PMP Formula Sheet: Every Formula in the Study Guide

Every PMP formula in the study guide, by topic and chapter, free to read or print. Each chapter links to the study guide lesson that explains its formulas. For each lesson's key points and traps, see the cheat sheet, and for key tools and models the flashcards.

All PDF downloads →

Formulas by topic

The sheet holds 59 formulas from the study guide; the worked numbers in the examples are left out. The topics with the most are Finance (30), Schedule (13) and Procurement (6). The other 9 topics have no formulas and are not listed.

Schedule13 formulas · 3 of 9 chapters

Multipoint (Three-Point) Estimating

Expected Duration (Triangular Distribution)tO optimistic, tM most likely, tP pessimistic duration; the simple average of the three values
Expected Duration (Beta Distribution, PERT)A weighted average with the greatest weight on the most likely value; use it when the question does not name a distribution (common exam practice)
Back-Solving the Pessimistic Value (Beta Distribution)Used when the expected duration tE and the other two estimates are known
Activity Standard Deviation (PERT)The usual PERT approximation of uncertainty from the estimate range; the wider the range, the larger the standard deviation

Critical Path Method

Critical Path DurationList every path, add up the durations (DU) along each, and take the largest; it is the shortest project duration; applies to FS relationships with no resource constraints (common exam practice); for a simple FS chain with lags or leads, path length = sum of durations + lags − leads; with SS, FF or SF relationships or other constraints, do a forward pass on the actual network logic. For example, activities of 5, 3 and 4 days with a 2-day lag in between: 5 + 3 + 4 + 2 = 14 days, not 12
Float of a Simple Parallel PathOnly for simple parallel branches with no extra constraints, as a quick judgment; the total float of an activity is still calculated as LS − ES or LF − EF
Early StartForward pass takes the maximum; Day 1 start convention, for FS networks with no leads or lags; if the project start is counted as Day 0 the formulas have no ±1 (common exam practice)
Early FinishDU is the activity duration; Day 1 start convention, for FS networks with no leads or lags; if the project start is counted as Day 0 the formulas have no ±1 (common exam practice)
Late FinishBackward pass takes the minimum; Day 1 start convention, for FS networks with no leads or lags; if the project start is counted as Day 0 the formulas have no ±1 (common exam practice)
Late StartDU is the activity duration; Day 1 start convention, for FS networks with no leads or lags; if the project start is counted as Day 0 the formulas have no ±1 (common exam practice)
Total FloatHow long an activity can be delayed without delaying the project completion date or violating a constraint; the two forms must agree, so use one to check the other
Free FloatHow long an activity can be delayed without delaying the early start of its successor; for consecutive day counting, FS relationships and no leads or lags; with several successors use the earliest ES; FF ≤ TF

Crashing vs. Fast Tracking

Crash Cost SlopeExtra cost per day saved; crash the lowest-slope activity on the critical path first and re-analyze the critical path after compressing (common exam practice)
Finance30 formulas · 5 of 5 chapters

Estimate Costs

Cost Estimate: Beta Distribution (PERT) Expected ValueO optimistic, M most likely, P pessimistic estimate; use the beta distribution when the question does not name a distribution (common exam practice); when it says "triangular distribution" or "simple average" use (O+M+P)/3
Cost Estimate: Triangular Distribution Expected ValueA simple arithmetic mean; the common formula given in PMBOK 8
Cost Estimate: Standard Deviation and ±1σ IntervalCommon exam practice: the standard deviation of the beta distribution is taken as (P − O) ÷ 6, not divided by 3; E ± σ is a one-standard-deviation interval around the expected value, not the full range of the estimate (the full range is O to P); only under a normal approximation does E ± σ cover about 68%. For example, O=40, M=52, P=82: E = 55, σ = 7, E ± σ = 48–62, while the full estimate range is 40–82

Cost Baseline and Reserves

Cost BaselineThe common case with reserves managed implicitly (default in exams): the cost baseline contains contingency reserve and not management reserve; how reserves are included depends on the financial management plan and organizational policy
Project BudgetWith reserves managed implicitly; when management reserve is used the baseline rises and the reserve falls, so the total budget is unchanged; do not add contingency reserve to the baseline again (double counting)
Total Funding RequirementTotal funding requirements are derived from the cost baseline; funds are usually released in increments and may be uneven

Earned Value Management

Budget at CompletionThe total value of all planned work, i.e. the cost baseline, not including management reserve; the cumulative PV at the planned completion date equals BAC
Planned ValueThe budgeted value of the work scheduled to be complete as of the status date (usually the data date), read from the time-phased baseline; common exam practice: for simplified questions with evenly spread work and a single unit of measure, PV = planned quantity of work × budgeted unit rate (for example 200 m planned at a budgeted $40/m gives PV = $8,000)
Earned ValueThe value of the work actually completed as of the status date, measured by the budget authorized for that work, regardless of actual cost; common exam practice (when percent complete is weighted by budget): EV = actual quantity of work × budgeted unit rate = BAC × percent complete (for example BAC $300,000 and 60% complete gives EV = $180,000)
Actual CostThe cost actually incurred for the work completed as of the status date; take it from the cost records, not from percent complete; common exam practice: for simplified questions with a single unit of measure and costs taken at actual unit rates, AC = actual quantity of work × actual unit rate (for example 180 m at $50/m gives AC = $9,000)
Schedule Variance> 0 ahead of schedule, < 0 behind schedule
Cost Variance> 0 under budget, < 0 over budget
Schedule Performance Index> 1 ahead of schedule, < 1 behind schedule
Cost Performance Index> 1 under budget, < 1 over budget

Estimate at Completion

Estimate at Completion (basic identity)AC is the actual cost incurred to date and ETC is the expected cost of all the remaining authorized work; the four methods below differ only in how ETC is obtained
Estimate at Completion (atypical variance)The remaining work will be done at the originally planned rate
Estimate at Completion (typical variance)Current cost performance continues to the end
Estimate at Completion (cost and schedule performance both matter)The remaining work is affected by both cost and schedule performance
Estimate at Completion (new estimate)A bottom-up re-estimate of the remaining work
Estimate to CompleteThe cost still needed to finish the remaining work
Variance at Completion< 0 means a forecast overrun
To-Complete Performance Index (target: BAC)> 1 harder to achieve, < 1 easier to achieve
To-Complete Performance Index (target: EAC)Use when BAC is no longer achievable
Forecast Total Duration (simplified linear method)Common exam practice, a simplified linear method: it assumes planned work and budgeted value are spread evenly over the planned duration and that percent complete equals percent of budgeted value; when current performance continues, SPI takes the current value and the formula reduces to planned total duration ÷ SPI; when the remaining work follows the plan, SPI = 1. For example, 24 days planned, 30% complete on day 10: SPI = 7.2 ÷ 10 = 0.72, forecast total duration = 10 + 16.8 ÷ 0.72 ≈ 33.3 days; with the remaining work on plan it is 10 + 16.8 = 26.8 days

Net Present Value and Value Evaluation

Present ValueFV is the future amount, r the discount rate, n the number of years
Net Present ValueCFt is the net cash inflow in year t, I0 the initial investment (a positive number), r the discount rate, n the number of years; NPV > 0 is acceptable, choose the largest positive value; if later outflows such as added investment exist, use NPV = Σ[t=0..n] CFt/(1+r)^t with CF0 negative
Internal Rate of ReturnThe discount rate at which NPV equals zero, with signed cash flows (CF0 is the initial investment, negative); compare it with the organization’s required rate of return, and above it the project is acceptable on this financial criterion; it normally has to be solved by trial or software; for mutually exclusive projects choose the largest NPV by default, and look at IRR only when the question asks to compare by the highest rate of return
Payback Period (undiscounted)I0 is the initial investment; T0 is the construction period (add it only when there are no inflows during it and payback is measured from project start); CF is the equal net inflow per period; N is the number of full periods after which cumulative inflows have not yet recovered the investment, and CFN+1 is the inflow of the period in which it is recovered (assumed to arise evenly within the period); shorter is better; ignores the time value of money; the undiscounted payback period is common exam practice, and when the question says discounted, use discounted cash flows. For example, investment $900,000, 6-month construction, then $50,000 net per month: PP = 6 + 900 ÷ 50 = 24 months; investment $600,000 with inflows of $200,000, $250,000 and $300,000: PP = 2 + (600 − 450) ÷ 300 = 2.5 years
Return on InvestmentNet investment gain = benefits − investment cost; higher is better; ignores the time value of money. Common exam practice (use only when the question gives this convention; period and annualization follow the question or the organization’s definition): ROI = average annual profit ÷ total investment × 100%. For example, investment $2,000,000 and cumulative 5-year profit $1,500,000: by the general definition (treating the profit as the net gain) period ROI = 1,500 ÷ 2,000 = 75%; by average annual profit = 300 ÷ 2,000 = 15% per year
Benefit-Cost RatioCompare benefits and costs after bringing them to the same point in time; when the question already gives comparable benefit and cost amounts, use them directly; > 1 is acceptable, higher is better (BCR > 1 and NPV > 0 are the same judgment). For example, present value of benefits $2,600,000 and investment $2,000,000: BCR = 1.3
Quality2 formulas · 1 of 4 chapters

Control Charts

Control Limits (Mean ± 3σ)μ is the process mean and σ (sigma) the standard deviation of the process data; the simplified exam model of individual values, approximately normal, centered on the mean (common exam practice); real control chart formulas depend on the statistic and subgroup size
σ from the Control LimitsThe same simplified model; the mean μ = (UCL + LCL) ÷ 2
Stakeholders and Communication1 formula · 1 of 4 chapters

Plan Communications Management

Number of Communication Channelsn is the number of communication participants as defined by the question; whether the project manager, sponsor and so on are included depends on the question's scope of interconnection; the common exam way to count potential communication channels
Risk3 formulas · 3 of 7 chapters

Qualitative Risk Analysis

Risk ScoreThe probability-impact score, used to compare relative priority; threats use negative impacts and opportunities positive ones

Quantitative Risk Analysis

Contingency Reserve (from the S-Curve)Pick the confidence level according to the organization's risk attitude (for example 75% or 85%), then read the total cost off the S-curve (common exam practice); management reserve cannot be read directly from the S-curve

Decision Tree Analysis

Expected Monetary Value (EMV)Pi is the probability of scenario i; the probabilities at one node add up to 1; Vi is the net value of that path, equal to the payoff minus the costs along the path
Procurement6 formulas · 1 of 4 chapters

Contract Types

FPIF: Final ProfitCommon exam practice: first determine whether actual cost is above the PTA; the difference in brackets is positive for a saving and negative for an overrun; the sharing ratio is written buyer/seller, for example 80/20; above the PTA the price is capped and the seller bears the whole overrun. For example, target cost 100, target profit 10, ceiling price 120, 80/20: at actual cost 90 profit = 10 + 20% × 10 = 12; at actual cost 125 profit = 120 − 125 = −5
FPIF: Final PriceCommon exam practice: first determine whether actual cost is above the PTA, then apply the sharing ratio; If the calculated price exceeds the ceiling price, the ceiling price is paid (once actual cost passes the PTA the seller bears the whole overrun)
Point of Total Assumption (PTA)Common exam practice; The actual cost at which the price just reaches the ceiling price; target price = target cost + target profit; use the buyer's sharing ratio as a decimal or percentage; first determine whether actual cost is above the PTA, then decide between the sharing ratio and the ceiling price; for example target cost 100, target price 110, ceiling price 120, buyer 80%: PTA = 100 + 10 ÷ 0.8 = 112.5
CPFF: Final PaymentThe fee never changes; any extra cost is borne by the buyer
CPIF: Final FeeIf the contract sets a minimum and maximum fee, limit the calculated fee to between them; do not assume limits the question does not give
CPIF: Buyer's Final PaymentThere is no ceiling price; the buyer's total payment rises with actual cost
Agile and Hybrid4 formulas · 3 of 14 chapters

Burndown Charts and Information Radiators

Ideal Burndown LineThe ideal line falls at a constant rate from the committed total to zero at the end of the timebox; actual remaining minus ideal remaining shows ahead or behind

Release Planning and Prioritization

Average VelocityOnly accepted stories count; usually expressed in story points completed per iteration
Iterations NeededRound up when whole iterations are needed to deliver

Kanban

Little’s LawHolds for stable flow with a consistent system boundary; counting only work in progress gives average cycle time; counting the backlog queue as part of the system (backlog + WIP) gives average lead time; throughput = work items completed per unit of time; it gives an average and cannot fix a pile-up at one step. For example, 20 items in progress and 5 finished a day: cycle time = 4 days; 6 items in progress plus 3 in the backlog at 3 items/day: cycle time = 6 ÷ 3 = 2 days, lead time = 9 ÷ 3 = 3 days

Common questions

Is the formula sheet free?

Yes. It is free to read or print, with no account.

Does it cover every formula?

It has every formula in the study guide, from its 93 chapters, grouped by topic and chapter.

What is the difference between the formula sheet and the study guide?

The study guide explains each formula, with worked examples and practice questions; each chapter on this sheet links to it. The formula sheet is for checking the equations quickly.

Can I print one topic?

Yes. Choose a topic and print; each topic starts on a new page.