance measurement baseline, which also includes the schedule baseline and the cost baseline. In a predictive project, the WBS, together with the project scope statement and the WBS dictionary, constitutes the scope baseline. For adaptive approaches, the baseline is defined at the beginning of each iteration and aligned with the prioritized requirements, based on the value expected from the delivery. In adaptive environments, it is usually a product owner who dynamically approves changes, without a formal change control procedure.
Adaptive and hybrid projects add two more concepts. The product backlog is a dynamic, prioritized list of work items and features. The definition of done is a checklist of all the criteria required to be met so that a deliverable can be considered ready for customer use.
In practice: tailoring by project type
Predictive projects define the scope as completely as possible during planning, and after the baseline is set they apply change control strictly. Adaptive projects write requirements as user stories, place them in the backlog and elaborate the near-term work in each iteration. In a hybrid project, overall expectations may be set with a scope baseline while sub-teams work through the backlog iteratively, which can make tailoring more challenging. PMBOK 8 also lists factors to consider when tailoring: dependencies on external partners (decide how scope will be integrated into contractual agreements), how dynamic the environment is (if it changes quickly, bring in iterative feedback), and the design phase (in industries such as pharmaceuticals and construction, invest more in early scope definition so that late changes are not prohibitively expensive).
Example: a lunch-reservation app for a community senior center
A neighborhood office starts a project to build a small app that lets seniors reserve lunch so the canteen can cook to the reservations. In Plan Scope Management, the team decides how change requests will be submitted. In Elicit and Analyze Requirements, they talk with senior representatives, canteen cooks and volunteers and list more than twenty wishes, such as “voice ordering”, “scan-to-collect” and “ingredient traceability”. In Define Scope they choose only the first two, and “ingredient traceability” is written into the exclusions. In Develop Scope Structure they split the work into three parts: reservation, a kitchen preparation board and meal pickup verification. During execution a volunteer suggests adding a “points lottery”. Monitor and Control Scope finds that it is not in the baseline, so it goes through change control. Finally the neighborhood office's representative tries the app and signs off, and Validate Scope is complete.
Worked examples
Example 1 Concept question: appropriate practices for developing and managing scope
An e-commerce website redesign uses a predictive approach, and the project manager is responsible for the project scope from development through management. Which THREE of the following practices are appropriate? (Select THREE.)
Show answer and explanation
Correct answer: BDE
The project uses a predictive approach, and the project manager owns the scope from development through management. (Adaptive projects manage scope through the product backlog and iteration planning, with lighter governance.) The question asks which three practices are appropriate when developing and managing the project scope.
The Scope performance domain is about identifying all of the work required, and only the work required, to complete the project successfully. In practice, developing and managing scope comes down to three things. First, reach agreement with stakeholders on the project scope, so everyone shares one basis for what is and is not included (B). Second, decompose the scope level by level into smaller parts that can be assigned, forming the work breakdown structure (D). Third, once the scope baseline exists, handle every change through the formal change control process, evaluated and approved before taking effect (E). These three correspond to define, decompose and control. The answer is BDE.
Why the other options are wrong
- A. Agreeing to every new request immediately lets unevaluated, unapproved work into the project. That is the source of scope creep and goes against “do no unnecessary work.”
- C. Without a clear scope boundary, the team and stakeholders have no shared basis for what is in and out, and deliverables cannot be checked against the baseline; with a blurred boundary, changes cannot be recognized or controlled either.
Key takeaway Three scope management tasks: define and agree, decompose, and control through change procedures.
Variation If the stem described an adaptive project, scope would usually be managed through the product backlog and iteration planning: the product owner orders the backlog, and, in Scrum, no change that endangers the iteration goal is made during the iteration. E would then be not a “formal change control process” but governance light enough for that life cycle.
Something wrong with this question?
Common traps
Common trap
- Thinking the Scope domain only covers “what to build”. It also covers quality, and quality is an integral attribute of scope.
- Confusing project scope with product scope. The first is the work; the second is the features, functions and characteristics of the product.
- Treating requirements as scope. Requirements are needs that are collected and analyzed; scope is the product features and project work that are defined and approved on that basis. They are not like-for-like things whose quantities you can compare directly.
- Assuming adaptive projects have no scope baseline or no scope management. They manage scope too; the baseline is simply set at the start of each iteration and the product owner approves changes flexibly.
- Confusing Validate Scope with Monitor and Control Scope. The former is formal acceptance by the customer, the sponsor or another authorized stakeholder; the latter is internal monitoring and management of changes.
Key takeaways
- Goal of the Scope domain: capture all the work required to complete the project successfully and do no unnecessary work; quality belongs to it as well.
- Six processes: Plan Scope Management, Elicit and Analyze Requirements, Define Scope and Develop Scope Structure (planning); Monitor and Control Scope and Validate Scope (monitoring and controlling).
- Project scope is the work performed to deliver the product; product scope is the features, functions and characteristics of the product, service or result.
- The scope baseline is the approved version of the scope documents. In predictive projects it is made up of the project scope statement, the WBS and the WBS dictionary, and changes go through formal change control.
- Adaptive projects set the scope baseline at the start of each iteration, manage scope with a backlog, and the product owner approves changes flexibly.
- To develop and manage scope: reach agreement with stakeholders, decompose level by level, and control changes by procedure.
Lesson 2
Elicit and Analyze Requirements: Objectives, Inputs, Requirements Documentation and the Six Requirement Classes
Lesson overview
One of the most common reasons projects fail is that “what was built is not what the customer wanted.” The Elicit and Analyze Requirements process exists to find out, early in the project, what stakeholders really want and to write it down. This lesson covers the process's objective, inputs and outputs; what the most important output, the requirements documentation, looks like; and how requirements are divided into six classes. The next lesson covers how to ask (elicitation techniques), and the one after covers how to choose and rank once you have the answers. ECO: Process domain, Task 2 (Develop and manage project scope).
Objective, inputs and outputs of the process
A requirement is a condition or capability that is necessary to be present in a product, service or result to satisfy a business need. The objective of Elicit and Analyze Requirements is to define and document the stakeholders' needs associated with the features and functions required in the product, service or result, to assure quality and value will be delivered to stakeholders. Its key benefit is that it provides direction and a starting point to define a product, service or result that will add value to stakeholders.
The main inputs are the project charter (elements from PMBOK 8 Table 4-1 such as the high-level project description, boundaries and key deliverables), agreements, the business case, the assumption log, the lessons learned register, the stakeholder register (to know whom to ask and what each one needs and expects), the requirements management plan and the scope management plan. The main output is the requirements documentation. Common exam practice also treats the requirements traceability matrix as an output of this process; the next chapter covers it.
One detail is often overlooked: Elicit and Analyze Requirements is not “hold a few meetings and listen.” It means determining, documenting and managing. Determining is finding the needs, documenting is writing them down, and managing is tracking them afterward until delivery. So the process starts early in the project, but its results are used by later processes throughout.
What requirements documentation looks like
Requirements documentation is a description of how individual requirements should meet the business needs of the project. Requirements may start out at a high level and become progressively more detailed as more information becomes known. Before being baselined, requirements should be unambiguous (measurable and testable), traceable, complete, consistent, and acceptable to key stakeholders. These five criteria are what the exam uses to judge whether a requirement is well written. For example, “the system must run fast” cannot be measured and fails; “the order page opens within 3 seconds” is unambiguous.
The format is open. At its simplest it is a list of all the requirements, categorized by stakeholder and priority; at its most elaborate it has an executive summary, detailed descriptions and attachments, and may include static or dynamic graphic information.
Common trap
Requirements documentation holds requirements (what is wanted), not scope (what will and will not be done). Requirements are recorded in the requirements documentation; scope is selected from them by the later Define Scope process and written into the project scope statement. Likewise, the requirements management plan contains no specific requirements, and the scope management plan contains no specific scope.
The six classes of requirements
Requirements are classified by source and nature so that each class can be refined in turn and nothing is missed. PMBOK 8 lists six classes:
| Class | Meaning | Example (campus parcel-locker app) |
|---|---|---|
| Business requirements | Strategic objectives and high-level needs of the organization | Reduce the backlog of parcels at the collection point |
| Stakeholder requirements | The needs of a stakeholder or stakeholder group | Students want a pickup-code text message |
| Solution requirements | Features, functions and characteristics of the product that will meet the business and stakeholder needs; grouped into functional and nonfunctional | Functional: scan a code to open the locker. Nonfunctional: no lag with 500 people collecting at once |
| Transition and readiness requirements | Temporary capabilities needed to move from the current state to the desired future state | Migrate old logbook data; train the security staff |
| Project requirements | Actions, processes or other conditions the project should meet | Must go live before the semester starts; contractual payment milestones |
| Quality requirements | Any condition or criteria required to validate successful completion of a deliverable or fulfillment of other project requirements | Locker doors still work after 100,000 open-close cycles; pass the fire inspection |
Functional requirements describe the behaviors of the product, such as the actions, processes, data and interactions it should execute. Nonfunctional requirements complement functional requirements by specifying the performance, security and operational criteria essential for product effectiveness and user satisfaction, such as reliability, security, performance, safety, level of service and supportability. A common way to decide in multiple-choice questions: data conversion and training go under transition and readiness; milestone dates and contractual obligations go under project; tests and certifications go under quality.
In practice: turning requirements from sources into documents
One way to understand the process is the following order (a common summary to help memory). First check the charter, the business case and the stakeholder register to learn whom to ask and what to solve. Then choose suitable techniques to collect requirements (next lesson). Sort what you collect into the six classes, remove duplicates and resolve contradictions. Rewrite each item in an unambiguous, measurable form. Review with key stakeholders and gain their acceptance. Finally, baseline them. A predictive project collects requirements as completely as it can during planning, and after the baseline changes only go through change control. An adaptive project collects requirements as user stories, places them in the backlog ranked by priority, and clarifies them gradually over several iterations.
Example: a requirement before and after
On the parcel-locker project, a student representative says: “Picking up a parcel should be convenient.” That is not yet a good requirement, because “convenient” cannot be measured. After follow-up questions, the project manager rewrites it as two requirements: “Students enter a pickup code or scan a code in the app to open the locker” (a functional requirement), and “Opening a locker takes no more than 3 steps, and during peak hours (5:00 to 7:00 p.m.) the locker responds within 2 seconds” (a nonfunctional requirement). The manager then records the source (student union), priority and owner, and only after review and approval can the requirements enter the baseline.
Worked examples
Example 1 Scenario question: at acceptance, “it is not what the customer wanted”; where should this have been prevented?
A smart camera development project reaches its closing stage. The finished product is technically very advanced, but at acceptance the client says it is not the specification they originally asked for. What should the project manager have done to avoid this outcome?
Show answer and explanation
Correct answer: A
The project is at closing. The product is technically advanced, but at acceptance the client says it is not the specification originally requested. The question asks how to avoid this outcome at its source.
A product that is advanced but does not match the specification the client expected shows that the team never established what the client actually wanted. To avoid this outcome, act at the requirements stage: elicit and analyze requirements to find out the client's real needs, write them as clear, measurable and traceable requirements documentation, and have the main stakeholders confirm it. Scope, design and acceptance then have something to be checked against. Prevention comes from the source, so the answer is A.
Why the other options are wrong
- B. A retrospective is where the team reviews lessons learned and improves later work. It happens after the fact and cannot ensure the product matches the client's specification.
- C. Changing the client's requirements to suit the supplier's standards puts things backward: the project exists to meet the client's needs, and the stem gives no information about any supplier standard.
- D. A full-team review before delivery can only find problems at the last stage, too late to correct cheaply. Real prevention happens at the requirements stage.
Key takeaway To avoid “what we built is not what the client wanted,” elicit and confirm the client's requirements clearly early on.
Variation If the question were “a specification mismatch is found before delivery; what should you do first,” the answer would change to verifying against the requirements documentation and the requirements traceability matrix, then going through change control, rather than asking how to prevent it.
Something wrong with this question?
Example 2 Scenario question: how to help stakeholders see what will be built
You have been appointed project manager to add new functions to the company's smart Q&A chatbot. The project management office has approved the project charter, but several key stakeholders are discouraged: they feel that what comes out will be no different from what they have now. To help them see what requirements the project is meant to meet and to remove their doubts, what should you do?
Show answer and explanation
Correct answer: B
The project charter is approved, but key stakeholders worry that what is delivered will be no different from what exists today. The question asks how to help them see the requirements the project is meant to meet.
Their doubt comes from not knowing exactly which functions and capabilities the final product will have. Requirements documentation is the document that describes how individual requirements meet the business need. Writing each functional requirement in it in detail describes the product's behavior and capabilities, so stakeholders can see how the new functions differ from the existing product and their doubts disappear. The answer is B.
Why the other options are wrong
- A. A business case is an economic feasibility study, with cost-benefit content as well. The charter is already approved, so there is no need to redo the whole thing, and it would not explain specific functions.
- C. A work breakdown structure decomposes deliverables and work to organize and assign the work. It is not a document that explains requirements to stakeholders, and with the requirements still unclear the conditions for decomposition are not met.
- D. Quality requirements are the conditions or standards for confirming that deliverables have been completed successfully. The stakeholders' worry is about what functions will be built, not how acceptance standards are set.
Key takeaway To let stakeholders see “what will be built,” spell out the functional requirements in the requirements documentation.
Variation If the stem were changed to “stakeholders worry there will be no standard at acceptance,” you would add quality requirements to the requirements documentation and write the acceptance criteria into the scope statement.
Something wrong with this question?
Common traps
Common trap
- Requirements are not scope. The requirements documentation collects all the requests; the scope statement decides which are done.
- The requirements management plan contains no requirements, and the scope management plan contains no scope.
- The requirements documentation is an output of Elicit and Analyze Requirements. “Where do requirements come from?” is asking about inputs (charter, business case, stakeholder register and so on).
- Words like “satisfying, convenient, fast” are not unambiguous and cannot go into the baseline. Before baselining, requirements must be unambiguous, traceable, complete, consistent and accepted.
- A quality requirement is a condition or criterion for validating a deliverable; it is not a functional requirement. Do not confuse acceptance criteria with functions.
Key takeaways
- Elicit and Analyze Requirements defines and documents stakeholder requirements; its output is the requirements documentation (and, as common exam practice, the requirements traceability matrix).
- Before baselining, each requirement is unambiguous (measurable and testable), traceable, complete, consistent and accepted by key stakeholders.
- Six classes: business, stakeholder, solution (functional and nonfunctional), transition and readiness, project, and quality.
- Requirements documentation describes how individual requirements should meet the business needs of the project; the scope statement defines the approved project and product scope, major deliverables, acceptance criteria and explicit exclusions.
- To avoid “not what the customer wanted,” elicit and confirm requirements accurately up front.
- Adaptive projects collect requirements as user stories and keep ranking them in the backlog.
Lesson 3
Requirements Elicitation Techniques: From Brainstorming to Prototypes and Facilitation
Lesson overview
Knowing that you need to collect requirements is not enough; you also have to choose how. This is the most frequently tested part of Elicit and Analyze Requirements: the stem gives a situation (a large crowd, confidential information, needs that are hard to put into words, opinions that have clashed) and asks “which technique should the project manager use?” This lesson arranges the common techniques into a table by the situation they suit, and then covers three that are easy to confuse: prototypes, facilitated workshops, and affinity diagrams versus mind mapping. The previous lesson covered what requirements documentation looks like; the next covers how to decide and rank once the requirements are collected.
Data gathering techniques: one table by situation
The techniques most often used to elicit requirements are the data gathering techniques, and each has the situations it does best. The common exam practice is to read the situation in the stem first and then match it to a technique (the table below is a summary).
| Technique | Characteristics | Suits this situation |
|---|---|---|
| Brainstorming | Led by a facilitator, produces many ideas in a short time; has two parts, idea generation and analysis | You need a wide range of ideas and solutions and welcome free expression |
| Interviews | Talking to stakeholders directly, with prepared and spontaneous questions; one-on-one or many-to-many | You need in-depth information, especially sensitive or confidential information, in a setting of trust and confidentiality |
| Focus groups | Prequalified stakeholders and subject matter experts are brought together and a trained moderator guides an interactive discussion | You want to learn the expectations and attitudes of a group of similar people toward a proposed result |
| Questionnaires and surveys | Written questions that quickly collect information from a large number of respondents | Many people, dispersed locations, a fast turnaround, statistical analysis |
| Benchmarking | Comparing your products, processes and practices with those of comparable organizations known to do well; the comparison may be inside or outside the organization or across industries | You want to borrow proven practices and find improvements |
Three more: document analysis reviews existing agreements, business plans, process documentation, current process flows and so on; design thinking is nonlinear, iterative and human-centered, working through understanding users, challenging assumptions and redefining the problem, then prototyping and testing; and meetings bring the relevant people together to discuss requirements.
Here is the table translated into signal words in questions. “A huge number of people, spread across a dozen countries, statistics needed” points to questionnaires and surveys. “Sensitive, confidential, never worked together before” points to interviews. “Bring together people from the same field and hear their attitudes toward the new product” points to a focus group. “Need a large number of ideas” points to brainstorming. “Peers already have a ready-made best practice” points to benchmarking. When there are no signal words, eliminate the options that do not fit the situation and choose from what remains.
Example: three techniques, each useful in the same project
A pharmacy chain is building a member app. To learn the usage habits of the two hundred store managers across the country, send questionnaires and surveys, which can be collected and tallied within days. To learn the head-office legal team's concerns about user-data compliance, which is sensitive information, use interviews. To hear ten longtime members explain why they would or would not order through the app, use a focus group so they can spark ideas off one another. Which technique to choose depends on the number of people, how sensitive the information is and whether interaction is needed, not on which technique sounds more advanced.
See first, then revise: prototypes and storyboards
A prototype is a working model used to obtain early feedback on the expected product before actually building it. Stakeholders can experience the model directly instead of imagining the finished product from text. So when you need stakeholders to experience a working model and give early feedback (for example, the business side says “I'll know it when I see it”), consider a prototype first. An organization entering a new field with no experience is only a supporting condition and cannot by itself decide on a prototype. When users find it hard to describe their current work or process, observation/conversation can also be used. You build first, then revise from feedback, and the requirements become clearer round by round as people try them.
A storyboard is a prototyping technique that uses pictures or diagrams to show how a user goes through a process; adaptive projects often use it to present user stories. Prototypes, storyboards and wireframes all count as “modeling”, creating a simplified representation of a system, solution or deliverable.
Common trap
When customers find it hard to state their requirements in words alone, a prototype is usually more direct than interviews alone; interviews can still be used alongside it to probe and clarify. Expert judgment is judgment based on expertise, experience or training, and the experts may come from inside or outside the organization, but it cannot replace users' own feedback on what they need. The Delphi technique is mainly used to collect experts' opinions anonymously and bring them gradually together. A judgment the exam often asks for: the customer cannot articulate the needs and they must be clarified through hands-on experience, so choose the prototype.
Facilitation and requirements workshops
Facilitation is the ability to effectively guide a group event to a successful decision, solution or conclusion. A facilitator helps ensure the following: there is effective participation; participants achieve a mutual understanding; all contributions are considered; conclusions or results have full buy-in according to the decision process established for the project; and actions and agreements that are achieved are appropriately dealt with afterward.
When stakeholders disagree about requirements, you can use facilitation, meetings and conflict management, and facilitation is usually carried out by holding a facilitated workshop. The difference from brainstorming is purpose: brainstorming aims to produce many ideas, while facilitation aims to bring parties with different opinions to consensus. Workshops have two common industry forms (these two names are common exam terms; PMBOK 8 defines facilitation and lists facilitated workshops as an example of a meeting that can help parties build mutual understanding and full buy-in): joint application design (JAD) is mainly used in the software industry to elicit and analyze requirements; quality function deployment (QFD) is used in manufacturing and focuses on translating customer needs into product characteristics and ranking them. Note that having everyone first state their views separately and then discuss and rank them in a structured way is the nominal group technique (covered in PMBOK 8; see Lesson 4), not QFD.
Organizing ideas: affinity diagrams and mind mapping
After brainstorming you have a pile of scattered ideas that need organizing. An affinity diagram puts similar ideas into the same group; for example, “screen, camera, speaker” go under hardware and “interface, alert sound” go under software. Mind mapping uses a diagram with connecting lines to organize information and show the links between ideas, forming a layered network; it does not require an affinity diagram first. An affinity diagram stops at classification, whereas a mind map also draws the connections.
Worked examples
Example 1 Scenario question: many people, dispersed, statistics needed; which technique?
A multinational retail group starts a store system upgrade project. The project manager has identified a very large number of stakeholders spread across more than ten countries. To lay the foundation for defining the product scope and project scope, which technique should the project manager use to elicit and analyze requirements?
Show answer and explanation
Correct answer: C
In eliciting and analyzing requirements on this project, the stakeholders are very numerous and spread across more than ten countries. The question asks which technique lays the foundation for defining the product scope and project scope.
First pick out the three signals in the stem: many people, dispersed locations, and a need for wide coverage. A questionnaire collects information quickly from a large number of respondents through written questions, and suits varied audiences, dispersed locations and cases where quick completion and statistical analysis are wanted. This matches the conditions of the question exactly. When choosing a technique, look at the size and distribution of the audience first, then at whether the information is sensitive and whether interaction is needed. The answer is C.
Why the other options are wrong
- A. An interview is a one-on-one or small-group in-depth conversation, suited to sensitive information. With so many dispersed people, the cost and time would be unaffordable.
- B. Nominal group uses a structured session in which selected participants first propose ideas independently, then discuss and rank them. Even when conducted virtually, it is not suited to obtaining broad coverage from a very large stakeholder population spread across more than ten countries.
- D. A focus group brings selected people together for a moderator-led discussion. Even when conducted remotely, it is not suited to obtaining broad coverage from a very large group scattered across many countries.
Key takeaway Many people, dispersed locations, need to tally: choose questionnaires and surveys.
Variation If the question were changed to “learn sensitive information from a few key people with high confidentiality needs,” choose interviews. If it were “ask ten long-time users to spark ideas off each other about their experience,” choose a focus group.
Something wrong with this question?
Example 2 Scenario question: the business side cannot articulate the requirements
A vacation-rental booking app project is eliciting and analyzing requirements. The business side admits that it cannot state the full requirements and will know whether something fits only when it sees it. What is the MOST suitable action for the project manager?
Show answer and explanation
Correct answer: D
On a vacation-rental booking app project, the business side admits it cannot describe the full requirements and has to see something before knowing whether it fits. The question asks for the most suitable action.
When requirements cannot be stated, start with a prototype: let the business side see and try it, then revise on their feedback, and the requirements gradually become clear. A prototype is a working model used to obtain early feedback before the product is actually built. The business side does not have to describe things from nothing, the project manager does not have to guess, and the requirements converge by demonstrating and iterating on feedback. The key signal in this kind of question is “has to see it to know”: the requirements are tacit and are difficult to elicit fully through description alone. The usual way to surface tacit requirements is prototypes and iterative demonstrations: each round of feedback makes the requirements more concrete until they can be documented. The answer is D.
Why the other options are wrong
- A. The business side has said it cannot do this, and pressing them will only produce an inaccurate list.
- B. Developing from the project manager's own understanding is very risky. What results is likely to differ from what the business side wants, and rework is costly.
- C. Pausing until the business side has thought it through will not necessarily help, since thinking alone may not clarify things, and it only delays the project.
Key takeaway When requirements cannot be stated, use a prototype so stakeholders can see it, try it and give feedback.
Variation If the business side can state its requirements, interviews and requirements documentation can be used directly. On an adaptive project, a prototype can likewise be used before the product is actually built to obtain early feedback.
Something wrong with this question?
Example 3 Scenario question: opinions differ and you need expectations all parties accept
For half a year a project manager has been unable to settle the project scope. The team and the client keep revising the requirements, and the schedule drags on longer and longer. What should the project manager do to finish defining the scope?
Show answer and explanation
Correct answer: B
For half a year the project manager has been unable to settle the project scope. The team and client keep revising the requirements and the schedule keeps stretching. The question asks what to do to complete the scope definition.
The core problem is that the parties have no consensus on the requirements. A facilitated workshop is one of the meeting types listed in PMBOK 8: it brings key stakeholders together, and a facilitator guides the discussion toward agreement on the deliverables and on the project and product boundaries. It speaks directly to “opinions keep changing and nothing can be finalized.” Choose a tool that fits the problem: if consensus is missing, use a meeting-based technique that builds consensus; if information is missing, use techniques that gather information, such as interviews or questionnaires. The answer is B.
Why the other options are wrong
- A. Training improves team skills, but it cannot resolve the present disagreement among the parties that is keeping the scope from being settled.
- C. Reviewing the collected requirements again offers no mechanism for resolving the disagreement, so the cycle of revisions may simply continue.
- D. Finalizing the requirements inside the team and then sending them to the client bypasses client participation and is likely to trigger another round of revisions.
Key takeaway When opinions diverge and consensus is needed, use a facilitated workshop.
Variation If the stakeholders agree but are numerous and geographically scattered, switch to a technique that collects input uniformly, such as a questionnaire.
Something wrong with this question?
Common traps
Common trap
- Disagreement that needs consensus: facilitation. A large number of ideas: brainstorming. Scoring and choosing among several alternatives: only then multicriteria decision analysis (see the next lesson).
- The software industry often maps to joint application design and manufacturing to quality function deployment (common exam practice). The real basis for the choice is always “competing requirements need consensus, so facilitation”; the industry is only a supporting clue, and you must also look at the purpose of the workshop: JAD focuses on working together to clarify system requirements, while QFD focuses on turning customer needs into technical requirements and ranking them.
- Interviews versus focus groups: an interview is an in-depth conversation with one person or a few and suits sensitive information; a focus group is an interactive discussion among a group of similar people.
- Questionnaires and surveys collect information in writing in one direction, with no interaction, so they cannot resolve a disagreement that has already appeared.
- An affinity diagram mainly groups a large number of ideas for analysis; a mind map can organize and show the links between ideas, and PMBOK 8 also lists it among the brainstorming techniques, where it can consolidate ideas and generate new ones.
Key takeaways
- Brainstorming for ideas, interviews for in-depth or sensitive information, focus groups for the attitudes of one type of person, questionnaires for reach and statistics, benchmarking for borrowing best practice.
- Document analysis, design thinking and meetings are also techniques PMBOK 8 lists.
- When you need early feedback on a working model to clarify the expected product, use a prototype (observation/conversation helps when users cannot describe current work; lack of experience is only a supporting condition). A storyboard is a kind of prototype, often used for user stories.
- For disagreement that needs consensus, use a facilitated workshop. JAD for software and QFD for manufacturing are common exam names.
- An affinity diagram groups ideas; a mind map draws the links between ideas with lines.
- Exam tip (common exam practice): start with the signals in the situation: number of people, geography, confidentiality, interaction, industry, and whether there is prior experience.
Lesson 4
Decision Methods and Prioritizing Requirements: Voting, Multicriteria Analysis, MoSCoW and User Stories
Lesson overview
Once requirements are collected, three problems usually appear: there are too many to finish, some contradict each other so they cannot all be met, and they differ in value so they should not be treated equally. The remedy is decision-making and prioritization. This lesson first covers how a group reaches a decision (voting, autocratic decision-making, multicriteria decision analysis, the nominal group, Delphi). It then covers how requirements are prioritized (MoSCoW, the 100-point method, cost of delay and Kano analysis, plus relative weighting and virtual currency, which are common in agile practice; those two are common exam practice). Finally it covers user stories and the INVEST check for adaptive projects (also agile practice and common exam practice). The previous two lessons covered where requirements come from, and this lesson is downstream of them: the prioritized requirements feed the later Define Scope work, which determines the requirements that go into the project scope statement. ECO: Process domain, Task 2 (Develop and manage project scope).
How a group makes a decision
| Method | Meaning | Key point |
|---|---|---|
| Unanimity | Everyone agrees on a single course of action | Requires every person to agree. (Delphi seeks consensus through anonymous rounds, which is not the same as unanimity; see below.) |
| Majority | Support from more than 50% of the members | The group usually has an odd number of participants so that there is no tie |
| Plurality | The largest block decides, even if it is not a majority | Commonly used when there are more than two options |
| Autocratic decision-making | One individual makes the decision for the whole group | Fast, but produces no consensus |
| Multicriteria decision analysis | Uses a decision matrix: rank and weight the criteria first, then score and rank each alternative | Criteria such as risk level, uncertainty and valuation |
Multicriteria decision analysis is intuitive in practice. Say the parcel-locker project must choose one of three locker suppliers on three criteria: price (weight 40%), failure rate (35%) and after-sales response (25%). Each supplier is scored 1 to 5 on each criterion, then multiplied by the weights and added. Supplier A scores 4, 3, 5 for a weighted total of 4×0.4 + 3×0.35 + 5×0.25 = 3.9; supplier B scores 3, 5, 3 for 1.2 + 1.75 + 0.75 = 3.7; supplier C scores 2, 4, 3 for 0.8 + 1.4 + 0.75 = 2.95. Supplier A ranks first. The key is to fix the criteria and weights first, and score afterward.
The nominal group technique is a structured method used to facilitate group decision-making by gathering input from participants in a systematic manner. All ideas are put forward before any discussion takes place, so participants speak equally and the dominance of more vocal members is reduced; it suits large groups dealing with controversial topics. The Delphi technique asks experts for opinions anonymously, compiles and summarizes them, and feeds the results back, so that over several rounds the opinions gradually converge (Delphi is a common exam term here). Anonymity keeps authority from swaying others, and the rounds of feedback make opinions converge, which reduces subjective bias. The difference between the two: the nominal group ranks ideas by voting and requires neither anonymity nor multiple rounds; Delphi addresses anonymous, multi-round convergence of expert opinions; it is not one of the requirements elicitation techniques covered in the previous lesson.
How requirements are prioritized
Prioritization/ranking ranks requirements (and can also rank stakeholders; the stakeholders with the most interest and the highest influence are often placed at the top). MoSCoW is tested most often. The other methods listed are the 100-point method (each participant gets 100 points and distributes them across the requirements by importance; the higher the total, the higher the priority), cost of delay (ranking by the cost incurred by delay) and Kano analysis.
MoSCoW sorts requirements into four tiers: must have (without it you cannot release; it must be delivered on time), should have (important but not fatal; can be postponed), could have (done only if capacity allows) and will not have (explicitly not done this time).
Kano analysis classifies requirements based on their effect on user satisfaction, reflecting that product performance and satisfaction do not have a linear relationship. After an iteration review an adaptive project receives new requirements, and Kano analysis can be used to judge which would raise satisfaction the most and to plan later iterations. It is used for classifying and ranking; it is not an estimating method and does not directly measure project value.
When ranking user stories on an adaptive project, agile practice also commonly uses two other approaches (they come from the Agile Practice Guide and common exam practice; PMBOK 8 lists only MoSCoW, the 100-point method, cost of delay and Kano analysis under prioritization). Relative weighting evaluates both the positive benefit a feature brings and the negative impact of not having it, and ranks accordingly, relying on expert judgment. Virtual currency gives the people taking part in the ranking a sum of virtual funds, and they use this “money” to vote on the features.
Example: when there are more requirements than resources
The parcel-locker project collects 32 requirements, but resources cover only about 20. The project manager first sorts them by MoSCoW. Twelve, such as “scan a code to open the locker” and “pickup-code text message”, are must haves; nine, such as “overdue reminder” and “lost-parcel report”, are should haves; seven, such as a “leaderboard”, are could haves; four, such as “face-recognition pickup”, are will not haves this time. Two contradictory requirements (pickup without logging in versus pickup with verified identity) go to the sponsor, who weighs value and feasibility and decides. The ranking is accepted and becomes an input to Define Scope.
Adaptive environments: user stories and INVEST
In adaptive environments, requirements are collected as user stories and then placed in the backlog by priority. A user story is a brief, textual description of an outcome from a specific stakeholder perspective, and is a promise for a conversation to clarify details. A typical user story describes the stakeholder's role (who benefits), goal (what they need to accomplish) and motivation (the benefit to them).
INVEST is a commonly used set of principles in agile practice for checking the quality of user stories (common exam practice): Independent, Negotiable, Valuable, Estimable, Small and Testable. Estimable means the team can estimate the effort from the information it has, and if information is lacking you clarify first. Small means the story is small enough to be completed within one iteration, ideally, and a story that is too large should be split. Testable means the description is specific: “the page should be fast” cannot be tested, while “the home page opens within 2 seconds” can. Items near the top of the backlog should be prepared in detail, and items further down can be rougher, to be refined as their iteration approaches.
Requirements work in predictive versus adaptive projects
- Predictive: collect requirements as completely as possible during planning and write them into the requirements documentation; after the baseline, changes can be made only through formal change control.
- Adaptive: requirements become clear gradually over several iterations. Each iteration makes the short-term requirements clear, rolling-wave planning elaborates the longer-term requirements step by step, and they enter the backlog as user stories and are ranked continuously.
Worked examples
Example 1 Scenario question: contradictory requirements; how to get a scope that can be approved
A supermarket chain needs a membership points system to support its business expansion, and only one month remains before the release date. The sponsor asks the project manager to finish requirements collection as soon as possible. The team has collected requirements documents from many parties, but some of the requirements contradict one another and cannot all be met. To ensure the project succeeds, what should the project manager do?
Show answer and explanation
Correct answer: D
The project is between requirements collection and defining scope. Only one month remains before release, and the requirements collected contradict one another and cannot all be met. The question asks what the project manager should do to ensure the project succeeds.
Contradictory requirements mean that not every requirement is feasible, so trade-offs are needed. The right approach is to prioritize the requirements first: evaluate them on value, feasibility and the attention and influence of those who raised them, set an order of priority, align it with the sponsor's expectations and obtain approval of the scope. This resolves the conflict and makes the scope a version that can be approved and executed. The answer is D.
Why the other options are wrong
- A. Moving all the heavily conflicting requirements out without weighing value and priority may remove the most critical requirements too.
- B. The conflicting requirements and their schedule impact have not yet been assessed, so submitting a change request to extend the schedule is premature and does not resolve the conflict among the requirements.
- C. Having all users vote on site reflects only numbers and ignores value, feasibility and the influence of those who raised the requirements. The result may still conflict, and it is not a normal channel for scope approval.
Key takeaway When requirements contradict one another, prioritize them by value and stakeholder expectations, then obtain scope approval.
Variation On an adaptive project the product owner would order the same conflicts by value in the backlog, and near-term iterations would take the top items first without waiting for every conflict to be resolved.
Something wrong with this question?
Example 2 Concept question: what “should have” means in MoSCoW
A team building an online learning platform uses the MoSCoW method to order backlog items. What does an item labeled “should have” mean?
Show answer and explanation
Correct answer: A
In an adaptive environment, the team uses the MoSCoW method to order backlog items. The question asks what an item labeled “should have” means.
MoSCoW sorts requirements into four levels of importance, from highest to lowest: must have, then should have, then could have, and finally will not have this time. Should have means important but not critical: without it the release will not fail, but some value is lost, and when time is tight the item can be deferred. The simplest way to judge each level is to ask “what happens without it?” Without it the release cannot happen: must have. Without it some value is lost: should have. Without it almost nobody minds: could have. The answer is A.
Why the other options are wrong
- B. An item explicitly not going to be done in this release is “will not have,” not “should have.”
- C. Something the team will consider only if it has spare capacity corresponds to “could have,” which ranks below “should have.”
- D. An item without which the product cannot be released and which must be delivered on time is “must have.”
Key takeaway “Should have”: important but not critical, and can be deferred.
Variation If the question asked what to do when a “must have” item cannot be finished: if it is still confirmed to be indispensable for this release, adjust other scope, resources or dates. Only after the business owner reassesses it and confirms it is no longer a release requirement may its priority be changed.
Something wrong with this question?
Example 3 Concept question: ranking user stories by benefit and loss from absence
A company's internal expense reimbursement system is being developed using an agile approach. To order several user stories, the organization requires scoring each on two measures separately, “the relative benefit of building the feature” and “the relative penalty of not having the feature,” and then comparing the totals. According to common exam practice, which method should the agile team use?
Show answer and explanation
Correct answer: D
On an adaptive project, the team must order several user stories for an expense reimbursement system. The organization requires two separate scores, the relative benefit of building the feature and the relative penalty of not having it, and then a combined comparison. The question asks which method to use.
The two scoring bases in the stem, one the relative benefit of building the feature and the other the relative penalty of not having it, are exactly what relative weighting does: it evaluates both the positive benefit a feature brings and the negative effect of its absence, and orders the user stories accordingly, usually relying on expert judgment. Note that relative weighting is a common exam practice term. The prioritization methods PMBOK 8 lists are MoSCoW, the 100-point method, cost of delay and Kano analysis. Among the options here, only relative weighting fits “benefit plus penalty of absence, scored on two measures.” The answer is D.
Why the other options are wrong
- A. Virtual currency gives participants a sum of play money to spend voting on the features. It does not ask for an evaluation of benefit and penalty.
- B. MoSCoW classifies requirements into four tiers: must, should, could and will not have. It is not calculated from benefit and penalty.
- C. Kano analysis classifies and ranks requirements by their effect on user satisfaction. It does not calculate benefit and penalty.
Key takeaway To order user stories by benefit and penalty of absence, use relative weighting (common exam practice).
Variation If the stem said “give each participant a sum of virtual money to bid on features,” the answer would be virtual currency. If it said “classify by effect on satisfaction,” it would be Kano analysis.
Something wrong with this question?
Common traps
Common trap
- The basis for ranking is value and stakeholders' interest and influence, not who is loudest. Once criteria are agreed, the group can also rank collectively with methods such as the 100-point method (virtual currency is an agile practice).
- When requirements contradict each other, first rank them and assess value and feasibility, then obtain approval. Do not first remove all the conflicting requirements, and do not rush to submit a schedule-extension change request.
- Delphi makes expert opinions converge; it is not one of the elicitation techniques from the previous lesson. The nominal group ranks by voting but does not require anonymity or multiple rounds.
- Do not mix up the four names: relative weighting (benefit plus loss from absence), MoSCoW (four tiers), Kano (satisfaction) and virtual currency (voting with handed-out money). Relative weighting and virtual currency are agile practice and common exam practice.
- In INVEST, “Testable” requires a specific description. A story that is too large is mainly a “Small” problem, not an “Independent” problem; only if it cannot be estimated because it is too large do you also check “Estimable”.
Key takeaways
- Group decisions: unanimity, majority (more than 50%), plurality, autocratic, and multicriteria decision analysis (weight first, then score).
- The nominal group has everyone put forward ideas first and then discuss and rank; Delphi is anonymous and multi-round, with opinions gradually converging.
- Prioritization/ranking can apply to stakeholder requirements or to stakeholders themselves; requirements are usually ranked by value, cost of delay and similar criteria, and stakeholders usually by interest and influence.
- The four MoSCoW tiers: must have, should have (important but can be postponed), could have, will not have; others are the 100-point method, cost of delay and Kano analysis.
- Adaptive: user stories go into the backlog. Two ranking approaches that are common exam practice: relative weighting looks at benefit plus loss from absence, and virtual currency votes with handed-out “money”.
- INVEST (common exam practice) has six characteristics for checking user stories; items at the top are detailed and items further down are rough.
This chapter has 41 questions in the full bank; the questions beyond the worked examples are practiced in the question bank. Practice this chapter.