Free PMP Practice Test: 120 Questions with Explanations
120 PMP sample questions weighted like the current exam: 40 People, 49 Process and 31 Business Environment, covering 26 of the 26 tasks of the Exam Content Outline. The mix has single-answer questions, 8 multiple-answer questions (you must select every correct option) and 8 graph-based questions. Timed mode gives 80 seconds a question, 160 minutes in all; or practice untimed. Every question has a full explanation: why the answer is right and what is wrong with each other option. When you submit you get your total score, your accuracy in each of the three domains and a readiness check.
Updated 2026-11-22 · aligned to the current Exam Content Outline and PMBOK Guide 8th Edition
8 free PMP practice tests
No question appears in two tests, so you can work through them one after another or pick any.
Test 1
120 questions
People 40 · Process 49 · Business 31
This pageTest 2
108 questions
People 28 · Process 49 · Business 31
StartTest 3
107 questions
People 28 · Process 49 · Business 30
StartTest 4
107 questions
People 28 · Process 49 · Business 30
StartTest 5
107 questions
People 28 · Process 49 · Business 30
StartTest 6
106 questions
People 27 · Process 49 · Business 30
StartTest 7
106 questions
People 27 · Process 49 · Business 30
StartTest 8
106 questions
People 27 · Process 49 · Business 30
Start
Ready to start?
Your answers are saved in this browser, so you can refresh or come back later. No account needed.
You can read every question below before you start; the answer options unlock when you press Start.
- Question 1
On a community home-care services platform project, the scope statement has been approved, and the project manager and core team are in place. The project manager has to take two weeks of leave for an urgent family matter, and in that time the team drafts the project schedule on its own. When the project manager returns, the detailed schedule is almost complete. What should the project manager do?
Show answer and explanation
Correct answer: B
The scope statement is approved. While the project manager was away for two weeks, the team drew up a detailed schedule on its own, and it is nearly finished by the time the manager returns. What should the project manager do?
The schedule is part of the project management plan, and the plan must align with the purpose and objectives in the charter, the approved scope and the project vision. The project manager did not take part in building it and its quality is unknown, so the first step is to check whether the schedule fits the vision and objectives and then judge from that whether to adjust it. Verify first, then decide. The basis for the check is the purpose and objectives in the charter, the approved scope and the project vision, not the project manager's personal preference or who built it. The answer is B.
Why the other options are wrong
- A. Scrapping the plan before checking its quality both wastes the team's work and has no basis.
- C. The plan has not been checked, and key stakeholders have not agreed to it. By common exam practice the kick-off meeting is usually scheduled after the project management plan is approved and before execution begins. This plan has not yet been checked, so it is not time to start execution.
- D. Having the team draft the plan while the project manager is on leave is a normal arrangement and not a violation, and there is no need to report it to the PMO first.
Key takeaway When reviewing a plan someone else prepared, first check that it is consistent with the vision and objectives, then decide whether to adjust it.
Variation If the check shows it matches the charter objectives, move on to review and approval. If conflicts show up among the sub-plans, have the responsible people integrate and align them.
- Question 2
During an industrial IoT project, a problem emerges that can be solved only by adding budget and extending the schedule. The team had not listed it as a risk during identification, and the sponsor points out that similar situations occurred on the company's past projects. What should the project manager have done beforehand to avoid this oversight?
Show answer and explanation
Correct answer: A
During an industrial IoT project, a problem emerges that requires added budget and a longer schedule. It was not listed as a risk during identification, and the sponsor points out that similar situations occurred on past company projects. The question asks what the project manager should have done beforehand.
The key signal is “occurred on past projects”, which points to historical information. Risk identification should make full use of organizational process assets, among which the archived lessons learned repository and the historical risk data of past projects record the risks and lessons of similar earlier projects. Consulting them during identification would have revealed risks that occurred before and may occur here, avoiding the omission. So beforehand the project manager should have consulted the lessons learned repository and the risk data of past projects. The other three are a plan framework, an organizational attitude and a response measure, and none of them brings in historical risks. The answer is A.
Why the other options are wrong
- B. The risk categories in the risk management plan are only a framework for identifying and recording, helping to classify; they do not tell the project what specific risks have occurred.
- C. Risk appetite decides how much risk the organization is willing to take. It answers “how much can we accept” and does not help identify “what risks there are”.
- D. Contingency reserve is a response to identified risks. If a risk has not been identified, there is nothing to allocate reserve to in a targeted way, and this is a response, not identification.
Key takeaway To avoid missing risks that have occurred before, consult the lessons learned repository and past projects' risk data during identification.
Variation If the stem said the company had never done a similar project and there was no history to consult, you would rely on brainstorming, interviews and expert judgment instead.
- Question 3
During execution of a smart warehouse system integration project, the company is acquired by a large enterprise, and the project sponsor is now a vice president from the acquirer. The project manager has already identified and analyzed the new sponsor and updated the relevant assessment information in the stakeholder register. The new sponsor wants to learn the project status and plans to hold a project review meeting. What should the project manager do?
Show answer and explanation
Correct answer: B
During execution the company is acquired and the sponsor is replaced by the acquirer's vice president. The project manager has identified and analyzed the new sponsor and updated the relevant assessment information in the stakeholder register. The new sponsor wants to understand the status and plans a review meeting. The question asks what the project manager should do.
A change of sponsor means a stakeholder's needs may have changed, and the existing communication arrangements may not suit the new person. Before the review meeting, first carry out a communication requirements analysis to find out the type, format and frequency of information the new sponsor needs, then update the communications management plan so later communication meets those requirements. This is the standard pattern: when needs change, analyze first, then update the plan, then choose the method. The answer is B.
Why the other options are wrong
- A. Sending the performance report directly, without confirming the format and content the new sponsor wants, may not give the sponsor what is needed.
- C. Introducing team members has no direct bearing on understanding project status and is not what the new sponsor needs right now.
- D. The issue log is a project document for recording and tracking issues. What the new sponsor needs now is the overall status and the information needed for decisions, not a raw list of issues. It also cannot replace first analyzing communication needs and updating the communications management plan.
Key takeaway When a stakeholder's information needs or communication preferences may have changed, first run a communication requirements analysis, then update the communications management plan, and only then send information or hold meetings.
Variation If it changed to “the customer's liaison is replaced and is cold toward the project,” and the cause is that report content, format or frequency do not meet the person's needs, the answer is again to analyze communication requirements first. If the cause is mainly insufficient engagement, first analyze and develop the matching stakeholder engagement strategy. If “a new external stakeholder was added,” add that stakeholder to the stakeholder register and analyze the stakeholder's influence, needs, and expectations together before updating the relevant plans.
- Question 4
An in-house office system development project is planned to go live after nine months, and the sponsor is very concerned about the go-live date. One month before go-live, the tester tells the project manager that a quality defect in data synchronization has been found and fixing it will take an extra week. What should the project manager do?
Show answer and explanation
Correct answer: D
One month before go-live, a tester has found a data synchronization defect that takes an extra week to fix, and the sponsor cares about the go-live date. The defect has already occurred, so it is an issue, not a risk. The question asks what the project manager should do.
A defect that has already occurred needs the project manager to actively resolve it. First develop a response plan to minimize the effect on the go-live date (for example by changing the order of fixes or adding testing resources), then meet with the sponsor to discuss it, so that the sponsor sees a response plan rather than only bad news. There is action and communication. The answer is D.
Why the other options are wrong
- A. Pushing the go-live date back a week directly amounts to changing the baseline without going through change control, and no attempt has been made to reduce the effect. It is not the first thing to do.
- B. The defect has already happened and should go in the issue log; the risk register records uncertain events that have not yet happened. Merely recording and explaining it also does not solve the problem.
- C. Having the expert explain it to the sponsor passes the project manager's own responsibility to someone else, and no response measures have been developed.
Key takeaway The problem has already occurred, so the project manager first finds a way to reduce the impact and communicates with the sponsor; it is not recorded as a risk and the baseline is not changed directly.
Variation If the stem said the defect was “expected to possibly appear,” that is a risk, to be recorded in the risk register with a response planned. If the response plan requires changing the go-live baseline, submit a change request.
- Question 5
A drone inspection project needs someone proficient in lidar calibration. Nobody in the organization has this skill, and the project manager needs to secure the person from an external organization. Which tool or method should the project manager use?
Show answer and explanation
Correct answer: A
A drone inspection project needs a person proficient in lidar calibration, which nobody in the organization has, so the project manager must secure someone from an external organization. The question asks which tool or method to use.
PMBOK 8 notes that the project manager or team should collaborate, effectively negotiate and influence others who are able to provide resources for the project. Negotiation is a discussion aimed at reaching an agreement, used to achieve support or agreement. Since nobody in the organization has this skill, you must negotiate with an external organization or supplier to obtain the scarce specialist. This negotiation takes place within the established sourcing strategy—for example, a partnership, joint venture, or procurement process. The answer is A.
Why the other options are wrong
- B. Preassignment applies when resources were determined before the project began, such as specific people named in a competitive proposal or dependence on particular persons' expertise. Here the person has not yet been determined.
- C. Multicriteria decision analysis uses a decision matrix to score and rank, and is used to choose among candidates or options already identified. Here there are no candidates yet.
- D. Virtual teams address how to collaborate when members are geographically dispersed. They cannot produce scarce people from nowhere and are not a means of securing external resources.
Key takeaway For a scarce special resource that nobody internal has, negotiate with an external organization to secure it.
Variation If there are several internal candidates and one must be chosen, use multicriteria decision analysis to score the candidates against criteria.
Reference Estimate Resources and Acquire Resources · Lesson 2: Acquire Resources: Negotiate First, Preassignment and Multicriteria Decision Analysis
- Question 6
PMLyceum's smart speaker development project has a new project manager. A week after he takes over, the engineer responsible for integration reports that the power module and the main control module cannot be assembled together. Investigation shows that the cause is a deviation in the description of work of one component. In which document should the project manager check these descriptions of work?
Show answer and explanation
Correct answer: B
Component integration has failed, and the cause points to a deviation in the description of work of one component. The description must be checked in a document that records the detailed description of the work.
The WBS dictionary is a document that provides detailed deliverable, activity, scheduling, cost and resource information about each component in the WBS. Its contents include the code of account identifier, description of work, assumptions and constraints, responsible organization, acceptance criteria and so on. The description of work is exactly dictionary content, so to check a component's description of work, look in the WBS dictionary. When you see the words “description of work,” “a component” and “check,” think of the dictionary: the WBS gives the structure, the dictionary gives the explanation of each component, and the two together let an integration problem be traced to a specific deviation in the description. The answer is B.
Why the other options are wrong
- A. The WBS shows only the hierarchical decomposition of deliverables and work. It does not contain a detailed description of each component.
- C. The requirements documentation records the various requirements and their source. It is not a description of the work content of specific work packages.
- D. The scope statement describes the scope, deliverables, acceptance criteria and exclusions of the whole project. It does not reach the descriptions of work at the component level.
Key takeaway A component's description of work is recorded in the WBS dictionary; to check the work content, look there.
Variation To determine what is explicitly not within the scope of the whole project, look at the project exclusions in the scope statement.
Reference Work Breakdown Structure · Lesson 3: The WBS Dictionary and the Scope Baseline: How Predictive, Adaptive and Hybrid Projects Manage Scope
- Question 7
A project manager writes in a status report that, with the budget at completion as the target, the to-complete performance index is 1.25. The project's budget at completion is $96,000, earned value is $60,000 and planned value is $66,000. What is the actual cost to date?
Show answer and explanation
Correct answer: D
TCPI (targeting BAC), BAC and EV are given, and the task is to work backward to actual cost AC. The planned value of $66,000 is an irrelevant distractor.
With BAC as the target, TCPI = (BAC − EV) ÷ (BAC − AC). The numerator is the budgeted value of the remaining work and does not depend on AC; only the denominator contains AC. First use the known quantities to get the numerator, 36. Then work back from TCPI to the denominator (the remaining budget), 28.8, and finally subtract it from BAC to get AC = $67,200. PV is irrelevant and is not needed. The answer is D.
- Numerator: BAC − EV = 96 − 60 = $36,000
- Denominator: BAC − AC = 36 ÷ 1.25 = $28,800
- AC = 96 − 28.8 = $67,200
- Check: CPI = 60 ÷ 67.2 ≈ 0.89, and TCPI of 1.25 is above 1, meaning a large efficiency gain is needed, consistent with AC exceeding EV
Why the other options are wrong
- A. $36,000 is BAC − EV, the numerator of the formula, not actual cost.
- B. $48,000 = EV ÷ 1.25 = 60 ÷ 1.25. This treats TCPI as CPI and uses AC = EV ÷ index, which is the wrong formula.
- C. $51,000 comes from 96 − 36 × 1.25. While solving, “divide by 1.25” became “multiply by 1.25”.
Key takeaway To back out AC: first find the remaining budget = (BAC − EV) ÷ TCPI, then subtract it from BAC.
Variation If CPI = 0.8 and EV = $60,000 were given instead, AC = EV ÷ CPI = $75,000, which is the opposite line of reasoning.
Reference Estimate at Completion · Lesson 2: To-Complete Performance Index (TCPI) and Forecasting Completion Duration
- Question 8
The final deliverable of a logistics dispatch system project has passed acceptance and the customer representative has signed. The project manager is running a stakeholder satisfaction survey. The customer's ratings are high and management, appreciating the project manager's ability, then assigns the project manager to lead another new project. What should the project manager do now?
Show answer and explanation
Correct answer: C
The final deliverable has been accepted and signed, the satisfaction survey results are very good, and management assigns the project manager to a new project. The question asks what the project manager should do now.
Overall acceptance and the satisfaction survey are only the first half of normal closure. Still to come are financial closure, summarizing lessons, updating organizational process assets, archiving files, releasing resources and, where applicable, closing contracts. The applicable items should be completed while the needed team members are still available. When assigned a new project during closure, first finish this project's closure with the team, then move to the new project. The answer is C.
Why the other options are wrong
- A. Closure is a process that must be completed. It is not waived because the customer is satisfied or a new assignment arrives, and the handoff, lessons learned and archiving cannot be “simplified” away.
- B. Turning to new work before closure is done makes it easy to delay or even miss lessons learned, handoff and archiving. Closure of the current project should be ensured first.
- D. Archiving is only one item of closure. Handoff, summarizing lessons learned, asset updates and releasing resources cannot be skipped either.
Key takeaway A signed acceptance does not mean closure is done. If you are assigned to a new project during closure, finish the current project's closure first.
Variation If the stem said “the sponsor asks to end the project immediately”, the project manager would still complete the closure responsibilities or formally hand them over; archiving all project files is only one required activity. Resources can be released as planned once the required closure work and knowledge handover are complete or properly transferred.
- Question 9
The agile team on a smart-speaker project is in the middle of a Sprint. The Product Owner finds that a stakeholder who had little influence has become a key figure, and the feature he proposes is more important than the one being built in the current Sprint, but adding it now would endanger the established Sprint Goal. How should the team handle it?
Show answer and explanation
Correct answer: C
During a Sprint, a stakeholder becomes a key figure, and the feature he proposes is more important than the one being built. The team uses Scrum. The question asks how to handle it.
No change that endangers the Sprint Goal is made during a Sprint, so the team can focus on the goal and deliver an Increment. The Product Owner immediately records the new feature in the Product Backlog and reorders it, and at the next Sprint Planning the team can select the highest-value work at that time. So the team should complete this Sprint as normal and update the ordering accordingly. The answer is C.
Why the other options are wrong
- A. Adding a new feature midway would hit the Sprint Goal, which would then be at risk of being missed, and the team could not tell whether it can still finish.
- B. In Scrum, canceling a Sprint is considered only when the Sprint Goal becomes obsolete. Here only a higher-priority feature has appeared, and the original Sprint Goal still stands.
- D. Pulling two people off to work on a feature outside the Sprint likewise starts a separate effort inside the Sprint, weakening the ability to meet the Sprint Goal and bypassing the ordering.
Key takeaway A change in priority does not interrupt a Sprint in progress: put it in the Product Backlog and select it at the next Sprint Planning.
Variation If the change makes this Sprint's results completely worthless, the Product Owner assesses whether to cancel the Sprint; merely “more important” is not a reason to cancel.
- Question 10
A mobile game project is close to release, ahead of schedule and under control on cost, and the sponsor and the project management office are both pleased with the project manager's performance. A tester then suggests adding an “achievement badge” animation, believing players will like the game more. What should the project manager do FIRST?
Show answer and explanation
Correct answer: D
A mobile game project is close to release, ahead of schedule and on budget. A tester on the team proposes adding an “achievement badge” animation. The question asks what the project manager should do FIRST.
The suggestion comes from inside the team and is not yet a formal change request. First, compare it with the scope baseline to find out whether the feature was already in scope: if it is, it is not a change; if it is not, assess the impact on scope, schedule and cost and, if needed, submit a change request. The order is to check scope first and then decide whether to go into change control. The answer is D.
Why the other options are wrong
- A. Accepting and assigning developers without checking bypasses change control. It produces gold plating and uncontrolled scope growth, and the team would own the quality of the extra feature.
- B. The idea came from a team member, so it should be analyzed before deciding whether to submit a change request. Submitting before knowing whether it is already in scope gets the order wrong.
- C. Rejecting because release is near, without checking scope or assessing impact, is not how Monitor and Control Scope works either. A valuable suggestion should go through the process.
Key takeaway The FIRST step is to check scope, and only then decide whether the suggestion enters change control.
Variation If a customer representative submits the new feature in writing, first assess its impact on every aspect of the project, then submit it, as the change management plan requires, to the person or body with authority to approve. If the feature is already in the scope baseline, simply build it; it is not a change.
- Question 11
A small agile team is told by the sponsor to cut its budget by 30%, and most of the budget is staff cost. To keep delivering value under this constraint, what strategy should the project manager adopt?
Show answer and explanation
Correct answer: B
A small agile team is told to cut its budget by 30%, and the budget is spent mainly on team members. You must judge how to keep delivering value.
In agile the timebox is fixed, and when funding falls, the number of user stories that can be completed normally falls too, so you must make trade-offs among scope, priority and staffing. The backlog should be ranked by priority, weighing value, effort, risk and dependencies, delivering the highest-value work first within the limited budget and adjusting budget and staffing accordingly, so the limited money buys the greatest value. The same money brings back more value and staffing follows priority, rather than cutting people first and then figuring out what to do. The answer is B.
Why the other options are wrong
- A. Cutting staff and compressing scope and schedule proportionally makes no trade-off by value and is not the preferred approach when a budget is cut.
- C. Mentioning only restructuring and training gives no concrete measure for the budget cut, and training itself costs money.
- D. Leaving scope and staffing unchanged and applying for the gap after the budget runs out makes no trade-off by value and effort and does not adjust staffing to priorities.
Key takeaway When the budget is cut, rank the backlog by value and deliver the highest-value work first.
Variation If the contract requires all features to be delivered even when the budget is cut, negotiate a scope or contract adjustment with the customer. If the cut happens between iterations, re-plan each iteration under the new budget.
- Question 12
An auto parts plant is making trial runs of a new type of gear. For each batch, the team has recorded the workshop temperature, humidity, and gear defect rate. The project manager wants to find out whether temperature and humidity are each correlated with the defect rate. Which tool should the team members choose?
Show answer and explanation
Correct answer: C
An auto parts plant is making trial runs of a new gear, and the project manager wants to know whether workshop temperature and humidity are related to the gears' quality defects. The question asks which tool to choose.
The core of the stem is whether variables are related: whether temperature and humidity are each correlated with the number (or rate) of defects. A scatter diagram plots two variables on one chart at a time, so you can draw two charts, “temperature versus defects” and “humidity versus defects”, and read the correlation from the trend of the points. That is the tool for answering this kind of question. Note that correlation is not causation: a scatter diagram shows only whether there is an association, not why. If the points on the scatter diagram show a clear upward or downward trend, the two variables are correlated; if they are scattered at random, they are basically unrelated. The answer is C.
Why the other options are wrong
- A. A control chart judges whether a process is stable or out of control. It is not used to analyze the relationship between a factor and defects.
- B. A matrix diagram shows the correspondence between groups of elements. It is not used to judge quantitatively whether an environmental factor is correlated with defects.
- D. A histogram shows the distribution of one set of data and involves only one variable.
Key takeaway To see whether an environmental factor is related to defects, you are looking at the relationship between two variables, so use a scatter diagram.
Variation If the stem asked “how many defects fall into each size interval”, that is the distribution of one variable, so use a histogram; if it asked “which category of defect is the most numerous”, use a Pareto chart.
- Question 13
PMLyceum is launching a development project for a new type of energy-storage battery, large in scale and long in duration. At present no clear performance requirements for the battery can be stated, and the technical risk is high. When planning the sourcing strategy, which type of contract should the project manager consider first?
Show answer and explanation
Correct answer: B
PMLyceum is launching development of a new energy-storage battery, large and long-running. Clear performance requirements cannot be stated and technical risk is high. The question asks which contract type to consider first when planning the sourcing strategy.
PMBOK 8 says the sourcing strategy plan may include determining the type of contracts to be used for external sources, taking into account factors such as project complexity and risk exposure. Appendix X4 says cost-reimbursable contracts are used when the project scope is uncertain or the project is high risk, and are common in research and development projects, while fixed-price contracts require a clearly defined scope of work. Here the measures cannot be stated and the risk is high, so a seller cannot give a reliable fixed price. A cost-reimbursable contract, where the buyer reimburses actual cost and pays a fee on top, fits best. The answer is B.
Why the other options are wrong
- A. A firm fixed-price contract requires the scope to be written down clearly first. When requirements are unclear, the seller will either refuse to sign or build a very high risk premium into the price, which is not good value for the buyer.
- C. Fixed price incentive fee (FPIF) is a common variant in the fixed-price family (a common exam term). The scope has to be defined clearly before a target cost, target profit and ceiling price can be set, and that cannot be done here.
- D. A time-and-materials contract is often used for small projects, maintenance work or scenarios where scope is unclear at the outset. For a long, large development effort its total has no ceiling, and the buyer would find cost hard to control.
Key takeaway For research-type procurements with unclear scope and high risk, lean toward a cost-reimbursable contract; lean toward fixed-price only when scope is clear and can be estimated accurately.
Variation If the measures were clear, the technology mature and the buyer wanted budget certainty, choose a firm fixed-price contract instead, with the seller’s risk premium included in the price.
Reference Contract Types · Lesson 1: Contract Types Overview and How to Choose
- Question 14
A newly hired test engineer is assigned to the project. His skills are fully adequate for the work, but he waits for the project manager’s authorization before acting on everything. What should the project manager do?
Show answer and explanation
Correct answer: B
A newly hired test engineer has fully adequate skills but waits for the project manager’s authorization before acting on everything. This is a delegation issue in leading the team: his ability is not the problem; he is unsure what he may decide.
Rule out ability first: the stem says his skills are fully adequate. He waits because he is unsure of his decision-making authority. The project manager should clarify his level of decision authority and authorize him to decide within it, which reduces waiting, improves efficiency and builds his autonomy. This fits the PMBOK 8 statement that team members who feel empowered to make decisions about the way they work and about specific details perform better than those who are micromanaged. The answer is B.
Why the other options are wrong
- A. The problem is not skills. Training cannot solve the reluctance to decide and would only delay the work.
- C. Making all his decisions would deepen dependence and turn the project manager into the bottleneck, against the principle of empowerment.
- D. He is capable, so replacing him avoids the problem, wastes a resource and does not fix the root cause, which is unclear delegation.
Key takeaway When a capable member waits for authorization, clarify decision authority and delegate; do not train, take over or replace.
Variation If the stem said the new member’s skills were still lacking, first guide and coach, then delegate step by step; if the member always asks you for answers, ask more and answer less so that he works out his own approach.
- Question 15
While introducing risk analysis to a new team member, the project manager explains the role of quantitative risk analysis. What is it mainly used to assess?
Show answer and explanation
Correct answer: A
The project manager is introducing risk analysis to a new member and explains the role of quantitative risk analysis. You need to understand how it differs from qualitative analysis.
The object of quantitative analysis is the whole. It numerically analyzes the combined effect of identified individual project risks and other sources of uncertainty on overall project objectives, and its output is a number for objectives such as cost and schedule, for example “there is an 80% chance the work is finished before a given date”. This is the most basic difference from qualitative analysis: qualitative analysis gives the relative level of each risk, while quantitative analysis gives numbers on the overall objectives. The answer is A.
Why the other options are wrong
- B. Assessing the relative priority of risks is mainly the role of qualitative risk analysis, and the probability and impact matrix is one commonly used tool. The main purpose of quantitative analysis is to quantify the combined effect of risks and uncertainty on overall project objectives.
- C. Statistics on the distribution across risk categories belong to risk categorization and the risk report. They reflect the makeup of the risks, not their numeric effect on objectives.
- D. Deciding who follows up is work done when identifying risks and planning responses. It is the assignment of responsibility, not something quantitative analysis assesses.
Key takeaway Quantitative analysis assesses the numeric combined effect of risks and uncertainty on overall objectives; qualitative analysis ranks individual risks by relative priority.
Variation If the question asked “what is the output of qualitative analysis?”, the answer is a priority ranking of the risks. If it asked “must every project do quantitative analysis?”, the answer is no; it is done when needed.
Reference Quantitative Risk Analysis · Lesson 1: Quantitative Risk Analysis and Monte Carlo Simulation
- Question 16
During execution of a smart home project, the project manager finds that the team has a knowledge gap in a key capability needed for device network security certification, which may affect delivery of the expected results. What should the project manager do?
Show answer and explanation
Correct answer: D
During execution of a smart home project, the team has a knowledge gap in a key capability needed for device network security certification, and delivery may be affected. The question asks what the project manager should do, and the key clue is the phrase “knowledge gap.”
PMBOK 8 states that when competency mismatches are identified, proactive responses such as training, hiring, schedule changes or scope changes are initiated, and it describes addressing gaps in knowledge and skills through training, mentoring or coaching. PMBOK 8 lists training, hiring, schedule changes and scope changes side by side. Discussing the gap first, then arranging training and coaching, and only last considering replacement or a scope change is common exam practice. Training and coaching close the capability gap without touching scope or schedule. The correct answer is D.
Why the other options are wrong
- A. Asking senior management to cut scope before trying to close the capability gap turns a team capability problem into a scope change. A scope reduction also has to go through change control and may affect the expected outcomes.
- B. Replacing people may add cost, require a handover and disrupt the team. The stem does not indicate that training would be too late, so first raise the existing members' capability (training before replacement is common exam practice).
- C. Telling the customer that delivery may slip and asking for a relaxed deadline, with no remedial action yet taken, is premature and passive, and does not close the capability gap.
Key takeaway When you find a knowledge gap, the first choice is to discuss it and then arrange training and coaching. Scope, schedule and staffing changes come later (the ordering is common exam practice).
Variation If the gap cannot be closed in time even after training, only then consider bringing in new members with certification experience or an outside consultant, and update the resource and schedule arrangements accordingly.
Reference Team Performance · Lesson 2: Training, Coaching and Mentoring: Find the Gap First, Then Choose the Remedy
- Question 17Select 3
A software company's system development project hits a technical difficulty just after entering the planning phase, and the project manager asks a senior expert to share experience with the team. Which of the following are tacit knowledge? (Select 3.)
Show answer and explanation
Correct answer: ACE
The project is in the planning phase and a senior expert is asked to share experience with the team. You must pick all three tacit items out of five; the core is telling tacit from explicit.
Tacit knowledge is embedded in a person's mind and is highly personal, and it is hard to express in language or documents; it includes technical skills, experiences, insights and practical knowledge. Intuitive judgment about risk, practical experience built up over several projects and insight into the essence of a problem are all things that are hard to say, hard to write down in full and are often best shared through person-to-person interaction, so all three qualify. A useful check is to ask whether the knowledge depends heavily on personal experience, intuition and context and is hard to formalize completely or transfer directly; if so, it is usually tacit. So choose A, C and E.
Why the other options are wrong
- B. A cause-and-effect diagram expresses causes and effects in a figure. It is already in finished form and can be shared and stored directly, so it is explicit knowledge.
- D. A project analysis report is already written in words and data and can be passed to anyone as a document, so it is explicit knowledge.
Key takeaway Intuition, insight and practical experience are tacit knowledge; diagrams and reports, which can be put in writing, are explicit knowledge.
Variation If the options were changed to “an operating manual” and “an expert judging equipment condition from years of experience,” the first is explicit and the second is tacit. If the question asked how to share tacit knowledge, the answer would be mentoring, pairing and face-to-face interaction, not having the other person read documents.
- Question 18
A project manager takes over a member management system project that is already in the execution phase and finds that the customer has never provided accurate product requirements. According to which of the following plans should the project manager analyze, document and manage the requirements?
Show answer and explanation
Correct answer: A
The project is already in execution and the customer has never provided accurate product requirements. The question asks which plan sets out the rules for how requirements are analyzed, documented and managed.
The requirements management plan describes how project and product requirements will be analyzed, documented and managed. Its content includes how requirements activities will be planned, tracked and reported, configuration management activities, the requirements prioritization process, metrics, and the traceability structure that reflects the requirement attributes. Note that the stem says “according to the plan”: you are looking for the plan where the rules are, not the document where the requirements themselves are (that is the requirements documentation). What has to be decided here is exactly “how to analyze, document and manage requirements,” so the answer is A.
Why the other options are wrong
- B. The configuration management plan governs how versions and configurations of products and documents are managed. It does not set out how requirements are analyzed and documented.
- C. The scope management plan explains how scope will be defined, developed, monitored, controlled and validated. Scope and requirements are two different things: the plan contains no requirements and does not set out how requirements are recorded.
- D. The change management plan governs how changes are handled. It is not the basis for analyzing and documenting requirements.
Key takeaway For how to analyze, document and manage requirements, look at the requirements management plan; do not confuse it with the scope management plan.
Variation If the stem were changed to “which document should be used to determine how to prepare the scope statement, create the WBS and accept deliverables,” the answer would be the scope management plan.
- Question 19
A customer data migration project at PMLyceum has entered execution. The project manager finds that the workload in the schedule far exceeds the skills and capabilities the team currently has. What should the project manager do?
Show answer and explanation
Correct answer: D
A customer data migration project is in execution, and the project manager finds that the workload in the schedule far exceeds the team's current skills and capabilities. The question asks what the project manager should do.
Insufficient team skills and capability is a team member matter, handled in the Lead the Team process (Monitor and Control Resourcing covers only physical and virtual resources). When the plan does not match the team's capability, first find out how big the gap is and in which kind of skill, then choose among training, plan adjustment, added resources and similar measures. If the result affects a baseline, it goes through the change control procedure. Assess first, then act, so you are not acting blindly. The answer is D.
Why the other options are wrong
- A. Ignoring the capability gap and pushing through with overtime easily leads to quality problems, rework and staff turnover, and does not solve the root problem.
- B. Quietly deleting work without recording it bypasses change control: a scope reduction goes unapproved and stakeholders are unaware.
- C. Extending everything by one proportion adjusts by feel without analyzing which activities and skills hold the gap, so it may solve nothing and lengthen the schedule for no reason.
Key takeaway When the plan does not match capability: assess the gap first, then adjust the plan or add resources, using change control when needed.
Variation If the assessment shows only a few activities lack a particular skill, training or bringing in an expert temporarily can solve it, and there is no need to adjust the whole schedule.
Reference Monitor and Control Resourcing · Lesson 2: Assess Before You Act: Resource Variances and Change Control
- Question 20
A one-year upgrade project for a cross-border e-commerce platform uses resources such as test environments, software licenses and servers. Which of the following is the MOST appropriate way for the project manager to monitor resources?
Show answer and explanation
Correct answer: A
A one-year platform upgrade uses physical and virtual resources such as test environments, software licenses and servers. The question asks how resources should be monitored, and the core is “when and for how long”.
PMBOK 8 is explicit: the Monitor and Control Resourcing process should be performed continuously in all project phases and throughout the project life cycle. Its aim is to assign and release resources at the right time, in the right place and in the right amount, to monitor planned versus actual use and to perform corrective actions as necessary. Virtual resources such as test environments and licenses are within scope as well. Of the four options only A shows all three points: throughout the life cycle, continuous comparison and timely correction. The answer is A.
Why the other options are wrong
- B. This assumes everything is fine once resources are in place. Availability, quantity and need change as the project moves, so a single check cannot find shortages or idle resources that appear later.
- C. This treats monitoring as periodic reporting. By the end of a phase the information is stale and shortages or waste have already done their damage, which goes against the requirement of being continuous.
- D. This is after-the-fact repair. The value of monitoring is to identify shortages or surpluses early and deal with them; checking only after a delay appears misses the best time to correct.
Key takeaway Monitor and Control Resourcing is a continuous process: it runs throughout the life cycle, always compares planned with actual use and corrects deviations.
Variation If the stem asked what to do when resources are no longer needed, the answer is to release them promptly to avoid tying them up and wasting them; the monitoring itself is still continuous.
Reference Monitor and Control Resourcing · Lesson 1: Monitor and Control Resourcing: Purpose, Inputs, Outputs and Data Analysis Tools
- Question 21
You are a developer on an agile project. After the team has worked for 2 weeks, the Scrum Master calls a Sprint Retrospective. Which of the following topics is MOST suitable for discussion at this meeting?
Show answer and explanation
Correct answer: D
After the team has worked for 2 weeks on an agile project, the Scrum Master calls a Sprint Retrospective. The question asks which topic is the most suitable for discussion.
The Sprint Retrospective is held at the end of the Sprint to reflect on the Sprint, sum up lessons learned and explore opportunities for improving future work. You look both at which practices worked and should continue and at what needs improving, so “summarizing the practices that went well, for reference in later Sprints” suits best. By contrast, the three wrong options are about overtime, suppressing the customer and finishing features, and none of them is about lessons learned and improvement. The answer is D.
Why the other options are wrong
- A. Using collective pride to get people to volunteer for overtime does not improve how the team works, and it goes against a sustainable pace.
- B. Agile welcomes change. Changing requirements are managed through the Product Backlog, not “suppressed”, and this is not a topic for the Sprint Retrospective.
- C. Finishing unfinished features is development work in the Sprint, and unfinished items should return to the Product Backlog to be re-evaluated, not be completed in the Sprint Retrospective.
Key takeaway The Sprint Retrospective is for summing up lessons learned and improving process and product. It is not for fixing unfinished features directly in the meeting, and it is not for suppressing customer change.
Variation If the Sprint Retrospective finds the team “never finishes everything”, discuss the estimating method or the Sprint capacity, rather than handling the unfinished features in the meeting.
Reference Scrum Events · Lesson 5: The Sprint Retrospective
- Question 22
A coffee chain decides to launch a membership subscription platform project. A key stakeholder points out that to make a profit in this market it must adopt an entirely new subscription model, and whether users will accept it is highly uncertain. This leaves the project as a whole facing a high level of negative risk, the organization cannot address it effectively itself, and it could hinder achievement of the project objectives. Which overall project risk response strategy should the project manager use?
Show answer and explanation
Correct answer: B
A coffee chain is running a membership subscription platform project. A key stakeholder points out that an entirely new model must be adopted whose user acceptance is highly uncertain, the overall negative risk is high, and the organization cannot address it effectively itself. You must decide which overall project risk response strategy to use.
What is being judged here is overall project risk, not an individual risk. PMBOK 8's strategies for overall project risk are likewise five: avoid, exploit, transfer/share, mitigate/enhance and accept. If the level of overall project risk is high but the organization is unable to address it effectively, a third party may be involved to manage the risk on behalf of the organization. Where overall project risk is negative, a transfer strategy is required, which may involve payment of a risk premium; share applies only when it is positive. This situation is a negative overall risk the organization cannot address effectively, so the answer is B.
Why the other options are wrong
- A. PMBOK 8 gives adding high-benefit elements of scope as an example of exploit for overall risk, used when overall risk is clearly positive. The stem describes negative risk, so the direction is wrong.
- C. A risk workshop with experts only discusses responses; it does not itself change the level of overall risk and is not a response strategy, so it does not directly raise the chance of meeting the objectives.
- D. Qualitative risk analysis is analysis work that comes before response planning and mainly concerns individual risks. Here the question is the response strategy for overall risk, not further analysis.
Key takeaway When overall risk is highly negative and the organization cannot address it effectively, transfer it to a third party. Use share only when overall risk is positive.
Variation If overall risk were clearly positive, the same condition would call for share, with a third party taking part of it and sharing the benefit. Negative calls for transfer and positive for share.
- Question 23
An online education platform development project is in the execution stage. A personnel change at the top of a partner organization has put decisions on hold, and the project needs to speed up. The sponsor asks the project manager to report the expected delay. Which tool should the project manager use to prepare this report?
Show answer and explanation
Correct answer: D
In the execution stage, a personnel change at the top of a partner organization has put decisions on hold, and the sponsor asks for a report on the expected delay. The question asks which tool to use.
Trend analysis uses the performance data so far to project what the schedule will do if the current trend continues, so it is used to forecast a future delay and fits the request for the “expected delay”. Words such as “expected”, “likely” and “if things continue like this” are signals of forecasting and point to trend analysis and forecasting techniques, while “why” and “cause” point to root cause analysis. The output of trend analysis is a schedule forecast, which can be used directly to report to the sponsor how much later completion is expected, and to give a basis for deciding later whether to compress; that is exactly the “expected delay” the stem asks for. The answer is D.
Why the other options are wrong
- A. Root cause analysis finds the causes of problems that have already happened. It cannot predict whether later delays will occur.
- B. A quality report reflects quality problems and improvement recommendations. It has nothing to do with forecasting schedule delays.
- C. A milestone list gives milestones and their dates. It is planning information, and later delays cannot be worked out from it.
Key takeaway To predict whether later progress will slip: trend analysis; to find the cause of a problem that already happened: root cause analysis.
Variation If you needed to analyze “why the design phase used up so much time”, use root cause analysis, not trend analysis.
- Question 24
A project is planned for 9 Sprints and is currently in the 5th. At the Daily Scrum, a member says a key feature will take much longer than expected. What should the project manager do?
Show answer and explanation
Correct answer: A
A project has 9 planned Sprints and is in the 5th. At the Daily Scrum a member says a key feature will take much longer than expected. The question asks what the project manager should do. The key is that the problem has just surfaced and is still within what the team can control.
An agile team is self-organizing. When a problem comes up, work with the team, analyze the cause first and then find feasible ways together. The Daily Scrum has surfaced the problem, so the next step is to review the options and possible solutions with the team. In reviewing the options, you could consider splitting the feature, adjusting scope or asking members to help, and then see whether outside support is needed. The answer is A.
Why the other options are wrong
- B. Logging it in the issue log is fine, but escalating directly to the sponsor is not appropriate: the problem is still within what the team can handle and has not reached the point of escalation.
- C. A feature running over time is not necessarily a lack of ability. Putting on training without analyzing the cause is not well targeted.
- D. When a problem appears, first try to solve it rather than ask for a longer schedule right away.
Key takeaway When overrun is surfaced at the Daily Scrum, review the options with the team first and then decide whether to escalate or ask for resources. Solve it inside the team first, and seek outside help only if necessary.
Variation If after the review it is confirmed that the scope cannot be completed in the remaining Sprints, the Product Owner would negotiate with the stakeholders and trade off scope.
Reference Scrum Roles · Lesson 4: Problem-Solving in an Agile Environment: Let the Team Try First
- Question 25
At a furniture factory, a recent batch of desks shipped with drawer-slide mounting holes outside tolerance, creating a risk of loosening. The project manager and team trace the cause to a worn drill bit and submit change requests to replace the bit, recall the shipped desks for rework, and add a rule for regular inspection and replacement of drill bits. After assessment and approval, the team implements all three measures, and the hole positions return to within tolerance. What kinds of action are the project manager's three measures?
Show answer and explanation
Correct answer: C
At a furniture factory, desks' drawer-slide hole positions exceed tolerance. The project manager submitted change requests to replace the worn drill bit, recall the shipped desks for rework, and add a rule for regular bit inspection and replacement; all three were implemented after approval. Match each of the three to a type of change request.
Look at the object and the timing of each measure. Replacing the drill bit makes production conform again and addresses a variance that has already occurred, so it is corrective action. Recalling the shipped nonconforming desks to reprocess them has a nonconforming product as its object, so it is defect repair. Adding the inspection and replacement rule is meant to make sure the variance does not appear again in future, so it is preventive action. Corrective action, defect repair and preventive action match the three measures in order. The answer is C.
Why the other options are wrong
- A. The first is right but the last two are reversed: recalling for rework fixes a nonconforming product, which is defect repair, and the new rule is aimed at the future, which is preventive action.
- B. Replacing the bit makes the process conforming again and addresses a variance that has already occurred, so it is corrective action, not defect repair. Reworking the shipped desks is what is defect repair.
- D. Replacing the bit is not preventive action, because prevention addresses a variance that has not yet occurred. The new rule is not corrective action either, since it does not repair an existing variance.
Key takeaway A variance that has occurred calls for corrective action, a nonconforming product for defect repair, and a possible future variance for preventive action.
Variation If one more measure were added, “relax the acceptance tolerance from 1 mm to 2 mm and revise the contract annex,” it changes documents and a baseline and is an update. In a predictive project with established baselines, actions that touch baselines or other controlled items go through formal change control before implementation.
- Question 26
Engineer Daniel hands the project manager a written change request. The data interface he is responsible for cannot be built with the current technical approach; he wants to switch to a different approach, which would take more work hours and affect the approved baseline. As the project manager, what is the FIRST thing you do after receiving the request?
Show answer and explanation
Correct answer: C
On a predictive project, Engineer Daniel submits a written change request: the data interface cannot be built with the current technical approach, and he wants a different approach that would take more work hours and affect the approved baseline. What does the project manager do first?
PMBOK 8 requires that a change be documented in writing, that its impact on schedule and cost be assessed, and that designated persons approve, defer or reject it; the five-step order of record, assess, submit, update and notify is common exam practice. The request in the stem is already in writing, and in practice the project manager would also make sure it is entered in the change or configuration management system; none of the options is a logging action, so the best answer now is to assess: find out what the new approach would do to the duration, cost and other objectives, and then submit it for approval. “First” refers to the first action after the request has been recorded. Assessment also does not stop the project manager from having the team continue other planned tasks (PMBOK 8: keep executing planned tasks while waiting for a decision), and the results of the assessment are communicated to the relevant stakeholders before being submitted for approval. The answer is C.
Why the other options are wrong
- A. A change may not be implemented before it is approved, and the new approach would affect the baseline.
- B. Submission for approval comes after assessment. Without knowing the impact, the board has no basis for its review.
- D. Briefing the sponsor alone does not replace the impact assessment and formal approval, and it is not the first step now.
Key takeaway Once a request has been recorded, assess the impact first and then submit it for approval.
Variation If Daniel had raised it verbally, the first step would be to record it in writing; if the assessment has been completed, the next step is to submit it to the approver designated in the change management plan (which may be the change control board, the sponsor or the project manager).
- Question 27
PMLyceum makes bolts for a piece of equipment, and the customer specifies that the length must be between 45 and 55 mm. The quality engineer takes 20 consecutive samples and draws the control chart (see figure): mean 50 mm, upper control limit 58 mm, lower control limit 42 mm. All data points are within the control limits, and there are no 7 consecutive points on the same side of the mean, but point 7 (56 mm) and point 11 (44 mm) are beyond the specification limits. How should the project manager interpret this?
Show answer and explanation
Correct answer: B
The bolt length specification is 45-55 mm, the control limits are 42-58 mm, and all points are within the control limits, but point 7 at 56 mm and point 11 at 44 mm are beyond the specification limits. The question asks how to interpret this.
The stem rules out the two common signals for a point beyond the control limits and 7 consecutive points on the same side of the mean (seven consecutive points on one side of the mean is treated as an out-of-control signal in common exam practice), and the chart shows no trend or other non-random pattern, so the process is stable and in control. But the control limits (42-58) are wider than the specification limits (45-55), which means the natural variation of the process is itself larger than the customer allows, so even an in-control process will still produce nonconforming units such as the 56 mm and 44 mm ones. Improve the process itself to reduce the variation, or negotiate the specification with the customer. The answer is B.
- Step 1, check for points outside: all points are within the control limits of 42-58 mm, so none is outside.
- Step 2, check for seven in a row: no 7 consecutive points on the same side of the mean of 50 mm.
- Step 3, conclude in control: neither out-of-control signal is present, so the process is in control.
- Step 4, check the specification limits of 45-55 mm: point 7 at 56 > 55 and point 11 at 44 < 45, so those two units are nonconforming.
- Step 5, compare widths: the control limits are 16 mm wide and the specification limits are 10 mm wide, so the control limits are wider and the natural variation exceeds what the customer allows.
- Conclusion: stable but with insufficient capability, so choose B.
Why the other options are wrong
- A. The bases for out of control are a point beyond the control limits, 7 consecutive points on one side and other non-random signals, not going beyond the specification limits. Both points beyond specification are within the control limits, so the process is not out of control and production need not be stopped.
- C. Looking only at the control limits would mislead you into thinking everything is normal. Points 7 and 11 are already beyond the specification limits, so the products do not conform.
- D. Control limits are calculated statistically and reflect the natural capability of the process. They cannot be narrowed artificially to suit the specification; the specification limits come from customer requirements.
Key takeaway In control means only that the process is stable; conformance depends on the specification limits. When the control limits are wider than the specification limits, even an in-control process produces defective units, and the process must be improved.
Variation If the control limits were 46-54 mm, inside the specification limits, the same two points at 56 and 44 would fall beyond the control limits and become out of control, and you would investigate special causes.
- Question 28
In one iteration, the team spends time refactoring a module that is working correctly. What is the value of doing this?
Show answer and explanation
Correct answer: C
In one iteration, the team spends time refactoring a module that is working correctly. The question asks for the value of doing so.
Refactoring adjusts the internal structure of the code without changing the system's external behavior, reducing complexity and removing duplication. The module is working correctly, so the purpose is not to fix defects or add features; the value is in improving the internal design and paying down technical debt, so that later changes are easier and less error-prone. The stem stresses “working correctly”, which rules out the motives of fixing defects and adding features and leaves only improving the internal design. The answer is C.
Why the other options are wrong
- A. Adjusting task priority is the Product Owner's work on the backlog. It has nothing to do with the internal structure of the code.
- B. Verifying customer value relies on the iteration review meeting and customer feedback. Refactoring leaves external behavior unchanged, so the customer sees no difference.
- D. Scope changes are handled through scope or change management. Refactoring does not change functionality, so it does not involve scope.
Key takeaway Refactoring does not change functionality. It only improves the internal design and reduces technical debt.
Variation If the stem said “after the change, the user interface has an extra button”, that is a new feature, not refactoring. If asked how to confirm the refactoring broke nothing, the answer is to rerun the tests.
- Question 29
A cross-border software project has just started, with team members in two countries. Because of the time difference, the two sites’ working hours overlap by only one hour. What should the project manager do to promote communication between the two sites?
Show answer and explanation
Correct answer: A
A cross-border software project has just started, and members are in two countries whose working hours overlap by only one hour. The question asks how to promote communication between the sites, with the key condition being that there is only one hour of overlap.
PMBOK 8 notes that differences in time zones pose heightened challenges for virtual teams and make communication planning more important. Scheduling online meetings in the one overlapping hour means both sides are at work and online and can talk in real time, which is the most direct and practical way to handle a time difference. Meetings should have a clear agenda and minutes so that the single precious hour goes to items that need real-time discussion. The answer is A.
Why the other options are wrong
- B. Publicly praising members who respond after hours makes up for the time difference with members’ rest time. This is not sustainable and leads to fatigue and poor work-life balance.
- C. Drafting a team charter and agreeing on decision-making is basic work for leading the team, but it does not directly solve the problem of real-time communication across time zones.
- D. Requiring the same hours ignores the real time difference. Forcing it is unrealistic and only lowers efficiency and creates resentment.
Key takeaway For communication across time zones, the first choice is online meetings during the hours when both sites’ working times overlap.
Variation If the overlap is already fully booked, move other information into asynchronous channels such as shared documents and screen recordings, and use meetings only for items that need real-time discussion.
Reference Virtual Teams · Lesson 2: Virtual Team Communication, Time Zones, Trust and Cross-Cultural Management
- Question 30
A software company's new project manager is leading a team for the first time. At the peak of system integration, developers and testers are deadlocked over defect priorities, and stakeholders are questioning the schedule. She admits she is afraid of conflict and asks an experienced colleague how to think about it. What is the colleague's MOST appropriate answer?
Show answer and explanation
Correct answer: C
A new project manager leading a team for the first time faces developers and testers deadlocked over defect priorities during integration, while stakeholders question the schedule. She admits she is afraid of conflict and asks a colleague how to view it. The question asks for the colleague's most appropriate answer.
Conflict has many sources: scarce resources, scheduling priorities, and differences in work style and personality. Whenever many people work together, conflict is unavoidable, and when it is managed well it can raise productivity and improve decision-making. So the appropriate answer is that conflict is unavoidable on projects and the point is to manage it well, neither eliminating it nor letting it run. The answer is C.
Why the other options are wrong
- A. Too many factors cause conflict. Planning preventive measures can reduce it but not eliminate it, so “can be prevented” is too absolute.
- B. Conflict does not necessarily end in disaster, and when handled well it can even surface problems. Preparing a “recovery plan” for it treats conflict as purely bad.
- D. Moderate disagreement can indeed be useful, but destructive conflict such as personal attacks needs prompt intervention, so “need not get involved” is equally too absolute.
Key takeaway Conflict is unavoidable and beneficial when well managed; do not try to eliminate it and do not ignore it.
Variation If an option read “after conflict escalates, the project manager should provide help,” that statement would be correct: members resolve it first, and the project manager helps once it escalates.
- Question 31
Testing on a power-tool development project has slowed because of problems with battery packs the supplier delivered. The project manager concludes that the battery packs are nonconforming, while the supplier insists that all the goods meet the contract. If this is not resolved within a week, the product launch will be affected. How should the project manager handle it?
Show answer and explanation
Correct answer: C
During testing, buyer and seller each insist on their own view of whether the battery packs meet the contract, and the schedule is threatened. The question asks what the project manager does.
Signals: each side insists it is right, and failing to resolve it within a week will affect the launch. In a dispute, look at the contract first to understand each side's rights and obligations, then negotiate a solution with the supplier. Negotiation is the preferred method of resolving a dispute, and the order of handling can be remembered as: check the contract, negotiate, then escalate step by step as needed. The other options skip these two steps: reporting without reading the contract cannot show a breach, and amending the contract or terminating directly has no basis. The answer is C.
Why the other options are wrong
- A. Reporting before reviewing the contract cannot show the supplier failed to perform, and you should negotiate first before considering escalation.
- B. The contract is already signed, so an amendment must go through the change control procedure, and the contract does not reflect what needs to be changed. This should not be the first step.
- D. Terminating and fining directly has no basis, may put you in breach, and would further affect the schedule.
Key takeaway In a procurement dispute, check the contract first and then negotiate with the supplier.
Variation If negotiation fails, use mediation, arbitration, or another dispute-resolution method as the contract provides; litigation is the last resort after other means are exhausted. Keep written records throughout.
- Question 32
Members of an agile team run into several problems that must be handled together with stakeholders. To get the best communication and resolution, what should the team do?
Show answer and explanation
Correct answer: A
An agile team has run into several problems that must be handled together with stakeholders. The question asks which way of communicating works best.
One of the principles behind the Agile Manifesto says: “The most efficient and effective method of conveying information to and within a development team is face-to-face conversation.” When people need to discuss and solve problems together, face to face lets you see expressions instantly, clarify quickly and decide on the spot, and it is the richest medium. Video conferences, phone calls and email are, in that order, alternatives with decreasing richness of information. The answer is A.
Why the other options are wrong
- B. A video conference is remote interactive communication. You can see the people, but it lacks the interaction detail of being in the same room, so it is the second-best choice when face to face is impossible.
- C. A phone call carries only voice, with no facial expressions or body language, so it works worse for complex problems that need several people to discuss.
- D. Email is one-way, delayed push communication. Going back and forth is slow, misunderstandings are easy, and it is unsuited to occasions where people need to discuss and solve problems together.
Key takeaway Agile prefers face-to-face communication; the richer the channel, the better it suits complex or sensitive issues.
Variation If the stakeholders were in another location and face to face were not feasible, choose the video conference as the next-best interactive method.
Reference Plan Communications Management · Lesson 3: Communication Technology and Communication Methods: Push, Pull and Interactive
- Question 33
The ground rules in the team charter state: “Discussion is about the issue, not the person.” At a regular meeting, Member A mocks Member B's ability in front of everyone. What should the project manager do?
Show answer and explanation
Correct answer: C
The ground rules in the team charter say “discussion is about the issue, not the person.” At a regular meeting, Member A mocks Member B's ability in front of everyone. The question asks what the project manager should do.
Mocking someone's ability is a personal attack. It breaks the ground rules the team agreed on and happens in public. The project manager should stop it on the spot, restate the rule and bring the discussion back to the issue itself, which protects B and upholds the authority of the rule. After the meeting, the project manager talks privately with A to understand the reason and, as appropriate, with B, to avoid lingering resentment. The answer is C.
Why the other options are wrong
- A. Letting them finish and asking for statements afterward effectively lets the attack continue. It hurts B and makes the rule meaningless.
- B. Recording it in the appraisal immediately and notifying the functional manager is too harsh. A violation should first be corrected within the team, and there has been no conversation.
- D. Pausing the meeting to ask the sponsor to rule on who is right hands off a conflict inside the team that the project manager can handle.
Key takeaway When a ground rule is broken in public, stop it on the spot, restate the rule and bring the discussion back to the matter at hand.
Variation If a member merely kept breaking an agreed process rather than attacking someone in public, talk with him privately and invite him to help improve the process.
- Question 34
A manufacturer can pursue only one of Project A and Project B. Project A has a net present value of $42,000 and Project B has a net present value of $58,000. Management ultimately decides to do Project A. What is the opportunity cost of this decision?
Show answer and explanation
Correct answer: B
Only one of two projects can be chosen, and management has chosen Project A. You must work out the value given up by choosing A, which is the opportunity cost.
Opportunity cost is the value the option given up could have brought. Choosing Project A means giving up Project B, whose net present value is $58,000, so the opportunity cost is $58,000. A's own net present value is the benefit of the option chosen, not the opportunity cost. The answer is B.
- Option chosen: Project A, NPV $42,000
- Option given up: Project B, NPV $58,000
- Opportunity cost = value of the option given up = $58,000
- Compare: 58 − 42 = $16,000 is only the difference between the two benefits, not the opportunity cost. The opportunity cost of $58,000 exceeds the $42,000 benefit of the project chosen, so the answer is B
Why the other options are wrong
- A. $42,000 is the net present value of Project A, the option chosen. It is the benefit of the option selected, not the one given up.
- C. $16,000 = 58 − 42 is the difference between the benefits of the two projects, which does not equal the value of the project given up.
- D. $100,000 = 42 + 58 adds the values of the chosen and the abandoned options together, which has no meaning.
Key takeaway Opportunity cost is the value of the option given up, not the value of the option chosen and not the difference between the two.
Variation If management chose Project B instead, the opportunity cost would become A's $42,000. If there were three projects and only one could be chosen, the opportunity cost is that of the highest-value project among those abandoned.
- Question 35
At a project status meeting, the project manager notices that a representative of a community service organization affected by the project has been left outside the project all along. Senior management never mentioned them before, and the project documents contain no information about this organization. What should the project manager do?
Show answer and explanation
Correct answer: A
At a project status meeting, the project manager notices that the representative of a community service organization affected by the project has been outside the project all along, senior management never mentioned them, and the project documents have no information about the organization. The question asks what to do.
This is a stakeholder who was missed in identification. The project manager should first carry out stakeholder analysis: work out the organization's position, role, stakes, expectations and attitude, and then record the results in the stakeholder register. PMBOK 8 says identifying stakeholders should be done periodically, recording their interests, influence and potential impact. This is something the project manager can do directly within their own remit. The answer is A.
Why the other options are wrong
- B. At this point the organization's role, expectations and influence are not understood. Directly assessing and registering a risk of insufficient involvement has little basis and skips the primary step of identification and analysis. After the stakeholder analysis is complete, if there really are related uncertainties, you can assess the risk and update the risk register.
- C. The project manager should first analyze and register proactively, and ask the sponsor to step in only for matters beyond their own authority. Passing it to the sponsor straight away treats something the project manager can do as an item to escalate.
- D. Consulting senior management first hands the judgment to someone else. Whether the organization is a stakeholder, the project manager can judge by the definition, and analyzing first and then communicating as needed has more basis.
Key takeaway When you find a stakeholder who was missed, analyze first and then record the results in the register; there is no need to wait for someone's approval.
Variation If the analysis shows the organization has a major impact on the project, then ask the sponsor to help drive its involvement.
Reference Identifying and Analyzing Stakeholders · Lesson 4: The Stakeholder Register: What to Record and What to Do When a New Person Appears
- Question 36
A project is bound by laws and regulations, industry standards and organizational policies at the same time, and these requirements differ in source, how mandatory they are and the consequences of violating them. What is the most appropriate way for the project manager to manage compliance?
Show answer and explanation
Correct answer: B
The project has identified several kinds of compliance requirements, differing in source and how mandatory they are. The question asks for the basic approach to managing compliance.
Compliance requirements come mainly from laws and regulations, industry standards, organizational policies and contracts. Different sources mean different binding force and different consequences of violation: violating laws and regulations draws penalties, and violating organizational policy brings internal accountability. So classify first by source and by how mandatory the requirement is, then set the owner, method of checking and response for each category, giving priority to the mandatory requirements that carry fines. The answer is B.
Why the other options are wrong
- A. Industry standards and organizational policies are compliance requirements too, and organizational policy is a direct constraint from organizational governance on the project. Managing only laws and regulations leaves gaps.
- C. One-size-fits-all processes and frequency can under-monitor high-risk requirements and waste effort on low-risk ones, which amounts to no classification at all.
- D. Taking the strictest category as the standard and assuming the rest are automatically satisfied does not hold: requirements from different sources differ in content, and satisfying one category does not satisfy another.
Key takeaway Compliance requirements come from many sources, so manage them by category: do not ignore, merge or manage only one category.
Variation If the stem asked where monitoring should focus, judge by how mandatory the requirement is, the consequences of noncompliance, the risk and the deadline. Requirements that bring penalties, such as laws and regulations, usually get attention first, but every applicable mandatory requirement must be met. If it asked how to manage them, answer that you classify and then set an owner and a checking method for each.
- Question 37
A candidate has registered for the updated PMP exam and wants to understand how the exam is made up. Which of the following statements about the total number of questions, scored questions and pretest questions is correct?
Show answer and explanation
Correct answer: B
The question asks how the exam is made up. There is no project scenario; you only need to remember the total number of questions and the number of scored and pretest questions.
The exam content outline states that the exam consists of 180 questions, of which 170 are scored and 10 are pretest questions. Pretest questions do not affect your score and are used only to check the validity of future exam questions. The time limit is 240 minutes, and all questions are presented in random order. The numbers in the options have to fit 180 = 170 + 10, and only B matches exactly. The answer is B.
Why the other options are wrong
- A. The exam includes 10 pretest questions; it is not the case that all 180 questions are scored.
- C. There are 10 pretest questions, not 20, so the number of scored questions is 170, not 160. The numbers are misremembered.
- D. The total is 180 questions, and 170 is the number of scored questions. This option treats the scored count as the total and also gets the number of pretest questions wrong.
Key takeaway 180 questions = 170 scored + 10 pretest, 240 minutes, questions presented in random order.
Variation If the question asked about the domain weightings instead, the answer would be People 33%, Process 41% and Business Environment 26%. If it asked about the share of predictive questions, the answer would be about 40%, with the other 60% or so adaptive and hybrid.
- Question 38
At a lessons learned meeting, a stakeholder says the project was not successful because it did not bring the expected business value. How should the project manager respond to this challenge?
Show answer and explanation
Correct answer: B
The project is in closing and the lessons learned stage. A stakeholder says at the meeting that the project was not successful because it did not bring the expected business value, and the question is how the project manager should respond.
The core of the challenge is “was the expected value realized?” The benefits management plan states the target benefits, the timeframe and the metrics. Going through it with the person raising the challenge shows whether the project achieved the expected benefits, whether the challenge holds, and where the gap lies. This is more convincing than each side talking past the other. When handling a challenge, first use the same yardstick, so the two sides do not each use their own standard. If a gap is indeed found, analyze the causes together and record them in lessons learned. The answer is B.
Why the other options are wrong
- A. Reviewing work tasks one by one looks at what was done. It is not a measure of whether value was realized.
- C. The budget reflects the input. Checking the budget alone cannot show whether value has appeared.
- D. The communications management plan specifies how information is passed on. It has no direct bearing on whether benefits were realized.
Key takeaway When someone says the project did not deliver the expected value, check it together against the benefits management plan.
Variation If the challenge were “why did we take on this project in the first place?”, go back to the business case (supported by the objectives and rationale in the project charter where needed) to explain the reasons for approval, not the benefits management plan; the business case answers “whether to do it” and the benefits management plan answers “how it is going.”
- Question 39
The e-commerce department of a retailer is running three interlocked projects at once: an inventory system, an order system and a logistics integration. Last month the inventory team complained that the order system team was delivering its interface too slowly, which delayed its own work, and a similar conflict arose between the order system team and the logistics integration team. Several project managers have met repeatedly to coordinate, without result. Which role is BEST suited to resolve this kind of problem?
Show answer and explanation
Correct answer: C
The e-commerce department runs inventory, order and logistics integration projects whose interface deliveries constrain one another, and several project managers have met repeatedly without result. You must decide which role is best suited to resolve the problem.
The schedules and interfaces of the three projects affect one another, so they are interrelated and need to be managed together in a coordinated way. That is the scope of program management. A program manager’s job is to coordinate the dependencies among component projects and make each project serve the overall program objectives. You can also test this the other way: if the problem were an interface issue inside a single project, that project manager could coordinate it alone. Once several projects constrain one another and one manager cannot get movement, the next level up, program management, has to bring it together. The root of the conflict is that no one is coordinating the dependencies, so the answer is C.
Why the other options are wrong
- A. A portfolio manager focuses on strategic alignment, prioritization and resource allocation. A portfolio manager is not responsible for resolving dependency conflicts among specific projects.
- B. A project management office’s responsibilities depend on organizational authority. The stem does not say that this PMO is authorized to manage the interproject dependencies, while coordinating dependencies among component projects is explicitly the program manager’s role, so the program manager is more suitable.
- D. A sponsor is usually concerned with, and accountable for, the objectives and resources of a particular project. A sponsor is not a role dedicated to coordinating dependencies across several projects and would find it hard to bring the three together.
Key takeaway When projects affect one another and their dependencies need coordinating, that is program management, so turn to the program manager.
Variation If the three projects did not affect one another and management only had to decide which to do first because the budget is limited, you would turn to the portfolio manager or management. That is portfolio management.
- Question 40
An agile team at a consulting firm is overhauling the procurement approval system for a manufacturer. Midway through the project, two department heads at the manufacturer doubt whether the team can finish on time. What is the MOST effective way to rebuild their confidence?
Show answer and explanation
Correct answer: A
Midway through the project, two department heads doubt whether the team can finish on time. The question asks what most effectively rebuilds their confidence.
Agile principle 7 is: working software is the primary measure of progress. Stakeholders' confidence comes from results they can see and touch. Delivering working software with more complete functionality at the end of every iteration is the most persuasive evidence there is, more effective than any explanation. The answer is A.
Why the other options are wrong
- B. More communication meetings add information, but they produce no new results, so the root of the doubt, whether it can be finished, goes unanswered.
- C. Self-organization is the team's way of working, not a result the stakeholders care about. Stressing the way of working cannot replace results.
- D. Agile calls for problems to be surfaced early and transparently, not for fewer problems to be shown. Deliberately showing fewer problems damages trust and goes against transparency.
Key takeaway The most powerful way to reassure stakeholders is to keep delivering working software every iteration.
Variation If the stem were changed to “stakeholders want to know progress at any time”, the answer shifts to information radiators (task boards, burndown charts). If it asked how to measure progress, the answer is still working software, not the number of documents or hours.
- Question 41
A company’s new logistics center information system is out to public tender, and the tender documents specify weighted scoring against source selection criteria established in advance. The procurement team has received five proposals and is about to evaluate them. What should be done in the evaluation?
Show answer and explanation
Correct answer: C
The project is in the evaluation phase of conducting the procurements. Five proposals have been received, and the question asks for the correct way to evaluate them.
The signals: “public tender”, “five proposals” and “how should evaluation be done”. Evaluation follows the source selection criteria fixed in advance and written into the bid documents, using the weighting system: set a weight for each criterion, score each seller on each criterion, multiply the scores by the weights and add them up for a total. This reduces personal bias and also makes it easy to explain the basis of the evaluation publicly. The answer is C.
Why the other options are wrong
- A. Looking at price alone ignores criteria such as the technical approach, capability and quality; apart from standard or routine procurements, a pure lowest-price choice should be avoided.
- B. Ranking by impression has no common standard, is highly subjective, cannot be explained publicly and is not fair.
- D. Size and reputation do not mean the best fit for the requirements, and ranking by them departs from the evaluation criteria set in advance.
Key takeaway Evaluation relies on criteria and weights set in advance, scoring item by item and adding up, not on price alone or on impressions.
Variation If the stem said the procurement was standard or routine with a well-defined outcome, the least cost method could be used, selecting the lowest price among proposals that meet the minimum requirements; where a criterion has a minimum requirement, common exam practice also adds a screening system, so that proposals falling short are eliminated directly.
- Question 42
A project manager is responsible for an agile project in a fast-changing market. The sponsor worries about whether the benefits will be realized and asks the project manager to watch for changes that could affect the product. What should the project manager do to identify and respond to their effect on product value?
Show answer and explanation
Correct answer: A
In an agile project in a fast-changing market, the sponsor worries about benefit realization and asks the project manager to watch for changes that could affect the product. The question is what action identifies those changes.
PMBOK 8 describes the Product Backlog as a dynamic, prioritized list that lets the team focus on value-driven outcomes, enables continuous prioritization and keeps alignment with stakeholder expectations. Reassessing and reordering the backlog after each Sprint and whenever new information arrives, while checking whether its user stories are still valuable, identifies the effect of change on product value and turns that effect into adjustments to backlog items. The answer is A.
Why the other options are wrong
- B. The question is about identifying changes that affect the product, not adjusting the Sprint Goal. The Sprint Goal should stay stable during the Sprint, and changing it at will breaks the team's focus.
- C. Halting the Sprint at the first sign of an external change disrupts the rhythm and hurts morale. It goes against sustainable delivery, does not help identify changes, and is merely a reactive step.
- D. Pair programming is a development technique for improving code quality and sharing knowledge. It has nothing to do with identifying business changes and cannot make a team “respond immediately to every change”.
Key takeaway Reassessing and reordering the Product Backlog regularly, for example after each Sprint, and whenever new information arrives, is how to identify and respond to business change.
Variation If an external change makes the current Sprint Goal obsolete, only the Product Owner has the authority to cancel the Sprint. If the Sprint Goal remains valid, the Product Owner and Developers clarify and renegotiate scope as more is learned.
Reference Product Backlog and Increment · Lesson 1: The Product Backlog: Nature, Ownership and Change Handling
- Question 43
A consulting firm arranges its work groups by project. Members report day to day to a full-time project manager in a designated role who has high to almost total authority. When the project ends, members are assigned to other projects in the firm instead of returning to their original functional departments. Which organizational structure does this firm use?
Show answer and explanation
Correct answer: C
At a consulting firm, work groups are arranged by project, and members report to a full-time project manager in a designated role with high to almost total authority. After the project, they are assigned to other projects. The question asks which structure the firm uses, with no particular phase.
In the PMBOK 8 comparison of organizational structures (Table 2-1), a project-oriented organization arranges work groups by project, and the project manager holds a full-time, designated role with high to almost total authority. The stem explicitly provides these decisive characteristics; assignment to another project instead of returning to a functional department is only a helper clue. The answer is C.
Why the other options are wrong
- A. A matrix organization arranges work by job function. Even in a strong matrix, the project manager's authority is moderate to high rather than the high-to-almost-total authority stated in the stem, so it does not match.
- B. A functional organization is arranged by job function, members report to the functional manager, the project manager is a part-time coordinating role, and members return to their home department after the project.
- D. A multidivisional organization arranges divisions by dimensions such as product, production process, portfolio, program, geographic region or customer type, and project manager authority is low. That does not match the stem.
Key takeaway Work groups arranged by project and a full-time, designated project manager with high to almost total authority point to a project-oriented organization; where members go afterward is only a helper clue.
Variation If members returned to their own functional departments after the project, the structure would be closer to a matrix or functional organization.
Reference Organizational Structures · Lesson 1: Functional, Project-Oriented and Matrix Organizations
- Question 44
While establishing project governance, the project manager finds that the organization requires all spending above $100,000 to be approved centrally by the procurement department, while the fast-track purchasing process designed in the project plan conflicts with this. What should the project manager do?
Show answer and explanation
Correct answer: D
While establishing project governance, the project manager finds that the organization requires all spending above $100,000 to be approved centrally by the procurement department, which conflicts with the fast-track purchasing process designed in the project.
Project governance is established inside the framework of organizational governance. Organizational policy is the higher-level constraint, and the project has no authority to make its own rules. When they conflict, follow the organization's procurement approval policy. If the project arrangements are really affected, then talk to the procurement department about adjusting them, resolving it through communication and not by going around the policy. The general order for governance conflict questions is to follow the higher-level rule first and then communicate to adjust. Going around it, acting first and explaining later, and delaying implementation are all forms of avoidance. The answer is D.
Why the other options are wrong
- A. Setting up a separate approval rule inside the project goes over the head of organizational governance. It is improvising your own workaround.
- B. Buying through the fast-track process first and explaining afterward is acting first and seeking approval later, and it already breaches the policy.
- C. Not applying the rule for now and waiting for the governance plan to be finalized is still avoiding organizational policy, and finalizing the plan cannot change what the policy requires.
Key takeaway Project governance is established inside the organization's governance framework. When policies conflict, follow first, then communicate to adjust.
Variation If the project's own process is dragging down value delivery, such as a six-page review form for every deliverable, gather facts and negotiate a change with management. If the problem is beyond your authority, escalate along the escalation path.
- Question 45
The company asks an agile practitioner to lead a team in moving from a waterfall model to agile, and some key stakeholders do not understand the change. As the agile coach, what benefit of adopting agile should you explain to them?
Show answer and explanation
Correct answer: D
The company has an agile practitioner lead a team from waterfall to agile, and some key stakeholders do not understand the change. The question asks what benefit of adopting agile the coach should explain to them.
Agile is value-oriented: it delivers high-value increments continuously by priority, so stakeholders can use results earlier, give feedback earlier, and therefore have an earlier chance to realize benefits. This is the most defensible reason to give people who do not understand the transition, and it corresponds to the first principle: satisfy the customer through early and continuous delivery of valuable software. The other three either exaggerate agile's “freedom” or misunderstand how agile handles change. The answer is D.
Why the other options are wrong
- A. Agile still manages change: a new requirement is put into the product backlog and ordered by the Product Owner. It does not bypass the process and go straight to the team.
- B. Agile does not remove planning. It uses adaptive planning that rolls forward with iterations, and starting work early does not mean not planning.
- C. Once an iteration has started, its scope is generally not added to at will. New work goes into the product backlog to wait for ordering, and the team does not commit to inserting new work at any time within the iteration.
Key takeaway When explaining the benefit of agile to stakeholders, stress “continuously delivering high-value increments and benefiting early”.
Variation If stakeholders worry about losing control, stress that at every iteration review they can inspect the increment and adjust direction. Transparency and adaptation are the means of control.
Reference The Agile Manifesto · Lesson 2: The Twelve Principles (Part 1): Customer Value and Continuous Delivery
- Question 46
A coffee chain is opening its first store in Southeast Asia. After the schedule baseline was approved and the project entered execution, a stakeholder worried that local business permit processing would be delayed. A subject matter expert reviewed this and recommended allowing more time for the permit activity, and the change control board approved the recommendation. Which document should the project manager update FIRST to record this change?
Show answer and explanation
Correct answer: C
On a predictive project, the schedule baseline is approved and the project is in execution. The change control board has approved an adjustment that allows more time for the business permit activity. The question asks which document to update first.
The change allocates more time to the permit activity, so what it changes directly is the schedule. When an approved change affects a baseline, the schedule baseline is updated so that it matches the approved plan. For questions of the type “a change was approved, what is updated first”, look at what kind of content the change alters: timing maps to the schedule baseline, work content to the scope baseline, and funding to the cost baseline. Note also that a baseline update must be formally integrated into the project management plan, and changing only the project schedule is not enough; approval comes first and the update after it, and the updated baseline becomes the new reference for later variance analysis. The answer is C.
Why the other options are wrong
- A. The work content has not changed, only the timing, so the scope baseline is unaffected.
- B. The risk register records risks, but here the change has been approved and what needs recording is the change in timing. Risk information can be updated afterward but is not the first document to update.
- D. The stem mentions no change in cost, so the cost baseline should not be the first thing updated.
Key takeaway An approved change that alters the timing: update the schedule baseline.
Variation If the change also added a paid expedited service, the cost baseline would have to be updated at the same time.
- Question 47
A tester on an online-education app project finds a functional defect that forces a module to be reworked, and this defect had already been raised at the previous phase gate review meeting. To avoid a similar situation in the future, what should the project manager do?
Show answer and explanation
Correct answer: A
The project is in testing. A defect was raised at a phase gate review long ago but nobody followed up, and it eventually forced rework on a module. What management action would keep “raised but nobody owns it” from happening again?
The key signals are “had already been raised” and “avoid a similar situation in the future”: the defect has occurred, so it is an issue, not a risk, and issues are managed through the issue log. The issue log records each issue's description, owner, resolution date and status and is updated continuously as part of monitoring. Logging this defect, assigning an owner and monitoring the corrective action means every issue raised gets someone to claim it, a deadline and an outcome, which closes the gap in the mechanism itself. The answer is A.
Why the other options are wrong
- B. Looking through the minutes only shows how it was handled at the time. It is retroactive, does not assign an owner or a due date for the defect at hand, and cannot keep the next issue from being missed.
- C. “Step up inspection and watch for problems” is a vague action. It sets up no record or accountability for this specific defect, so next time something may again be raised and nobody own it.
- D. The risk register manages uncertain events that have not yet occurred. This defect has already caused rework, so it is an issue that has occurred; writing a response strategy and trigger conditions for it mistakes an issue for a risk.
Key takeaway Record an issue that has occurred in the issue log, assign an owner, and track it to resolution; only uncertain events that have not yet occurred go in the risk register.
Variation If the stem said “testing finds that a supplier may deliver late, but this has not happened yet,” it is a risk: record it in the risk register and plan a response, not in the issue log.
Reference Issue Management · Lesson 1: Issue Log: Issues, Risks and Change Requests Compared
- Question 48
Chris uses a chart to follow the progress of an agile project, recording each day how much work remains on the iteration backlog. What tool is he using?
Show answer and explanation
Correct answer: A
This is iteration-level progress tracking on an agile project. Chris records each day how much work remains on the iteration backlog, and the practice has to be matched to a specific chart.
PMBOK 8 defines a burndown chart as a visual tool that shows the work remaining versus the time left in a timebox. Time is on the horizontal axis and remaining work (commonly story points) on the vertical axis; it is updated daily during the iteration, and the line falls as work is completed. “Recording the remaining work each day” is exactly its data source. The answer is A.
Why the other options are wrong
- B. A control chart is a quality management tool used to judge whether a process is stable and its results predictable. It does not record the daily remaining work in an iteration.
- C. A release roadmap shows what the product will deliver over time. It is long-term, high-level planning and does not record remaining work day by day.
- D. An earned value chart evaluates performance against the cost and schedule baselines. It is not used to track the iteration backlog day by day.
Key takeaway The chart that records the remaining work of an iteration day by day is the burndown chart. In an iteration burndown chart, the horizontal axis is the days in the timebox and the vertical axis the remaining work; comparing the two shows whether the work will finish on time.
Variation If the record were “completed work accumulated toward a milestone”, that would be a burnup chart, whose line starts at zero and rises.
Reference Burndown Charts and Information Radiators · Lesson 1: Reading Burndown and Burnup Charts: Remaining Work, Completed Work and Scope
- Question 49
Because of sharp swings in raw material prices, the company changes its strategy and appoints you project manager of a new project. Most of the project’s requirements are changing rapidly, and senior leaders believe that part is better suited to adaptive development; however, part of the project’s established scope must still be managed predictively, and the team has done only predictive projects before and has no adaptive experience at all. Which life cycle should you choose?
Show answer and explanation
Correct answer: D
Sharp swings in raw material prices lead the company to change its strategy, and the new project’s requirements change quickly. Senior leaders think adaptive suits better, but part of the established scope must still be managed predictively, and the team has done only predictive projects and has no adaptive experience. Which life cycle should be chosen?
Choosing an approach must take into account both the project’s needs and the team’s capability: PMBOK 8 lists organizational culture, stakeholder involvement, and the project environment among the selection factors. Senior leaders’ expectation should be met, and the part with changing requirements really does need adaptive practices; but part of the established scope must still be managed predictively, which a purely adaptive approach cannot cover. When both kinds of work coexist, only a hybrid approach covers them together. It also keeps the predictive practices the team knows and introduces iteration gradually in the changing part, which both responds to the leaders’ request and gives the team a transition period. Insufficient team experience alone does not lead to a hybrid approach; it has to be judged together with the characteristics of the project’s work. The answer is D.
Why the other options are wrong
- A. Incremental only describes delivering in batches. It is not the adaptive approach the leaders want and does not help the team transition smoothly.
- B. An adaptive approach matches the leaders’ expectation and the changing requirements, but part of the project’s scope is established and must still be managed predictively, which a purely adaptive approach cannot cover; with a team that lacks experience, switching abruptly would also add execution risk.
- C. A predictive approach is the one the team knows best, but it cannot meet the need to handle rapidly changing requirements and goes against the leaders’ intent.
Key takeaway When part of the scope is established and must be managed predictively while another part has changing requirements that call for adaptive practices, choose a hybrid approach; when the team lacks experience it can also serve as a transition.
Variation If all the requirements of the project were changing quickly and no scope had to be managed predictively, you should choose adaptive and fill the team’s adaptive capability gap through training and coaching.
Reference Hybrid Approaches · Lesson 2: Transitioning Gradually to a Hybrid Approach, and Managing a Hybrid Environment
- Question 50
On a predictive project, the planned delivery work of the first phase is complete and the phase is nearing its end, but the project as a whole has not ended. What should the project manager do?
Show answer and explanation
Correct answer: A
A predictive project proceeds in phases. The planned delivery work of the first phase is complete and the phase is nearing its end, but the project as a whole has not ended. You must decide what the project manager should do now.
A phase is a stretch of work that culminates in the completion of one or more deliverables. When a phase ends, what you do is close out that phase: verify that the deliverables meet the acceptance criteria, organize the project documents, record lessons learned and prepare for the next phase. If the governance arrangement includes a phase gate, then participate in the review and act on its decision. For normal completion as planned, closing the project as a whole waits until all phases are complete; the end of the current phase cannot be treated as the end of the project. The answer is A.
Why the other options are wrong
- B. A phase boundary is a control point. Ignoring it bypasses the required phase-closing work and, if governance calls for a phase gate, also skips that review, allowing the previous phase's leftover problems to be carried into the next phase.
- C. For a project completed as planned, overall closure comes after all phases are complete. Only the first phase has ended, and closing all work would cut off the later phases with it.
- D. The end of a phase is not project termination. The gate review may indeed decide to end the project, but until the review makes a decision the project manager should not halt work and wait on his own.
Key takeaway At the end of a phase, close out the phase; if a phase gate is established, participate in the review and act on its decision. For normal completion as planned, overall project closure follows completion of all phases.
Variation If the gate review finds that only some of the exit criteria were met, the decision could be “continue to the next phase with modification”, “remain in the phase” or “repeat the phase”. It is not limited to pass and stop.
- Question 51
PMLyceum signs a software development contract with a supermarket chain. The contract says that if the work is accepted earlier than the agreed date, the customer will pay an early-completion bonus. Near the end of the project, a test engineer reports to the project manager that the inventory module fully meets the acceptance terms written in the contract but cannot support the stocktaking function the stores actually need. If that function is added, the project cannot be accepted early. What should the project manager do?
Show answer and explanation
Correct answer: D
A software development contract carries an early-acceptance bonus. Before closing, the team finds that the inventory module meets the acceptance terms but not the stocktaking function the customer’s stores really need, and adding it would forfeit the bonus. The question asks what the project manager should do, and the basis for the judgment is the requirements on honesty, transparency and professional ethics.
The logic is that meeting the terms on paper is not the same as meeting the customer’s real needs, and adding the function would cost the company its bonus, which is exactly where the temptation lies. The honesty value in professional ethics requires honest disclosure of facts that affect the customer’s interests, and not avoiding them because of a bonus. So the project manager should explain the situation to the customer and negotiate a way forward acceptable to both sides, such as adjusting the acceptance date, the bonus conditions, or delivering in phases. The answer is D.
Why the other options are wrong
- A. The project manager knows the module cannot meet the customer's real need, yet accepts it early under the contract terms without first telling the customer and postpones the known gap into a later change. That withholds information that affects the customer and is dishonest. The acceptance date, the bonus conditions and the arrangements for adding the function should be negotiated with the customer first, so A is wrong.
- B. Blaming the customer for the delay and bargaining for the bonus puts the company’s own interest first before the problem has even been disclosed, and it does not solve the functional gap.
- C. Not telling the customer and quietly pulling other resources to build the function conceals the facts from the customer and may drag down other work. It only moves the problem elsewhere.
Key takeaway When you find a deliverable cannot meet the customer’s real needs, first tell them honestly and negotiate; do not conceal it or fix it quietly for the sake of a bonus.
Variation If the bonus terms matched the contract’s acceptance terms exactly and the customer’s needs were already met, there is no ethical conflict and the work is accepted normally under the contract. If the scenario were that the customer asks you to make the schedule data look better, the choice is likewise to report honestly and decline.
- Question 52
PMLyceum's membership points platform project has been authorized by a project charter and formally launched. The project manager is convening the main stakeholders to prepare a document that sets out the procedure by which completed deliverables will be formally accepted. What is this document?
Show answer and explanation
Correct answer: B
The project charter is approved and the project manager is convening the main stakeholders to prepare a document. The question is which document sets out “the procedure by which completed deliverables are formally accepted,” that is, a plan that sets out the method rather than a document that records specific content.
The scope management plan describes how the scope will be defined, developed, monitored, controlled and validated, and it includes the process that specifies how formal acceptance of the completed project deliverables will be obtained. The document in the stem is meant to set out the acceptance procedure, so the answer is the scope management plan. A simple rule helps: the procedure belongs to the plan, and the conditions belong to the statement. The answer is B.
Why the other options are wrong
- A. The scope statement holds the acceptance criteria for each deliverable, that is, the conditions the deliverable must meet before it can be accepted. It does not set out the procedure by which acceptance is carried out.
- C. The requirements management plan sets out how requirements are analyzed, documented and managed. It governs requirements, not the acceptance of deliverables.
- D. The work breakdown structure is a hierarchical decomposition of project work, used to organize and assign work. It does not set out an acceptance procedure.
Key takeaway The scope management plan sets out “how to manage,” including the process for formally accepting deliverables; the acceptance criteria themselves are written in the scope statement.
Variation If the stem were changed to “what conditions each deliverable must meet to count as acceptable,” the answer would become the acceptance criteria in the scope statement.
- Question 53
The team has completed and tested the signal control software for a city rail transit system, and the results are about to be submitted to the regulator for review. The software must meet several regulatory requirements and industry standards. What should the project manager do now?
Show answer and explanation
Correct answer: C
The project is near closure, development and testing are done, and the results are about to go to the regulator. The question asks what the project manager should do at this point.
The software is finished, and what the regulator looks at is whether the final result conforms to the standards and regulations. Now you verify the software's conformance item by item against every standard and regulation, so that the results submitted are acceptable. This is verification of the deliverables, part of the Monitor and Control Scope work of checking that deliverables meet the standards and regulatory requirements: it checks whether the deliverable has the defined attributes. The results are complete and about to be submitted, and what decides the outcome is a conformance conclusion, not process information or staffing. The answer is C.
Why the other options are wrong
- A. An expert can take part in verification, but the stem does not say the team lacks the ability to verify, so adding an expert is not what is most needed now.
- B. Identifying potential threats is risk work that runs throughout the project, and such requirements should have been identified at the start of development. Doing it near submission does not focus on “whether the results are acceptable”.
- D. Tracking the implementation percentage is a process measure that reflects progress, but it is not the same as verifying the final results. The results are complete, and what is needed now is a conformance conclusion.
Key takeaway Before the results are delivered, verify the conformance of the deliverables against the standards and regulations and do not only measure the process.
Variation If the stem changed to “development is halfway, how do you make sure the team proceeds as required”, then process means such as tracking the implementation percentage, quality assurance and audits would come into play.
- Question 54
A project manager is assigned to manage a portal website redesign project. Before execution begins, the project manager learns that one stakeholder does not support the project and is unwilling to attend the necessary project meetings, and is likely to resist project activities during execution. What should the project manager do FIRST?
Show answer and explanation
Correct answer: A
Before execution of a portal website redesign project, the project manager learns that a stakeholder does not support the project, is unwilling to attend the necessary meetings and is likely to resist during execution. You must decide what to do first.
The stem asks what to do “first.” When a stakeholder appears resistant, first speak with the stakeholder directly to understand the concerns and cause of the resistance. Then document the confirmed information in the stakeholder register, assess the current and desired engagement levels in the stakeholder engagement assessment matrix, and choose targeted engagement actions. Escalating or trying to persuade unilaterally first is premature. The answer is A.
Why the other options are wrong
- B. Ordinary problems do not go to the sponsor first. Moreover, the reported resistance has not yet been confirmed directly and its cause is unknown, so escalating is premature, and going to the sponsor is not the project manager's first move.
- C. The business case explains whether the project is worth doing, whereas his problem is attitude and participation. Just reading it will not reveal his reasons and will not resolve the resistance.
- D. Notifying senior management and asking them not to be influenced is avoidance rather than handling the issue, and it takes no action to engage this stakeholder.
Key takeaway When information indicates resistance, communicate directly with the stakeholder first to understand the concerns, then document the assessment and refine the engagement strategy.
Variation If the question asked what to do “after the assessment,” the answer would be to develop a targeted communication strategy, for example, first learn the root cause of the resistance and then arrange a meeting with him.
- Question 55
A new project manager at PMLyceum finds that under the formal approval process the design proposal must be approved by the chief technology officer. In actual reviews, however, the opinion of a senior architect with no management title often sways the conclusion, and the other reviewers almost always echo it. How should the project manager respond?
Show answer and explanation
Correct answer: B
During planning and review, the design proposal must formally be approved by the chief technology officer, but in actual reviews a senior architect with no management title often sways the conclusion and the other reviewers almost always echo him. The question asks, in light of political awareness, what to do when formal authority and actual influence do not match.
PMBOK 8 says that political awareness “helps project managers to plan communications based on the project environment as well as their organization’s political environment,” and that it concerns the recognition of formal and informal power relationships and the willingness to operate within these structures. Its aspects include understanding the strategies of the organization, knowing who wields power and influence, and developing an ability to communicate with these stakeholders. The senior architect holds real influence without a management title, so the project manager should treat him as a key stakeholder, plan communication accordingly and seek his input and support. The answer is B.
Why the other options are wrong
- A. Recognizing only the formal approval process ignores informal power relationships. Review conclusions are in fact shaped by the architect, so talking only with the chief technology officer would miss the person who really influences the decision.
- C. Asking the sponsor to bar him uses authority to suppress influence, loses his professional contribution and easily provokes opposition.
- D. Lobbying reviewers privately to stop echoing the architect is manipulation, not communication. It damages mutual trust; the project manager should engage people with influence, not oppose them.
Key takeaway Power can be formal or informal; knowing who holds power and influence and building communication with them is political awareness.
Variation If the stem said that a new team member is close to senior leadership, he should likewise be brought into the communication plan, neither avoided nor courted. If the question asked how to raise one’s own influence, the answer would rest on expertise and mutual trust.
- Question 56
In its annual review, a group evaluates a completed customer portal project. In judging whether the project outcomes were successful, what is the MOST central criterion?
Show answer and explanation
Correct answer: C
A group evaluates a completed customer portal project in its annual review. The question is the most central criterion for judging whether the project outcomes were successful.
Project success requires evaluating two dimensions, outcomes and management, and both matter. Of the two, the success of project outcomes is critical to the targeted business value. Here the question asks whether the outcomes were successful, so the most central criterion is whether the project delivered the intended business value and aligns with the organization’s strategy. On time and on budget belong to the management dimension and show only whether execution was efficient. A way to remember it: when judging outcomes, ask whether value was realized; only when judging whether execution was efficient do you look at cost, scope, time and quality. The answer is C.
Why the other options are wrong
- A. Finishing within the planned duration and budget reflects only the success of the management process. It cannot stand in for whether value was realized.
- B. Projects almost always encounter risk events. Whether any occurred does not show whether value was realized.
- D. Change is a normal part of a project. Zero changes is neither realistic nor a criterion of success.
Key takeaway Whether project outcomes succeeded depends mainly on whether the intended business value was realized and aligned with strategy. On time and on budget belong to the management dimension, and both dimensions need to be assessed.
Variation If the question were about whether the project management process succeeded, the answer would become adherence to constraints such as cost, scope, time and quality.
- Question 57
A new project enters the planning stage, and the project manager needs to develop a budget that covers the entire project scope. What should the project manager do?
Show answer and explanation
Correct answer: B
In the planning stage a budget must be developed that covers the entire project scope, and you need to judge how to develop it.
The key signal is “covers the entire scope”. The WBS decomposes all deliverables to the work package level and is the structural framework of the budget. Estimating the cost of each work package against the WBS and then aggregating it by time with the schedule, layer by layer, ensures no scope is missed and ties the budget to scope and schedule. The purpose of Develop Budget in PMBOK 8 is to aggregate the estimated costs of individual activities or work packages to establish an authorized cost baseline. The answer is B.
Why the other options are wrong
- A. The charter holds only high-level information. Roughly estimating by phase from it is too coarse, cannot cover the detailed scope and cannot form a controllable baseline.
- C. Having several stakeholders each estimate a total and averaging the results rests on no detailed scope, so the figure has no basis and its reliability cannot be assured.
- D. Adjusting the budget of a similar project is analogous estimating. It gives only a rough number, hardly reflects the detail of this project's entire scope, and cannot be used directly as the budget.
Key takeaway A budget is built by estimating item by item from the WBS and aggregating by schedule, which covers the entire scope.
Variation If the question only asked for “a rough figure for the investment committee as soon as possible”, use analogous estimating, not item-by-item aggregation from the WBS.
Reference Cost Baseline and Reserves · Lesson 1: Cost Aggregation and the Cost Baseline: What Is in the Budget
- Question 58
PMLyceum must choose how to implement a new data analytics module (see the decision tree in the figure, which shows amounts in thousands of dollars). Alternative A is to build in-house, with an investment of $120,000. Alternative B is to buy an off-the-shelf product, with an investment of $50,000. The probability of high market demand is 40% and of low demand 60%. In-house development brings revenue of $300,000 under high demand and $100,000 under low demand. Buying brings revenue of $150,000 under high demand and $80,000 under low demand. By EMV, which alternative should be chosen, and what is the EMV of the whole decision?
Show answer and explanation
Correct answer: D
At the stage of choosing an alternative, demand is uncertain, and a decision tree is used to compare building in-house (A) with buying (B) and to find the EMV of the whole tree. The stem gives revenues and investments.
The stem gives revenues and investments, so first calculate the net path values (revenue minus investment), then weight by probability at the chance nodes and finally take the larger at the decision node. The investment is deducted only once. A's EMV is $60,000 and B's is $58,000, A is larger, and the EMV of the whole decision is $60,000. The answer is D.
- Probability check: 40% + 60% = 100%
- Net path values: A high 300 − 120 = 180, A low 100 − 120 = −20; B high 150 − 50 = 100, B low 80 − 50 = 30 (in thousands)
- EMV(A) = 0.4 × 180 + 0.6 × (−20) = 72 − 12 = $60,000
- EMV(B) = 0.4 × 100 + 0.6 × 30 = 40 + 18 = $58,000
- Take the maximum at the decision node: 60 is greater than 58, so choose A and the decision EMV is $60,000
Why the other options are wrong
- A. B's EMV of $58,000 is calculated correctly, but it is smaller than A's $60,000. At the decision node you take the larger, and you cannot treat the smaller as the best.
- B. 180 is actually the net path value of the high-demand branch of A (300 − 120). It takes a single branch, with no weighting and no low-demand branch.
- C. 72 = 0.4 × 180 is the weighted value of the high-demand branch only and leaves out the low-demand branch, 0.6 × (−20) = −$12,000.
Key takeaway Calculate the net path values first, then weight by probability, and finally take the maximum at the decision node. Deduct the investment only once.
Variation The two EMVs differ by only $2,000, which is very close. In that case go back and check whether the probability estimates are reliable, and use the break-even probability to judge whether the conclusion could flip.
- Question 59
The team on a software outsourcing project uses PESTLE analysis to examine the external environment. What does the dimension for the letter E (Environmental) mainly focus on?
Show answer and explanation
Correct answer: D
The team is using PESTLE analysis for the external environment and needs to be clear what the letter E (Environmental) focuses on.
PESTLE stands for, in order, political, economic, sociocultural, technological, legal and environmental. A way to remember it: in P-E-S-T-L-E, the first E (the second letter) is economic and the final E is environmental. This stem specifically says Environmental, and that dimension focuses on requirements for environmental protection, climate and sustainability, so the answer is D.
Why the other options are wrong
- A. Changes of government and policy stability belong to the political (P) dimension.
- B. Inflation, exchange rates and the economic cycle belong to the economic dimension. It shares its initial with environmental, which makes it easy to confuse.
- C. Emerging technologies and innovation trends belong to the technological (T) dimension.
Key takeaway PESTLE has two Es: the second letter is economic, and the last letter is environmental.
Variation If the question asked about the second letter E in PESTLE, the answer would be economic. For the E in TECOP, it would be environmental, because TECOP has no economic factor.
- Question 60
A company is launching a new business system that requires every department to change its working habits, and the project manager has a supporting role in the effort. What principle should guide the project manager's approach to the change?
Show answer and explanation
Correct answer: D
A company launches a new business system that requires departments to change their working habits, and the project manager has a supporting role. The question asks which principle the project manager should hold to first.
People's ability to adapt is a key factor in whether an organizational change succeeds. The principle for the project manager is to put people first: pay attention to the impact on the employees affected by the change and help them transition to the new situation. Even if the technology and results are delivered, if people do not accept or cannot use them, the change still does not take hold. The answer is D.
Why the other options are wrong
- A. Narrowing the coverage of the change as far as possible avoids the change instead of managing its impact on people, and it would not achieve the purpose of the system go-live.
- B. Rolling everything out in one push ignores how receptive employees are and how long they need to adapt. It easily triggers resistance, and problems are hard to clean up.
- C. Delivering on time and leaving adoption to the operations department postpones the problem of people adapting, and the change often fails to take hold.
Key takeaway People's acceptance and adaptation are key factors in a change's success: put people first and help those affected adapt. Change takes hold when people accept it, and communication, involvement and training are the usual means of helping employees adapt.
Variation If the change affects a very wide area, roll it out in batches and stages, doing communication and training before each batch before moving to the next. This is still putting people first.
Reference Organizational Change · Lesson 2: Communication, Involvement and Training in Change
- Question 61
A smart-home gateway upgrade project has a $200,000 budget and a planned duration of 10 months, with planned work and budget spread evenly over that period. At the end of month 4, the project has spent $75,000 and completed 30% of the work. Which description of the cost performance index and the schedule status is correct?
Show answer and explanation
Correct answer: C
The stem gives the budget, duration, elapsed time, percent complete and spending. You must calculate CPI and judge the schedule.
CPI and SPI have different denominators: CPI = EV ÷ AC and SPI = EV ÷ PV. With 30% complete, EV = $60,000. On a 10-month plan, 40% should be complete at the end of month 4, so PV = $80,000. CPI = $60,000 ÷ $75,000 = 0.80 and SPI = $60,000 ÷ $80,000 = 0.75, below 1, so the project is behind schedule. Only C combines CPI = 0.80 with behind schedule. The answer is C.
- EV = $200,000 × 30% = $60,000; PV = $200,000 × 4 ÷ 10 = $80,000; AC = $75,000
- CPI = $60,000 ÷ $75,000 = 0.80; SPI = $60,000 ÷ $80,000 = 0.75
- Check: SPI below 1 means behind schedule; CPI below 1 means over budget. Neither is good
Why the other options are wrong
- A. CPI is right, but the schedule judgment is wrong: 30% is complete against 40% planned, which is behind. It may come from treating spending of $75,000 being close to PV of $80,000 as normal progress.
- B. 0.75 is the SPI, not the CPI, and an SPI below 1 does not mean the schedule is on plan. Both judgments are wrong.
- D. The schedule judgment is right, but the SPI of 0.75 has been mistaken for the CPI. The CPI denominator is AC, giving 0.80.
Key takeaway CPI = EV ÷ AC and SPI = EV ÷ PV. The denominators differ, so do not mix them up.
Variation If spending were $60,000, CPI = 1.0, exactly on budget, but SPI would still be 0.75.
Reference Earned Value Management · Lesson 3: Performance Indices: SPI and CPI, and Judging Project Status
- Question 62
PMLyceum’s data center migration project is in the execution stage. While assessing status, the project manager finds that the network team, to make its own cutover metric look good, moved the entire switchover window earlier. This disrupted the go-live preparation of the application and test teams, and the overall go-live date is now at risk of slipping. This is a classic case of local optimization. What should the project manager do?
Show answer and explanation
Correct answer: B
The data center migration project is in the execution stage. During a status assessment, the project manager finds that the network team disrupted other teams for the sake of its own metric, and the overall go-live date is threatened. The question asks what the project manager should do, and the key to the judgment is the principle Adopt a Holistic View.
The stem names “local optimization”, and the signal is that one team’s improved metric is paid for by other teams and by the overall date. The holistic view requires managing all components and their interdependencies as part of a larger system and aiming for the best result for the whole, not for a part. So the assessment should start from the whole project, see the dependencies among the teams clearly, and make local goals serve the overall goal, including re-planning the switchover window together with the teams if necessary. The answer is B.
Why the other options are wrong
- A. Checking only each team’s own metrics is exactly what produces local optimization: every team can “meet its metric” while the whole project is still damaged. This approach does no integration at all.
- C. Asking the network team to match the others “exactly” is still a local adjustment. It analyzes no dependencies and may give up time that could have been gained.
- D. Handing the separate statuses to the sponsor means the project manager gives up the integration responsibility. The project manager should ensure that team information and dependencies are integrated in the assessment rather than passing the overall judgment to the sponsor.
Key takeaway When assessing status, look at the dependencies among the parts first and then at each part’s own metrics; the parts serve the whole.
Variation If the scenario were changed to “one team’s heavy use of the shared test environment affects the other teams”, the thinking is the same: coordinate resources and dependencies from the standpoint of the whole. If the question asks “which principle applies”, the answer is Adopt a Holistic View.
- Question 63
The project manager of an e-commerce company is drafting the financial management plan, and the team disagrees about what the plan should contain. Which of the following is NOT usually specified in the financial management plan?
Show answer and explanation
Correct answer: C
The project manager is drafting the financial management plan and the team disagrees about its contents. The task is to find the item that is not part of the financial management plan.
The financial management plan answers “how do we manage money”, and records the rules for estimating, budgeting and monitoring: units of measure, accuracy, precision, control thresholds, rules of performance measurement, reporting formats and so on. Rule-type content belongs in the plan, while specific amounts and disbursement dates do not. The financial management plan sets out the methods and rules for managing finances and funding strategies, and does not record the specific amounts and arrival dates for each phase; those figures and timings are derived from the cost baseline and the funding requirements. Option C is about the specific amounts and arrival dates for each phase, so C is not part of the financial management plan. The answer is C.
Why the other options are wrong
- A. Control thresholds determine how large a variance must be before action is required. They are standard content of the plan, so they belong in it, and this is not the answer.
- B. Accuracy (the acceptable range) and precision (the digit to which values are rounded) are both written in the plan, so they belong in it, and this is not the answer.
- D. How to use earned value management and other performance measurement methods is also among the rules of performance measurement in the plan, so it belongs in it, and this is not the answer.
Key takeaway The financial management plan states rules, not specific amounts or disbursement dates.
Variation If the option read “the acceptable range for activity cost estimates is ±10%”, that is accuracy and belongs in the plan; if it read “$80,000 of funding is needed in the third quarter”, it is still a specific amount and does not belong in the plan.
- Question 64
A company plans to change its project management approach from waterfall to agile and to pilot it first on an upcoming project, and it has an agile expert train the project team. The training mentions the Scrum of Scrums meeting. Which statement correctly describes this meeting?
Show answer and explanation
Correct answer: C
A company is moving from waterfall to agile, and the training mentions the Scrum of Scrums meeting. The question asks what kind of meeting it is.
The Scrum of Scrums is a coordination mechanism between multiple teams: the agile teams under the same project or product each send a representative to synchronize progress and cross-team dependencies and impediments. How often it meets is decided by the coordination need. It is a practice of scaled agile. The answer is C.
Why the other options are wrong
- A. The Daily Scrum is a meeting inside a single team that syncs the day's work every day. The Scrum of Scrums is for multiple teams. The two are at different levels and are not aliases.
- B. The Scrum of Scrums has no fixed “every two weeks” rhythm. Its frequency is decided by need, and this option mistakes it for a fixed routine meeting.
- D. Its purpose is coordination, not leadership, and it does not set direction for the teams. An agile team's direction is held jointly by the Product Owner and the team.
Key takeaway The Scrum of Scrums is a coordination mechanism between multiple teams. It is not the Daily Scrum and not a leadership meeting.
Variation If asked how a large enterprise with dozens of teams should adopt agile, the answer is to adapt a scaling framework such as SAFe or LeSS, not to copy a small team's Scrum as is.
- Question 65
PMLyceum sends an agile coach to guide a new team in learning to use Kanban. The coach gathers everyone in a meeting room and starts by talking about how to get going. In this discussion, what should the team do FIRST?
Show answer and explanation
Correct answer: B
An agile coach has taken on a new team that is to adopt Kanban. This is the initial discussion. What should the team do “first”?
The starting point of Kanban is to make the existing workflow visible. The coach is a facilitator and should lead the whole team in drawing the process together: while drawing, the team sees where it can improve, and it also genuinely buys into the process. Participation builds buy-in, and only once the current state is drawn do the later WIP limits and rules for done have anything to rest on. The answer is B.
Why the other options are wrong
- A. If the line manager alone draws the diagram and then imposes it on the team, the team has no sense of participation and will find it hard to buy into the process.
- C. The coach is already responsible for guiding the team in agile practices, so there is no need to bring in outsiders. Outside instruction also cannot replace the team working out its own process.
- D. Having the manager and the coach set the process and WIP limits and then require the team to follow them is a directive approach. It goes against the principle that the team builds its own process, and talking about limits before the process has even been drawn is premature.
Key takeaway When introducing Kanban, first have the team draw its existing process. Participation builds buy-in.
Variation If the process has already been drawn, the next step is to set WIP limits for each column and agree the definition of done. If the team is spread across several locations, an electronic kanban board can be used, but the team still builds the process itself.
- Question 66
In a Sprint Retrospective, several members are quiet and the team’s task board has stalled. The Scrum Master senses signs of low morale. What should the Scrum Master do?
Show answer and explanation
Correct answer: B
In an agile team’s Sprint Retrospective, members are quiet and the task board has stalled. The Scrum Master senses signs of low morale and must decide what to do.
The Scrum Master is a leader who serves the Scrum Team and is accountable for its effectiveness, including coaching self-management and causing impediments to be removed. A morale problem is an internal team matter, so the Scrum Master should analyze the causes with the team and work out responses jointly. That follows the principle of self-management and also helps uncover the root cause. Passing the problem to others or leaving it alone solves nothing. The answer is B.
Why the other options are wrong
- A. Functional managers are not responsible for an agile team’s day-to-day morale. Asking them to step in pushes off the Scrum Master’s own responsibility and may make the team feel outsiders are interfering.
- C. The team already shows signs of low morale, which means relying on members’ self-motivation is not working. A servant leader does not stand by, and not intervening would make things worse.
- D. Morale is an internal team issue to be solved within the team. The Product Owner is responsible for product value and the Product Backlog, not for daily morale, so asking him first is going to the wrong person and delays action.
Key takeaway When an agile team’s morale is low, the Scrum Master works with the team to find causes and solutions, neither pushing the problem outward nor standing by.
Variation If the problem were a lack of necessary resources rather than morale, the Scrum Master would work with the team and organization to cause that impediment to be removed.
Reference Motivation Theories · Lesson 3: Applying Motivation Theories: Understand the Need First, Then Choose the Measure
- Question 67
A city launches a project to build a new urban green park. The project manager has told all parties the project charter is approved and is drawing up the project management plan. Then a nature conservation association sends an email asking about the project's objectives and start date. What should the project manager do?
Show answer and explanation
Correct answer: B
A city green park project's charter is approved and the project management plan is being drawn up when a nature conservation association emails asking about the project objectives and start date. The question asks what to do.
The association's inquiry shows that it is a newly appearing external stakeholder. PMBOK 8 says identifying stakeholders is done periodically and involves analyzing their interests, influence and potential impact on project success. The project manager should first analyze the association's stake and expectations and then decide how to communicate with it, updating the register and the plans, rather than just replying to the email and leaving it at that. The answer is B.
Why the other options are wrong
- A. Merely replying handles just this one inquiry, and the association may well come back later. Its demands have not been analyzed and it has not been brought into management, and you might also disclose information you should not.
- C. Brainstorming is just one way to identify and collect information, and using it to discuss how to reply to the email is a specific measure that would be considered only after analysis.
- D. The communications management plan should be written after the analysis, based on the party's needs. Without the analysis, what goes in has no basis.
Key takeaway When a new stakeholder appears, do stakeholder analysis first and then plan communication.
Variation If the analysis shows the association is a highly influential opponent, you also need to set an engagement strategy to raise its level of engagement.
Reference Identifying and Analyzing Stakeholders · Lesson 2: Stakeholder Analysis: What Information to Collect and the Five Kinds of Stakes
- Question 68
A project manager is assigned to a store digitization project at a supermarket chain. The group's culture is conservative and broadly resists transformation and innovation; employees say they do not see why the change is needed. What should the project manager do FIRST to support the transformation?
Show answer and explanation
Correct answer: A
A group with a conservative culture is carrying out a digital transformation through a project, and stakeholders resist. The question is what the project manager should do first to support the transformation.
Facing broad resistance, first help stakeholders understand the purpose and necessity of the change, and learn their specific concerns through training and communication; that reduces resistance and wins involvement. The test for the four options is whether the action helps stakeholders build an awareness of the purpose of the change. Only arranging training for stakeholders so that they understand the purpose builds that initial awareness and supports later involvement. Here, the session is a communication and briefing session about the purpose of the change, not hands-on operational skills training. ADKAR is a common exam term: explaining why the change is needed supports Awareness, while hands-on operational training develops Knowledge and Ability. The answer is A.
Why the other options are wrong
- B. Bringing in an expert and appointing that person as champion only adds one supporter and does not solve the problem of everyone else not understanding.
- C. Having senior leaders announce that the project manager will lead the project only confirms an identity and does almost nothing to reduce resistance.
- D. Handing out a guide is one-way push communication. It makes sure the information is sent, but not that employees understand it, and stressing “inevitable” does not explain why the change is necessary.
Key takeaway When stakeholders resist a transformation, first help them understand the purpose of the change.
Variation If the stem says employees already understand the purpose but do not know how to use the new system, that points to knowledge and ability, and the answer becomes training and hands-on coaching.
- Question 69
After a logistics company's freight settlement system went into use, the company was penalized by the regulator because the system did not comply with local tax regulations. Investigation shows that before delivery nobody had checked item by item whether the system met these regulations. What should the project manager have prepared before delivery to avoid the penalty?
Show answer and explanation
Correct answer: B
After go-live the system was penalized for not complying with local tax regulations, and investigation shows nobody checked item by item before delivery. The question asks what the project manager should have prepared before delivery.
The key signals are “no checking before delivery” and “should have in advance”. To find noncompliance before delivery, you need to plan beforehand the verification of the deliverables, using inspection, testing and the like to confirm that the deliverables meet the specified requirements, including regulations. With this step, noncompliance would have been found and corrected before go-live and there would have been no penalty. The answer is B.
Why the other options are wrong
- A. A risk response plan deals with potential risks. It does not directly verify that the system complies with the regulations, and it is not a check before delivery.
- C. An issue log records issues that have already happened. It is an after-the-fact tool and does no preventive work in advance.
- D. Sitting in on the weekly meeting only lets the audit department see progress. It cannot replace verification work that checks the deliverables' compliance item by item.
Key takeaway To avoid noncompliant results, verify the deliverables against the regulatory requirements before delivery.
Variation If the noncompliance is found only after the system is live, handle it as an issue: record it in the issue log, rectify it, and explain it to the regulator.
Reference Project Compliance · Lesson 3: Monitoring and Auditing Compliance
- Question 70
The team compares actual velocity with planned velocity and finds the project is behind plan. The agile management professional wants to find out where in the process time could be saved by eliminating waste. What should be examined?
Show answer and explanation
Correct answer: B
The agile project's actual velocity is behind plan, and the agile management professional wants to find where in the process time could be saved by eliminating waste. The question asks what to look at.
A value stream map displays the critical steps in a process and the time taken in each step. Beyond processing time, it shows waiting, rework and other waste, and the steps it identifies are where to improve. To find where time can be saved, you need the time broken down by step, not the overall trend of progress. A progress chart only tells you that you are behind; the value stream map tells you which step the time is spent in. The answer is B.
Why the other options are wrong
- A. A product roadmap is a long-term plan for the product. It does not show where time goes in the process.
- C. A burnup chart shows work completed and scope. It can show that you are behind, but not which step the waste is in.
- D. A burndown chart shows remaining work over time. It too reflects only progress and does not analyze waste in the process.
Key takeaway To find waste time that can be eliminated in the process, use a value stream map.
Variation If the map shows 7 days of value-adding time against 15 days of total lead time, process efficiency is 7 ÷ 15 ≈ 46.7%; the other 8 days are non-value-adding time whose waiting and other waste should be investigated. If the stem asked only “how far behind are we”, a burndown or burnup chart containing a planned or ideal reference line would be enough.
- Question 71
A manufacturer's internal management system project has passed acceptance and is about to be handed over to the company's operations and maintenance department. What is the most important thing the project manager should do during the handoff?
Show answer and explanation
Correct answer: D
A manufacturer's internal management system has passed acceptance and is about to be handed to the operations and maintenance department. The question asks what the project manager should do most in the handoff.
Handoff of the final result is transferring the product, service or result to another team, which operates, maintains and supports it through its life cycle. The project manager must ensure the handoff content is complete and confirm that the operations team truly has the knowledge it needs; only then is the handoff in place. The standard for handoff is that the receiving party can take it. The answer is D.
Why the other options are wrong
- A. Handing over all the documents at once, without checking whether the receiving party understands them and can use them, does not complete the handoff.
- B. Disbanding the team on the day of handoff means the knowledge in the team has not been passed on and nobody can answer the receiving party's questions. Later operations problems should not automatically be treated as a new project; first route them through the applicable operations, warranty, or governance mechanism, with a separately authorized project used when warranted.
- C. A project is temporary work. After it ends the team disbands and operations belongs to the operations team, so the project team should not take on day-to-day operations long term.
Key takeaway The standard for handoff is that the receiving party can really take it: complete content, and an operations team with the knowledge it needs.
Variation If the stem asked “users cannot use the product after acceptance”, first check whether the knowledge transfer was done, and use end-user training. If it said “the operations team is not ready”, tell the sponsor and replan, and do not force the handoff.
- Question 72
A company hires a project manager for an innovative product project, with a team made up of internally assigned core staff and external experts. During execution, an industry expert assigned from a functional department resigns for personal reasons, and his departure will slow the project. What should the project manager do to prevent the departure from delaying the schedule?
Show answer and explanation
Correct answer: D
On an innovative product project, the team consists of internally assigned core staff and external experts. During execution, an industry expert assigned from a functional department resigns and his departure will slow the project. The question asks what to do to prevent a schedule delay, and the core is filling the resource gap.
To prevent a schedule delay, the gap has to be filled, that is, the resource has to be acquired again. This expert was assigned from a functional department, so filling the gap depends on negotiation: discuss with the functional manager and ask him to provide or recommend a person of comparable caliber (for an external resource, go through the procurement department or the supplier), adding an expert of equal level. The answer is D.
Why the other options are wrong
- A. Crashing compresses the schedule, making up for the loss with more effort from others, but what is missing is an expert whom others cannot necessarily replace, and it adds cost and risk.
- B. Adding people means first negotiating with the party that provides the resource, and this expert came from a functional department. Pushing a problem you should first tackle yourself to the sponsor is slow and passive; the sponsor needs to step in only when the matter exceeds the project manager's authority.
- C. Cutting lower-priority features reduces scope and does not add a resource, nor does it guarantee that the expert's departure will have no effect on the schedule. It also needs CCB approval, which takes time.
Key takeaway After a key person leaves, fill the resource gap first by negotiating with the functional manager, and only then consider crashing or cutting scope.
Variation If the expert had been hired externally under a contract, go to the procurement department or the original supplier to replace him; if nobody of the same level exists inside the organization, evaluate training existing members or external recruiting.
- Question 73
A project manager is responsible for a multi-year customer management system project. During planning, the sponsor stresses that the project must keep delivering usable value along the way, so that customers can use part of the functionality before the whole system is finished, while also making sure the final product is a complete system. How should the project manager design the delivery approach?
Show answer and explanation
Correct answer: D
A multi-year customer management system. The sponsor requires continuous delivery of usable value along the way, with customers using some functions early, and a final product that is one complete system. How should delivery be designed?
PMBOK 8: the incremental approach delivers the final product in small, usable segments (increments), where the increments each provide value and build on one another until the complete product is delivered. Dividing the system into subsets by business function and delivering them one by one lets stakeholders use value early and ensures the parts finally assemble into a complete system. The answer is D.
Why the other options are wrong
- A. Regular reports and live demonstrations are only communication. They do not say how the product is delivered in batches or establish a mechanism for customers to use results early, so the required delivery model has not been established.
- B. Demonstrations can show completed features, but a demonstration is not a delivery. Delivering everything at once after all features are complete means customers cannot use anything until the end, which fails the requirement of continuously delivering usable value.
- C. Splitting into several independent small products breaks the links between the parts and cannot guarantee that a complete system results in the end.
Key takeaway When you need early value and a complete product, use incremental delivery: each subset is one component of the final product.
Variation If the subsets were independent of one another and needed no integration, splitting into independently delivered products would also work; this question stresses “one complete system,” so it does not.
Reference Predictive and Adaptive Approaches and the Stacey Matrix · Lesson 2: Iteration vs. Increment vs. Adaptive, and the Stacey Matrix
- Question 74
A home-appliance company has repeatedly tried to launch new products under its own brand. Each time it first invested heavily in development and promotion, and the market response was poor. The company can no longer afford another failure. How should the project manager approach new-product projects from now on?
Show answer and explanation
Correct answer: C
A home-appliance company has repeatedly launched new products, each time investing heavily in development and promotion first, with a poor market response, and it cannot afford another failure. The question asks how new-product projects should be run from now on, which means a way to lower the cost of trial and error.
Pick out two signals: “invest heavily first” and “cannot afford another failure”. The root of the problem is betting a large investment on an unvalidated product. A minimum viable product (MVP) defines the scope of the first release by identifying the fewest features that would deliver value. It needs little investment and gets market feedback early, so you can test with a small outlay whether the product is accepted and then decide whether to commit more. This is the way to lower the cost of trial and error on innovative products. The answer is C.
Why the other options are wrong
- A. A kanban board makes progress transparent and keeps stakeholders informed, but it does not reduce the chance that the market rejects the product and does not reduce the up-front investment.
- B. Contingency reserve addresses identified risks. The company already struggles with excessive investment, so adding reserve only adds to the burden and does not resolve the uncertainty about product direction.
- D. Reusing a platform for derivative products may lower development cost, but the stem does not say the products share a reusable platform, and this approach does nothing about the unvalidated market acceptance.
Key takeaway When the cost of trial and error on a new product is high, build an MVP first: validate the value with a small investment and then decide whether to commit more.
Variation If the stem were changed to say that a competitor has already launched a similar product and the company must capture the market quickly, the answer would still be to release an MVP early. If it said customer acceptance is uncertain, you would use an MVP to collect feedback.
- Question 75
A member joins a mobile app development project, having never taken part in any of the company's projects. The project manager suggests that the member first look through the project files of the company's completed projects to learn past practice. Which of the following is being used?
Show answer and explanation
Correct answer: D
A new member joins, and you must decide which kind of influencing factor the files of completed projects belong to.
The project files, lessons learned and historical information of earlier projects are all organizational process assets, knowledge the organization has kept, which the team can consult and borrow from and to which it can add new experience from this project in the organizational knowledge repository. The stem has the new member look through the files of finished projects, so what is used is a “record,” not a “system” or a “facility.” The answer is D.
Why the other options are wrong
- A. Infrastructure means physical conditions such as facilities and equipment and is an internal enterprise environmental factor. It has nothing to do with project files.
- B. The project management information system means tools such as scheduling software and configuration management systems, which are enterprise environmental factors. What is being used here is the content of files, not a tool.
- C. Enterprise environmental factors are conditions the project team cannot directly control, such as regulations, organizational structure and systems deployed company-wide. The files of earlier projects are the organization's own accumulation that the team can consult and add new experience to, so they do not belong here. This is the most common confusion.
Key takeaway The files, lessons learned and historical information of completed projects are organizational process assets; tool systems and facilities are enterprise environmental factors.
Variation If the project manager had the new member “use the company's standard defect management system to enter defects,” the member would be using the project management information system, an enterprise environmental factor; if the member were to “look up earlier projects' defect records in the system,” the member would be looking at repository content, an organizational process asset.
- Question 76
An engineering team is evaluating whether to develop a feature itself or buy it from an outside supplier. What is the technique they are using called?
Show answer and explanation
Correct answer: D
An engineering team is evaluating whether to develop a feature itself or buy it from an outside supplier, and the question asks what the technique used in this evaluation is called.
PMBOK 8 describes make-or-buy analysis as the decision-making process of gathering and organizing data about product requirements and analyzing them against available alternatives, including the purchase or internal manufacture of the product. It results in a make-or-buy decision as to whether particular work can be best accomplished by the project team or if it should be purchased from outside sources. Appendix X4 adds that the analysis may use payback period, return on investment, internal rate of return, discounted cash flow, net present value, cost-benefit analysis or other techniques. The team is evaluating exactly whether to do the work itself or buy it, so the answer is D.
Why the other options are wrong
- A. Expert judgment means asking people with specialized knowledge for their opinion. It is a general supporting technique and not one built for comparing internal work with outside purchase.
- B. What-if scenario analysis is a general technique for assessing how different scenarios affect project objectives. It could support a comparison of alternatives, but it is not the specific named technique for making a make-or-buy decision.
- C. Rolling wave planning progressively elaborates later planning as the project advances. It is not an analysis for comparing making with buying.
Key takeaway To decide whether to do the work yourself or buy it, use make-or-buy analysis, often together with financial measures such as cost-benefit analysis and net present value.
Variation If the scenario were “compare several suppliers to find the most suitable one”, that would be source selection analysis, not make-or-buy analysis.
Reference Make-or-Buy Analysis and Procurement Planning · Lesson 1: Plan Sourcing Strategy and Make-or-Buy Analysis
- Question 77
A major customer of a software vendor keeps asking: exactly which day will the new version be usable? The lack of a clear answer makes the customer more and more uneasy. What should the agile practitioner do to put the customer's mind at rest?
Show answer and explanation
Correct answer: D
A major customer of a software vendor keeps asking exactly which day the new version will be usable, and the absence of a clear answer unsettles the customer. The question asks how to ease the customer's concern.
What the customer wants is timing. A release plan provides a high-level summary timeline for the release, with the expected release window of each version and the iterations it contains, and among these documents it responds best to the customer's concern about time; it should be updated continuously as new information arrives and gives an expected window, not a commitment to an exact date. Building it together with stakeholders lets the customer take part in and accept the timeline, and the unease falls. The customer cares about “when can we use it”, and a document with no timeline or iteration arrangement cannot answer that, let alone ease the concern. The answer is D.
Why the other options are wrong
- A. Requiring all user stories to be written in advance and fixed to specific iterations creates unnecessary up-front work and false precision, and having every story written still would not give a reliable launch time. The customer cares about release timing, so first give an expected release window through a release plan that is updated continuously.
- B. A vision statement sums up goals and value and contains no schedule.
- C. A product strategy document explains direction and goals and likewise has no specific release timing.
Key takeaway When a customer wants to know when it will launch, build the release plan together with stakeholders.
Variation If the customer wanted to know roughly where the product is heading in two years, the answer would be the product roadmap; if they wanted to know what is being done next week, it would be the iteration plan.
- Question 78
A data-center relocation project at PMLyceum has six activities (durations in days) and starts on Day 1: A takes 3 days and has no predecessor; B takes 5 days, predecessor A; C takes 4 days, predecessor A; D takes 6 days, predecessor B; E takes 2 days, predecessor C; F takes 4 days, predecessors D and E. Using the convention EF = ES + DU − 1, what are the total float and the free float of Activity E?
Show answer and explanation
Correct answer: D
The project starts on Day 1, and the stem fixes EF = ES + DU − 1. You must work through the forward and backward passes in full and then find total float and free float separately.
Do the forward pass, then the backward pass. E's total float is LF minus EF. Its free float is the early start of its successor F, minus E's early finish, minus 1. E and C share float on the same path, but E's successor F has to wait for D on the critical path. So both the total float and the free float of E are 5 days. The answer is D.
- Forward pass: A Days 1-3; B Days 4-8; C Days 4-7; D Days 9-14; E has ES = 7 + 1 = 8 and EF = 8 + 2 − 1 = 9; F takes the larger EF of D and E, 14, so ES = 15 and EF = 18
- Backward pass: F has LF = 18 and LS = 15; E has LF = 15 − 1 = 14 and LS = 14 − 2 + 1 = 13
- Total float of E = LF − EF = 14 − 9 = 5, which also equals LS − ES = 13 − 8 = 5
- Free float of E = ES of F − EF of E − 1 = 15 − 9 − 1 = 5
- Check: A-B-D-F = 18 days and A-C-E-F = 3 + 4 + 2 + 4 = 13 days, a difference of 5 days, consistent with the total float
Why the other options are wrong
- A. This takes C's free float of 0 as E's. C's successor is E, so any move by C changes E's early start, and C's free float is 0. E's successor is F, whose early start is Day 15, so E's free float is 5.
- B. This mixes two conventions in one question: ES is taken as 8 using +1, but EF is taken as ES + DU = 10, so 14 − 10 = 4 and 15 − 10 − 1 = 4. Both numbers come out 1 too small.
- C. The total float is wrongly calculated as LF − ES = 14 − 8 = 6, which leaves out the duration. Total float is LF − EF or LS − ES.
Key takeaway Take the maximum on the forward pass and the minimum on the backward pass; TF = LF − EF = LS − ES, and FF looks only at the early start of the successors.
Variation If E's duration were changed to 4 days, E would run Days 8-11 with LF = 14, total float = 14 − 11 = 3, and free float = 15 − 11 − 1 = 3.
- Question 79
A member missed a progress review meeting without requesting leave and was given a penalty under the ground rules. He and several other members say that this was the first time they had seen this rule and that they do not accept the penalty. What could the project manager have done to avoid this situation?
Show answer and explanation
Correct answer: D
A member missed a progress review meeting without leave and was penalized under the ground rules. He and other members say this was the first time they had seen the rule and refuse the penalty. The question asks what the project manager could “have done” to avoid this, so the key is a preventive measure.
When ground rules are developed jointly by the team, members know and accept their content, and handling a breach by the rules afterward is not likely to cause disputes. The heart of the stem is not that the rule is wrong but that members did not know it and did not take part. Making sure beforehand that the team charter is developed with the participation of all members would have avoided this. The answer is D.
Why the other options are wrong
- A. Requiring everyone to express support for all decisions is unrealistic and is not the source of the dispute; the dispute arises from how the rule was made and how well it was known.
- B. The project charter is a high-level document that authorizes the project and appoints the project manager. It does not set members' day-to-day behavioral norms, so having people sign it would not solve the team-rules problem.
- C. Leadership style helps guide people, but to “avoid” this kind of dispute you need members to know and accept the rules beforehand, and charisma cannot replace participation.
Key takeaway The team charter works best when the team develops it or takes part in it; only when members know and accept the rules in advance can they be applied fairly afterward.
Variation If the rule exists and members accept it, but someone still breaks it, the order is a private conversation and restating the rule; if the rule does not fit, the team updates it; only if repeated reminders fail do you go to the formal procedure.
- Question 80
The project manager uses an AI tool to generate a first draft of the weekly project report, to send to the sponsor. Before sending it, what should be considered FIRST?
Show answer and explanation
Correct answer: D
The project manager uses an AI tool to generate a first draft of the weekly project report and plans to send it to the sponsor. A report to the sponsor is formal communication, and the project manager is responsible for its accuracy.
PMBOK 8: information obtained from AI should be checked and validated, because it may be biased, incorrect or irrelevant. Report generation is listed by PMBOK 8 as an automation example, but content sent to the sponsor still has to be reviewed by the project professional to ensure accuracy and completeness, and a human must ultimately take responsibility. So before sending, a person should review the accuracy. The answer is D.
Why the other options are wrong
- A. Sending it directly hands possibly wrong content to the sponsor. Responsibility still rests with the project manager, and the time saved is paid for with a reputational risk.
- B. Dropping human proofreading removes the reliability check before release. Even when AI is used, a human must be clearly accountable for the report's content.
- C. Sharing an unreviewed draft with the whole team can spread erroneous information. D more directly establishes a human accuracy review before release.
Key takeaway Material generated by AI should be reviewed by a person for accuracy and completeness before it is sent.
Variation If the weekly report is a low-complexity, templated standard report, it still needs a spot check, but the share of automation can be higher.
Reference Artificial Intelligence in Project Management · Lesson 3: Responsible Use of AI and the Eight Ethical Concerns
- Question 81
A data-center equipment-room renovation project is in the implementation phase. The only cable supplier announces that it is going out of business and can no longer deliver the cables stipulated in the contract, so the installation schedule may be affected. What should the project manager do FIRST?
Show answer and explanation
Correct answer: B
A data-center equipment-room renovation project is in implementation. The only cable supplier announces it is going out of business and cannot deliver the cables stipulated in the contract, so the installation schedule may be affected. The question asks what the project manager should do first.
First distinguish an issue from a risk. “Going out of business” and “can no longer deliver” describe facts that have already happened, so this is an issue; the “may” in “schedule may be affected” is only the consequence of that issue and does not change the fact that the closure has happened. A risk is an uncertain event that has not yet happened, while an issue has happened and needs handling. What has happened goes in the issue log, and action is taken right away to minimize the effect on the schedule, such as looking for a substitute supplier. So the first step is to update the issue log and act. The answer is B.
Why the other options are wrong
- A. How long the schedule will slip has not been assessed, so writing the delay straight into the schedule baseline treats an unassessed impact as settled. A baseline change must also go through the Assess and Implement Changes process, and the project manager cannot change it directly.
- C. A potential installation delay can indeed be logged as a consequence risk and analyzed afterward, but what must be dealt with first is the real problem that the supplier has gone out of business and cannot deliver. C looks only at the possible schedule consequence and does not record and drive resolution of the current issue, so it is weaker than B.
- D. When you can act within your own authority, handle and record it proactively instead of passing it up at the first sign of trouble; “approving the delay” is also not what needs solving now, since the first job is to find a way to reduce the impact.
Key takeaway What has already happened is an issue: record it in the issue log and act. The risk register holds only uncertain events that have not happened; follow-on effects of an event that has happened can be managed separately as risks if they have not yet occurred.
Variation If the stem were changed to “the supplier is short of cash and might go out of business”, nothing has happened yet, so it is a risk and should be recorded in the risk register and assessed.
- Question 82
A manufacturer has taken on more and more software and internet projects in recent years. The company realizes that its former predictive management can no longer cope with a fast-changing market and plans to transition to an adaptive approach, and it asks for your opinion. Which of the following conditions MOST supports the transition?
Show answer and explanation
Correct answer: C
A manufacturer has more software and internet projects, and its former predictive management cannot cope with a fast-changing market, so it is considering a move to an adaptive approach. Which condition most supports the move? Look at organizational culture and team factors.
PMBOK 8 lists the organization’s culture and needs among the factors that influence the choice of development approach. Adaptive environments typically need empowerment, self-organization, openness, and fast decisions, so mutual trust, a fair environment, members speaking freely, and shared ownership of results favor the transition most. The other three (a rigid hierarchy, fixed projects, deference to seniority) reflect a hierarchical culture and stable projects, which suit a predictive approach better. The answer is C.
Why the other options are wrong
- A. A clear hierarchy with everything following a prescribed process leaves the team no room for autonomous decisions, which conflicts with the empowerment and fast feedback an adaptive approach requires.
- B. Fixed projects that rarely change are exactly the conditions under which a predictive approach fits best, so they are no reason to move to an adaptive one.
- D. Letting seniority determine who has a say keeps newcomers from voicing ideas and undermines the open communication and equal participation that self-organizing teams need.
Key takeaway For a transition to adaptive, look at culture, team, and project characteristics: trust, open expression, and team autonomy are the key conditions.
Variation If the question asked “which condition shows the organization is NOT ready to transition,” the answer would reverse, picking the rigid hierarchy or fixed-project options.
Reference Predictive and Adaptive Approaches and the Stacey Matrix · Lesson 3: How to Choose a Development Approach, and Delivery Cadences
- Question 83
An auto parts manufacturer has more than twenty years of experience with traditional projects. Because of market changes, it will use an adaptive approach for the first time on an upcoming software project. The sponsor asks you whether the approach should first be reworked to fit the company’s situation. Under common exam practice, what should you say?
Show answer and explanation
Correct answer: A
The company has twenty years of traditional project experience and will use an adaptive approach for the first time on a software project. The sponsor asks whether the approach should first be reworked to the company’s situation. Judge this in light of the continuous improvement requirement of tailoring.
Tailoring is not a one-time exercise. For a company adopting an adaptive approach for the first time, first let the team practice the standard way and become familiar with it, then use retrospectives and review points to find the real problems and adjust on evidence. The fourth step of tailoring in PMBOK 8 is “implement ongoing improvement,” using retrospectives and similar means to inspect and adapt the process, development approach, and delivery frequency. “Use it first the standard way with few changes” is common exam practice (you still analyze the environment first and make an appropriate initial tailoring). The tempting options in this type of question are “rework first, then use” and “change it at will”; both skip the order of practice first, then inspect. The answer is A.
Why the other options are wrong
- B. Reworking too much at once on first use, when the team is not yet familiar with the approach, makes it hard to tell whether a problem comes from the approach itself or from the rework.
- C. Changing it at will by preference leaves the team with no stable baseline and no way to tell which practices work.
- D. Tailoring is continuous and should use retrospectives and review points to keep checking. Waiting until closing to evaluate is too late.
Key takeaway In common exam practice, when adopting a new approach for the first time, first practice the standard way to get familiar, then keep adjusting on real problems (PMBOK 8 requires an appropriate initial tailoring first).
Variation If the team already had mature experience with the approach, it could be adjusted to the project’s characteristics already in Step 3, tailor for the project. On first use, large changes are not advisable.
- Question 84
A candidate is drawing up a study plan and wants to practice under the conditions of the actual exam. He holds four beliefs about the exam format. Which one is consistent with the exam content outline?
Show answer and explanation
Correct answer: C
A candidate is making a study plan and wants to practice the way the exam is actually laid out. Of four beliefs about the exam format, which one is consistent with the exam content outline?
The exam content outline states that predictive, adaptive/agile and hybrid approaches appear within the three domains rather than in isolation within one domain; about 40% of the questions use a predictive approach, and the remaining 60% or so are spread across adaptive/agile and hybrid approaches; and across the whole exam all questions are presented in random order. The three domain weightings are People 33%, Process 41% and Business Environment 26%. Only C is consistent with this. The answer is C.
Why the other options are wrong
- A. Questions are presented in random order and are not sorted by domain. In practice you also have to get used to switching between domains and approaches at any time.
- B. Predictive and adaptive questions are spread across all three domains and are not concentrated in any one of them.
- D. The weightings are Process 41%, People 33% and Business Environment 26%. Process, not People, has the highest weighting.
Key takeaway The exam is presented in random order; predictive is about 40% and adaptive plus hybrid about 60%; Process 41%, People 33%, Business Environment 26%.
Variation If the question asked which domain has the lowest weighting, the answer would be Business Environment, at 26%.
Reference Judgment Rules for Situational Questions · Lesson 1: Exam Format and Reading the Question Wording
- Question 85
After the project enters the execution stage, a key stakeholder tells the project manager that what the team is delivering is not the product he wants. What should the project manager do FIRST?
Show answer and explanation
Correct answer: A
After the project enters the execution stage, a key stakeholder says the team is delivering a product that is not what he wants. The question asks what the project manager should do first.
“Not what I wanted” has two possible readings: the need has really changed, or the two sides understand the same sentence of the vision differently. Until that is clear, any action lacks a basis. So first talk with him and check whether the two sides’ understanding of the vision and expectations has drifted, find the point of disagreement, and then decide whether to clarify, update the vision or go through change. Verifying first also gives whatever decision follows (clarify, update the vision or go through change) a basis, rather than reacting on one remark from the other side. The answer is A.
Why the other options are wrong
- B. Changing the charter objectives to accommodate him without verification has no basis, and changing the charter requires the sponsor’s approval. It may make the vision get more muddled with each change.
- C. Stopping work is costly, and asking the other side to confirm all requirements in writing cannot resolve a difference in understanding.
- D. Showing progress data can only prove that work is following the plan. It cannot answer whether it is the right thing being built.
Key takeaway When someone says “you built the wrong thing”, first check whether their understanding of the vision has drifted.
Variation If verification shows the need has indeed changed, handle it through the change mechanism of the chosen development approach (a predictive project assesses it through the formal change process; an adaptive project normally adds it to the backlog and assesses the impact). If it is a difference in understanding, use meetings and facilitation to reach agreement again and align the wording that everyone uses.
- Question 86
A wind farm construction project requires knowledge transfer to follow the organization's standardized process, but the project manager finds this hard to carry out: team members and stakeholders are spread across construction sites, the head office and remote stations, and some members cannot reliably access the electronic shared files. What should the project manager do?
Show answer and explanation
Correct answer: B
The wind farm project has to do knowledge transfer by the standard process, but members are spread over three kinds of location and some cannot reach the electronic shared files. The project manager has to decide what to do.
The problem has only just surfaced, and it is not yet clear which channels members at each location can actually use or what resources they have. So first study the actual environment and existing resources, then decide which knowledge transfer method to use. This follows the principle of analyzing before acting. The answer is B.
Why the other options are wrong
- A. Changing the process is only one possible solution. Proposing a change before analyzing the environment skips a step, and a change may not be needed at all.
- C. Stressing importance does not solve objective difficulties such as restricted access and dispersed staff. Members are not failing to value it; they are unable to do it.
- D. Sending everything by email chooses the channel before the environment has been verified. It may not suit a dispersed team and does not guarantee the two-way interaction that knowledge transfer needs; analyze the actual environment and available resources first and then choose a suitable method.
Key takeaway When knowledge transfer runs into difficulty, first study the environment and available resources and then choose the method; do not apply one approach directly.
Variation If the stem said all the members were in the same building and could meet face to face, you would choose face-to-face meetings and pairing. If it said they were spread across several time zones, you would choose regular virtual meetings plus shared documents, and make sure the interaction is two-way.
- Question 87
At a retrospective, a project manager reviews the work done against the PMBOK 8 mapping table. Which of the following belongs to the Executing Focus Area?
Show answer and explanation
Correct answer: B
The project manager reviews the work against the PMBOK 8 mapping table and must decide which item belongs to the Executing Focus Area.
According to the PMBOK 8 mapping table, Manage Communications belongs to the Stakeholders performance domain and falls in the Executing Focus Area. Of the other three, Estimate Costs is in the Planning Focus Area, Validate Scope is in the Monitoring and Controlling Focus Area, and Identify Stakeholders is in the Initiating Focus Area. To judge which Focus Area something belongs to, look at the action itself: is it initiating, planning, executing, or checking? It helps to memorize the mapping table by performance domain: the Stakeholders performance domain has processes in four Focus Areas, Initiating, Planning, Executing, and Monitoring and Controlling. The answer is B.
Why the other options are wrong
- A. Estimate Costs belongs to the Planning Focus Area of the Finance performance domain; it is the estimating work done when planning finances.
- C. Validate Scope belongs to the Monitoring and Controlling Focus Area of the Scope performance domain; it is the formal acceptance of completed deliverables.
- D. Identify Stakeholders belongs to the Initiating Focus Area of the Stakeholders performance domain; the process is performed periodically throughout the project as needed.
Key takeaway Manage Communications and Manage Stakeholder Engagement are in Executing, Identify Stakeholders is in Initiating, estimating is in Planning, and Validate Scope is in Monitoring and Controlling.
Variation If the question asked which Focus Area Monitor Communications belongs to, the answer would be Monitoring and Controlling; for Plan Communications Management, the answer would be Planning.
- Question 88
A retail system overhaul project has run into a problem: the work of the inventory synchronization group and the member data migration group partly overlaps, and it is unclear who is responsible for delivering that part, which is already affecting the project. The resource management plan lists each group's roles and responsibilities. What should the project manager do next?
Show answer and explanation
Correct answer: A
The work of the inventory synchronization group and the member data migration group partly overlaps, nobody knows who should deliver that part, and the project is already affected. The resource management plan lists each group's roles and responsibilities. The question is the project manager's next step, which centers on dividing responsibility between teams.
Who is responsible for what is written under “roles and responsibilities” in the resource management plan, which covers role, authority, responsibility and competence. When the two groups' responsibilities overlap, the project manager should consult the plan first. If it is clear, use it to clarify and coordinate execution; if the resource management plan must change, assess and obtain authorization for the change through the applicable change process before updating the plan, notifying the relevant parties, and implementing it. The answer is A.
Why the other options are wrong
- B. The scope statement says what work is to be done and what is to be delivered. It does not say which group is responsible for which part, so it is the wrong basis for reorganizing teams.
- C. The WBS breaks scope into work packages and shows what work exists, but it also does not say which group takes it on. It cannot say who owns the overlapping part.
- D. The overview in the project management plan is not content designed for resource assignment. Resource arrangements are in its subsidiary plan, the resource management plan, which is more specific.
Key takeaway When responsibilities overlap between teams and it is unclear who is responsible, go back to the roles and responsibilities in the resource management plan, not the scope documents.
Variation If the question asked which tool clearly shows how each activity relates to people, the answer would become the responsibility assignment matrix. If it asked whom a new member reports to, the answer would be the project organization chart.
- Question 89
A property management company's repair-request app has been developed and the project manager is ready to deliver it. Hearing that the customer's manager is on a business trip, the project manager hands the program package to the customer's liaison specialist and asks for no written confirmation. On the agreed payment date the customer does not pay, saying it never received the program and has not accepted it. What should the project manager have done beforehand to avoid this problem?
Show answer and explanation
Correct answer: D
A repair-request app is finished. While the customer's manager is away, the project manager hands the package to a liaison specialist with no written confirmation. On the payment date, the customer says it never received or accepted the program.
Deliverables should be accepted by a customer representative with acceptance authority, against the acceptance criteria, confirmed in the formal way the contract or governance arrangements call for; among the ways listed here, a signature is the best protection against dispute. Had a customer representative with acceptance authority signed to confirm acceptance in advance, the project manager would hold proof of the customer's acceptance, and the customer could not deny it later. Note also that the signer must be someone with acceptance authority: a liaison specialist receiving the package is not acceptance, and only the signature of a customer representative with acceptance authority or that person's formally authorized delegate counts. The answer is D.
Why the other options are wrong
- A. Whether the payment date is reasonable has nothing to do with the customer denying receipt. The problem is the lack of proof of acceptance.
- B. The stem shows no sign of scope excess or gap, so tighter monitoring of product scope does not address an acceptance dispute.
- C. The problem is that the project manager did not obtain a signature, not an authority issue that needs escalation to the sponsor.
Key takeaway Acceptance needs formal confirmation: at delivery, a customer representative with acceptance authority inspects against the acceptance criteria and confirms in the agreed formal way (here, a signature). A liaison specialist receiving the package is no substitute.
Variation If the customer refuses to accept, record the reasons and deal with the defects or the dispute; if the approved scope, a baseline or another controlled item needs to change, submit a change request as required. If the customer merely agreed verbally, still obtain the agreed formal confirmation afterward.
- Question 90
An agile project has entered its second iteration. The product owner finds that after the first iteration about 30 story points within the scope of this release are still unfinished, while the team completed only 12 story points in the first iteration, and only 2 iterations remain before the release date, so at this velocity only about 24 more story points can be completed and the work cannot be finished before the release date. As an agile practitioner, how should you handle this?
Show answer and explanation
Correct answer: B
An agile project is in its second iteration. After the first iteration, about 30 story points within the scope of this release remain unfinished, but the team completed only 12 points in the first iteration, so at this velocity the work cannot be finished before the release date. How should this be handled?
With time limited and velocity known, not all of the scope can be completed, so trade-offs are necessary. The basis for the trade-off is value: together with the product owner, ask stakeholders to meet and agree on the ordering of the product backlog by value, so that the limited output goes to the most valuable items. This neither oversteps nor avoids the problem. The answer is B.
- Velocity is 12 points per iteration and the scope is about 30 points: 30 ÷ 12 = 2.5, so about 3 iterations are needed.
- Deliverable capacity = number of iterations remaining before release × historical velocity. 2 × 12 = 24 points, which is less than the 30-point scope, so trade-offs are required.
- Order by value, use the capacity on the highest-value items, and move the remaining items out of this release or negotiate them separately.
Why the other options are wrong
- A. The items that can be finished fastest are not necessarily the most valuable. Doing the easy ones first pushes high-value content later.
- C. Adding people does not raise velocity right away, and the ramp-up period can slow output in the short term. Changing resources also needs discussion with the sponsor and the team, and there is no need to ask for more people before trying to focus on value ordering.
- D. Asking for a delay straight away is the least suitable first reaction. First focus on value within the scope, rather than giving up the deadline first.
Key takeaway When velocity cannot keep up with the volume of the backlog, first agree with stakeholders on the value ordering, rather than adding people or delaying.
Variation Only if stakeholders agree that all 30 points are must-haves does it make sense to negotiate a delay or more iterations; if the stem said the team had spare capacity, no trade-off would be needed and items would go in by their order.
- Question 91
A city bus travel app project is in the executing phase. Two key stakeholders disagree about the project scope: the marketing director insists on adding a coupon feature, which would expand the scope, while the operations director wants to keep the current arrangement unchanged. Both have explained their positions and reasons to the project manager, and the positions are mutually exclusive. What is the most appropriate next step for the project manager?
Show answer and explanation
Correct answer: B
A bus travel app project is in the executing phase. The marketing director insists on adding a coupon feature, and the operations director wants to keep the current arrangement. Both have explained their positions to the project manager, and the positions are mutually exclusive. You must decide the most appropriate next step.
Conflict between stakeholders should be handled early, directly and collaboratively. The two positions and reasons are already clear, so the project manager brings the two together in a meeting, acts as facilitator, and drives the dialogue toward agreement. This is collaborate/problem-solve: it incorporates both viewpoints and typically leads to consensus and commitment. Adding the coupon feature is a scope change, so once they agree it must go through the change control procedure rather than being settled outright in the meeting. Both are key stakeholders, which makes face-to-face facilitation all the more necessary. The answer is B.
Why the other options are wrong
- A. Escalation is a last resort; the project manager should first take the initiative to mediate. Escalating at the first sign of disagreement makes it look as if the project manager cannot resolve problems.
- C. Both positions are already clear, so separate conversations produce no new information and do not build consensus. Deciding the scope on his own bypasses change control and amounts to imposing a decision, which invites hostility.
- D. Leaving the two to arrange it themselves removes the project manager from the process. The discussion can drift or stall, and it does not show the project manager acting as a facilitator.
Key takeaway When stakeholders' views conflict, the project manager steps in and brings both sides together to solve the problem collaboratively, rather than hurrying to escalate or standing aside.
Variation If their disagreement involved cross-department resources and the project manager has no authority to decide, you would ask the sponsor to set priorities only after facilitation fails.
- Question 92
A manufacturing company is moving several of its projects to an agile approach. After the transition, senior leaders still ask for the information that used to come from the old reports and dashboards, but much of it no longer applies. What should the project manager do?
Show answer and explanation
Correct answer: B
A company moves several projects to agile. Afterward, senior leaders still ask for the information in the old reports and dashboards, much of which no longer applies. The question asks what the project manager should do.
Senior leaders ask for the old information because they do not yet understand what the transition changes. The project manager should help them understand how the move to agile affects the usefulness of certain reports and metrics, which ones still mean something and which no longer apply, and show progress through information radiators, burndown charts and the like. This respects management's information needs and also wins their acceptance of the new way of reporting. The answer is B.
Why the other options are wrong
- A. This overgeneralizes. Agile does have reports and dashboards, only in different forms and content. Flatly denying them will only make senior leaders more dissatisfied.
- C. A self-managing team does not mean no reporting. Agile also requires transparent progress for stakeholders, so this claim is wrong and invites resistance.
- D. Pushing the responsibility to learn onto senior leaders does not help them understand, communicates poorly, and is not the proactive approach expected of a project manager.
Key takeaway After a move to agile, reporting content changes. The project manager helps management understand the change instead of rejecting or avoiding it.
Variation If executives worry that the team is “not documenting and not reporting progress”, explain agile basics and show progress through metrics such as burndown charts and velocity and through public information radiators. If the question is whether to write one more weekly report, first let them look for themselves.
- Question 93Select 2
Which TWO of the following are typical responsibilities of a project management office (PMO)? (Multiple response: choose 2.)
Show answer and explanation
Correct answer: AC
You must pick the two typical responsibilities of a PMO.
The role of a PMO is to unify the governance practices of individual projects and to facilitate the sharing of resources, methodologies, tools and techniques across projects. Establishing organization-wide project governance standards and processes (A) is therefore among its responsibilities. Enabling project teams through templates, training, coaching and lessons learned, and accumulating organizational process assets (C), is also part of the value it provides. Options B and D either overstep or describe the responsibilities too narrowly. The answers are A and C.
Why the other options are wrong
- B. Doing a project manager's specific work would turn the PMO into the executor of the project. A PMO provides standards, support and oversight, and the project's tasks remain the responsibility of the project manager and the team. Some PMOs may manage projects directly, but that does not mean doing the project manager's specific work tasks for the project manager. A PMO's duties and authority should be tailored to the organization's needs and governance arrangements.
- D. Collecting and storing documents is only a small part of a PMO's work. Saying it is “only” responsible for this rules out its governance, sharing and enablement functions, and it is not a typical responsibility.
Key takeaway A PMO standardizes governance, facilitates sharing and enables teams. It does not do the project manager's work and is not just a keeper of documents. For multiple-response questions, judge each option separately.
Variation If B were changed to “providing project management templates, training and coaching”, it would be correct. If the question asked how a PMO differs from a project manager, the answer is that the PMO looks at the organization as a whole and standardizes governance, while the project manager is responsible for the results of a single project.
- Question 94
After a product demonstration, the customer says the user stories the team wrote are full of internal jargon and do not reflect their real expectations for the product. What should the project manager do next?
Show answer and explanation
Correct answer: C
After a product demonstration, the customer says the team's user stories are full of internal jargon and do not reflect their real expectations of the product. What should the project manager do next?
The point of a user story is to express a requirement briefly from the user's perspective and clarify details through conversation. A story that has drifted from the customer's expectations shows that there was not enough conversation, and the most direct step is to talk with the customer, learn the real expectations, and then rewrite accordingly. The order is clarify first, then rewrite. The “internal jargon” in the stem is the signal: stories should use language the customer understands and state the role, the goal and the benefit, with details filled in through conversation. The answer is C.
Why the other options are wrong
- A. Applying for approval for training first jumps to an indirect remedy before the cause is established. The problem is that the stories do not reflect the customer's expectations, not a lack of skill.
- B. The customer's complaint is too much jargon, and adding the technical vision would only take the stories further from the customer's language.
- D. A story must take the customer's perspective. Even if a senior developer rewrites it, without conversation with the customer the real expectations still cannot be confirmed.
Key takeaway When a user story does not match the customer's expectations: clarify through conversation with the customer first, then rewrite.
Variation If the scenario is that a stakeholder is unhappy with a feature in the review, the handling is the same: talk about expectations first, then rewrite the story and order it in the product backlog.
- Question 95
A project manager is responsible for three projects within a program for new home-appliance launches. After the main delivery work on the three projects is complete, he stops attending the team's routine meetings. The program manager asks him to keep attending them to stay in touch with the team. This does not match the project manager's view, because he is now responsible only for overseeing the remaining closing work. How should the project manager handle this?
Show answer and explanation
Correct answer: A
A project manager is responsible for three projects in a program for new home-appliance launches. After the main delivery work is done he stops attending the team's routine meetings. The program manager asks him to keep attending, but he believes he is now responsible only for overseeing the remaining closing work. You must decide how to handle this disagreement over roles.
The project manager and the program manager have different expectations about attending meetings, which is a disagreement over role responsibilities. The appropriate approach is for the two to communicate in person: schedule a meeting, put each side's considerations on the table, and agree after discussion on whether, and how, he will attend. This is the standard way to handle a role conflict. The answer is A.
Why the other options are wrong
- B. Deciding on his own, without discussion, to attend only some meetings is a unilateral arrangement and does not respond to the program manager's request.
- C. Unilaterally telling the program manager that he will no longer attend imposes his own view without negotiation and may intensify the disagreement.
- D. Discussing the division of work only by email is less effective than a face-to-face meeting for exchanging views fully and reaching consensus.
Key takeaway When expectations about roles differ, hold a meeting to negotiate and agree. Do not decide unilaterally.
Variation If the two cannot agree, ask the program's governance body or the sponsor to decide the division of work, and record the outcome to avoid a later dispute.
Reference The Project Manager Role · Lesson 2: The Project Manager's Power and Authority, and Other Key Roles
- Question 96Select 2
The activities, durations (in weeks) and predecessors of a system upgrade project are shown in the diagram. The project has no externally imposed finish date. Select the critical path and the shortest project duration. (Choose 2.)
Show answer and explanation
Correct answer: AD
The stem gives a network diagram with durations in weeks and no externally imposed finish date. You must select both the critical path and the shortest duration, and the two answers must correspond to the same path.
The critical path is the path with the longest sum of durations, and its length is the shortest project duration. List all three paths from start to finish and add them up. The longest is A-D-F-G at 24 weeks, so the critical path is option D and the shortest duration is option A. The answers are A and D.
- List the paths and add them: A-C-F-G = 8 + 5 + 4 + 3 = 20 weeks; A-D-F-G = 8 + 9 + 4 + 3 = 24 weeks; B-E-G = 6 + 13 + 3 = 22 weeks
- Take the maximum, 24 weeks: the critical path is A-D-F-G
- Check: the next-longest path, B-E-G, is 22 weeks, 2 weeks shorter than the critical path. It is a near-critical path; B and E each have 2 weeks of total float, while G is also on the critical path and has 0
Why the other options are wrong
- B. A-C-F-G is only 20 weeks, the shortest of the three paths. This takes the shortest path for the critical path.
- C. B-E-G is 22 weeks, a near-critical path only 2 weeks shorter than the critical path. It is easy to choose by mistake because it has few activities and one long one.
- E. 22 weeks is the length of B-E-G. This takes the length of the second-longest path as the project duration.
- F. 20 weeks is the length of the shortest path, A-C-F-G. The shortest duration is set by the longest path, not by the shortest.
Key takeaway The critical path is the longest path and the shortest duration is its length; the two answers must correspond to the same path.
Variation If Activity D were shortened to 6 weeks, A-D-F-G would become 21 weeks, B-E-G's 22 weeks would be the longest, the critical path would shift to B-E-G, and the shortest duration would be 22 weeks.
- Question 97Select 2
An energy company plans to build a subsea power transmission line linking three coastal cities and hires a contractor for the construction. The detailed design of the work will not be finished until several months after the contract is signed, but the company requires the line to be in service within 30 months. The company does not intend to terminate the contract midway or to change the agreed scope of the line. The project manager wants the price mechanism to have the company and the contractor share risk so that the risk allocation between them is balanced. When planning the sourcing strategy or procurement strategy, which TWO contracting techniques should be considered? (Choose two.)
Show answer and explanation
Correct answer: AE
At signing the detailed design and implementation details are not settled and the schedule is limited. The company does not intend to terminate midway or adjust the scope. The question asks which contracting techniques keep risk balanced between buyer and seller (these techniques are common exam terms for adaptive projects).
The stem has three conditions: the detailed design is completed several months after signing (the design and implementation details are not settled), the date for entering service is fixed, and the aim is to balance risk between buyer and seller. Among the contracting techniques commonly used on adaptive projects (“fixed-price increments” and “graduated time and materials” are common exam terms), fixed-price increments cut the work into increments, each separately priced and paid after acceptance, so as the design becomes clear the two sides re-agree increment by increment, and neither has to bear all the uncertainty at once. Graduated time and materials has the two sides share financial risk: for early delivery the seller is paid a higher hourly rate, and for late delivery the rate is reduced, so both share the consequences of savings and delays. The answers are A and E.
Why the other options are wrong
- B. A firm fixed-price contract puts all the design change risk on the seller, but the detailed design is completed several months after signing and the design and implementation details are still uncertain, so the risk allocation clearly favors the buyer and cannot achieve the balance the stem asks for.
- C. In the stem the company does not intend to terminate midway. An early cancellation option mainly gives the buyer more flexibility to end early and protects the seller through a termination fee. It does not directly correspond to phased pricing or risk sharing in the price.
- D. In the stem the company does not intend to adjust the scope. A dynamic scope option lets the buyer swap scope by priority at milestones, which addresses scope flexibility and not risk sharing in price or rates.
Key takeaway To balance risk between buyer and seller use fixed-price increments and graduated time and materials: the first prices segment by segment by increment and the second adjusts the rate by how fast delivery is made.
Variation If the stem emphasized “the buyer wants maximum flexibility and may terminate at any time”, that would point to an early cancellation option; if it emphasized “scope is adjusted by priority”, to a dynamic scope option.
- Question 98
A new-energy battery project is already in execution. Which of the following four changes should MOST prompt the project manager to go back and check whether the project vision still holds?
Show answer and explanation
Correct answer: D
The new-energy battery project is in execution. The question asks which of the four changes should most prompt the project manager to go back and check the vision.
A vision has to serve the organization’s strategy, and it describes the project’s purpose and future outcomes. When the company’s strategic direction changes, the project’s link to strategy changes with it, and the project’s purpose and success criteria may change too, so the vision needs to be looked at again. The other three are the project’s internal performance or everyday improvement and do not touch the project’s purpose. The test for whether to revisit the vision is “could the project’s purpose change?”, not “is performance good or bad”: cost, schedule and improvement suggestions are internal performance, to be handled by their own management processes. The answer is D.
Why the other options are wrong
- A. A slight overrun that has not crossed the threshold is a cost performance matter, handled through cost management.
- B. A suggested process improvement is everyday continuous improvement and does not change the project’s purpose or success criteria.
- C. Completing the stage two weeks early is a performance result and does not show whether the vision has become outdated.
Key takeaway When major changes in strategy, market, regulation or technology could invalidate the project’s purpose or intended outcomes, check the vision again.
Variation If it were changed to “pilot feedback shows the core value proposition is not accepted by the market”, the vision again has to be reassessed with stakeholders. If it were only a small cost fluctuation in one month, it does not trigger a check.
- Question 99
A project manager at a logistics company manages two agile teams at once and wants to judge which one performs better by comparing the two teams' velocities. Which approach is MOST appropriate?
Show answer and explanation
Correct answer: A
A project manager manages two agile teams and wants to compare their velocities to judge performance. The point here is to decide what velocity can be used for.
Velocity is measured in story points, and story points are a relative scale each team builds from its own reference story, so the same number of points means different things in different teams and their sizes are not comparable. Velocity therefore cannot be used to compare the performance of two teams. Its purpose is forecasting within a team. The most common management mistake is treating velocity as a performance metric: once it is used for ranking, teams lower their standards or inflate figures to protect the number, and the forecasts become distorted. The answer is A.
Why the other options are wrong
- B. A high velocity may just mean the team sizes its stories larger, not that it produces more. Rewarding on that basis has no foundation and encourages inflated reporting.
- C. Comparing regularly still assumes the velocities are comparable, and that assumption does not hold.
- D. A retrospective is where a team improves its own way of working, not where two teams are compared. Changing the meeting does not change the fact that the velocities are not comparable.
Key takeaway Velocity is mainly for forecasting and tracking trends within the same team; it cannot be used to rank different teams or appraise individuals.
Variation If the stem were changed to “require the team's velocity to be higher in every iteration than the last”, that would be wrong too, because velocity should be stable, not constantly climbing.
- Question 100
A company's project management office (PMO) supports its project managers. Several project managers need help getting some stakeholders to learn how to handle difficult situations. Which activity should the PMO use to help these stakeholders?
Show answer and explanation
Correct answer: C
A company's PMO supports its project managers and must help some stakeholders learn to handle difficult situations. The question asks which activity to use.
PMBOK 8 Appendix X2 notes that the PMO's customers include internal stakeholders such as project managers, project teams and delivery units, who rely on the PMO for practical support, timely guidance and tools. As for which activity to use, common exam practice is that to help people learn to handle specific difficult situations, the most suitable activity is coaching and mentoring aimed at their actual problems, working with them one on one. The answer is C.
Why the other options are wrong
- A. Contract negotiation is an activity for reaching agreement on contract terms. Here the stakeholders need help, and it has not reached the point of negotiating.
- B. Team performance appraisal evaluates the performance of members inside a team. Stakeholders are not necessarily all on the team, and an appraisal does not help them learn to handle difficulties.
- D. On-the-job training builds general job skills through actual work. It is less targeted at a specific difficult situation than coaching and mentoring, and stakeholders are not necessarily all internal staff.
Key takeaway To help stakeholders learn to handle specific difficult situations, coaching and mentoring is more suitable than contract negotiation or general on-the-job training.
Variation If the need were to get a group of new project managers to master the company's project templates in a uniform way, centralized training would be more suitable.
Reference Project Management Office · Lesson 2: How the PMO Supports Project Managers, and Its Relationship to Tailoring, Programs and Portfolios
- Question 101
At a lessons-learned session, a project manager summarizes the circumstances in which projects end. Which of the following statements is NOT correct?
Show answer and explanation
Correct answer: A
Note that the question asks which statement is NOT correct. Among four statements about how projects end, you must find the incorrect one. The core idea is what “end” means in the temporary nature of a project.
PMBOK 8 lists the conditions under which a project usually ends: the objectives have been achieved; a governing body, the sponsor, or the project team has determined that the objectives will not or cannot be met; resources are exhausted or no longer available; due to changes in strategy, priorities, or the external environment, the need for the project no longer exists; or the project is terminated for other reasons such as legal, regulatory, or compliance issues. So the end of a project does not require that the original objectives be achieved. Achieving them is only one way a project ends. Statement A says it “must continue until its original objectives are achieved”, which is wrong. Because the question asks for the incorrect statement, the answer is A.
Why the other options are wrong
- B. Early termination when objectives will not or cannot be met is one of the end conditions listed in PMBOK 8. The statement is correct, so it is not the answer.
- C. Funding, human, or physical resources being exhausted or no longer available is also a listed end condition. Without key resources a project may end, so the statement is correct.
- D. A project terminated because changes in strategy, priorities, or the external environment remove the need for it is a listed end condition. The statement is correct.
Key takeaway A project does not have to achieve its objectives in order to end. Early termination is also a way for a project to end.
Variation If A were changed to “a project ends once its objectives are achieved”, the statement would be correct, because achieving the objectives is the first end condition.
Reference Projects, Programs and Portfolios · Lesson 1: What Is a Project? Definition and Characteristics
- Question 102Select 2
On a project, only one engineer can do Activity M and Activity N, and both activities are scheduled for Days 4 to 6, which creates a conflict. M is on the critical path and has zero total float, while N has 5 days of total float. Which two judgments are correct? (Choose 2.)
Show answer and explanation
Correct answer: BC
Only one engineer can do M and N, and both are scheduled for Days 4 to 6. M is on the critical path, and N has 5 days of total float. You must judge whom to delay first and which technique each choice is.
The difference between smoothing and leveling lies in whether the delay goes beyond the float and whether the critical path is touched. Making N wait for M, so N runs from Day 7, delays N by 3 days, which does not exceed its 5 days of float, so the finish date and the critical path do not change; this is resource smoothing, and B is correct. Making M wait for N delays M, which has no float, by 3 days, so the finish date slips 3 days; this uses the critical path and is resource leveling, and C is correct. The answers are B and C.
- Option 1: M on Days 4-6, N on Days 7-9; N is delayed 3 days, 3 ≤ 5, the finish date is unchanged: smoothing
- Option 2: N on Days 4-6, M on Days 7-9; M is delayed 3 days and has no float, so the finish date slips 3 days: leveling
Why the other options are wrong
- A. M is on the critical path and has no float, so delaying it necessarily delays the finish date.
- D. Both techniques change start dates. The criterion is not whether dates change but whether the delay goes beyond float and touches the critical path; N's delay is within its float, so it is smoothing.
Key takeaway Delaying an activity within its available float to resolve a resource conflict is resource smoothing. If the adjustment instead delays a zero-float critical-path activity, it is resource leveling and affects the project duration.
Variation If N had only 2 days of total float, a 3-day delay would exceed it by 1 day; N's path would then become the new longest path and the finish date would slip 1 day, so it could only count as resource leveling.
- Question 103
A project manager in a matrix organization leads a development project that integrates several internal ticketing systems and removes data conflicts. Developers have deployed the system to production, and some benefits have been realized, but it will take some time before all benefits are fully realized. It has not yet been confirmed whether the functional department is ready to accept the handover. What should the project manager do?
Show answer and explanation
Correct answer: A
A project manager in a matrix organization leads a project integrating several ticketing systems. The system is in production and some benefits have been realized, but full realization will take time, and it is not yet confirmed that the functional department is ready to accept the handover. What should the project manager do?
It is normal for benefits to be fully realized long after a project ends. PMBOK 8 notes that the project is typically handed over to operations to sustain and use the results of the project. Before closing the project, the project manager must ensure the deliverables are handed over smoothly, coordinate with the functional department manager and verify the department’s readiness to accept them, so that benefits keep being produced in operations. The remaining tracking follows the benefits management plan. The answer is A.
Why the other options are wrong
- B. Although the system is in production, readiness to hand over to operations has not been confirmed. Benefits keep being realized through tracking under the benefits management plan after handover, and there is no need to keep the project open until all benefits are realized.
- C. Periodic tracking of benefits under the benefits management plan is enough. Opening a new project only adds organizational cost and does not fit the temporary nature of projects.
- D. Finalizing, archiving and closing without confirming that the functional department is ready to accept would make the handover fail and ignores the stem’s focus on benefits.
Key takeaway Benefits may not be fully realized until after the project ends, so the project manager must ensure a smooth handover to the functional department.
Variation If the functional department is not yet ready to accept, postpone closure and first coordinate training and resources until the handover is ready.
Reference The System for Value Delivery · Lesson 4: Benefits Tracking and Handover After the Project
- Question 104
A project manager is responsible for a project whose nature is completely different from the organization’s earlier projects and is tailoring the project artifacts for it. Who should decide which artifacts to use?
Show answer and explanation
Correct answer: A
The project’s nature is completely different from the organization’s earlier projects, and the artifacts are being tailored. You must decide who decides which artifacts are used.
Artifacts should be tailored by those who know the project best. The project is unusual, so the organization’s standard artifacts may not apply; the project manager and project team, based on this project’s characteristics, select suitable ones from those available and adjust them where needed, so that they really fit the project. The guide also stresses that inputs, outputs, tools, and techniques are only common options and are not required on any given project. The subject of tailoring is the project manager and the project team; other roles can give input or approve when external groups are affected, but they do not decide the artifacts for them. The answer is A.
Why the other options are wrong
- B. The sponsor does not necessarily know project management practices and knows the project less well than the project manager and team, so should not directly specify the artifacts.
- C. The project is unique, so the organization’s full set of standard artifacts cannot be copied directly and must be screened against the project.
- D. Stakeholders can give input, but choosing artifacts is a professional judgment of the project management team and should not be decided by a stakeholder meeting.
Key takeaway How artifacts are tailored is decided by the project manager and the project team according to the project’s characteristics.
Variation If the tailoring would affect external groups, PMO approval may be required. Tailoring that affects only the internal team is usually approved by the project manager, and organizational policy and governance arrangements must still be followed.
- Question 105
A server-room renovation project at PMLyceum consists of six activities. All relationships between activities are finish-to-start, and the durations are shown in the diagram. Activity A starts immediately when the project starts. If Activity B starts 2 weeks later than planned, what will be the effect on the project?
Show answer and explanation
Correct answer: C
All relationships between activities are finish-to-start. B starts 2 weeks late, and you must judge the effect on the finish date, the critical path and float, which starts with finding the critical path.
Of the two paths, A-B-D-F is longer and is the critical path. B is on it, with total float 0, so the delay passes straight through to F. With B starting 2 weeks late, this path becomes 16 weeks while the other is still 12 weeks, so the finish date is pushed back 2 weeks and the critical path does not change. The answer is C.
- A-B-D-F = 3 + 4 + 5 + 2 = 14 weeks; A-C-E-F = 3 + 3 + 4 + 2 = 12 weeks; the critical path is A-B-D-F
- B starts 2 weeks late: A-B-D-F = 14 + 2 = 16 weeks; A-C-E-F is still 12 weeks
- The finish date moves back 16 − 14 = 2 weeks, and the longest path is still A-B-D-F
- Check: the float of the non-critical path is 14 − 12 = 2 weeks, which cannot absorb a delay on the critical path
Why the other options are wrong
- A. B is on the critical path and has no total float. Its delay passes straight through to F, so the finish date cannot stay the same.
- B. After the delay, A-B-D-F is 16 weeks and A-C-E-F is still 12 weeks. The longest path has not switched, so the critical path has not changed.
- D. D is on the critical path and its total float stays at 0. B's delay only makes the critical path longer; it does not give D any float.
Key takeaway When there is no extra date constraint, the critical path has zero total float, and other conditions are unchanged, a delay on a critical-path activity usually pushes back the finish date by the same amount; a delay on a non-critical activity may be absorbed by total float.
Variation If the delay were on C, starting 2 weeks late, A-C-E-F would become 14 weeks, exactly equal to the critical path. It would use up the 2 weeks of float, the finish date would not change, and both paths would be critical.
- Question 106
A packaging line at PMLyceum requires each bag to have a net weight of 238-262 g. The team leader samples one bag every hour and plots the weights on a control chart (see figure): mean 250 g, upper control limit 256 g, lower control limit 244 g. All 20 points are within both the control limits and the specification limits, but points 9 through 15 are 7 in a row above the mean. What should the project manager do next?
Show answer and explanation
Correct answer: D
The packaging line requires a net weight of 238-262 g per bag. The control chart has a mean of 250 g, an upper control limit of 256 g and a lower control limit of 244 g. All 20 points are within both the control limits and the specification limits, but points 9 through 15 are 7 in a row above the mean. The question asks what the project manager should do next.
In common exam practice, seven consecutive points on the same side of the mean is an out-of-control signal, even if no point goes beyond the control limits, so the process is judged out of control. At the same time, all 20 sampled points are within the specification limits, so the sampled units conform, and the stem shows no nonconforming products that would call for reworking the whole batch. But you do need to investigate and eliminate the abnormal cause (for example weighing equipment drift or a change in raw material), and correct it before the problem gets worse. Whether to stop production or expand inspection should be decided according to risk and established procedures. The answer is D.
- Step 1, check for points outside: the control limits are 244-256 g and all 20 points are inside them, so none is outside.
- Step 2, check for seven in a row: points 9 through 15, 7 points, are consecutively above the mean of 250 g, so the rule holds.
- Step 3, judgment: out of control.
- Step 4, check the specification limits of 238-262 g: all 20 sampled points are inside them, so the sampled units conform, and there is no sign of nonconforming products that would require reworking the whole batch.
- Conclusion: out of control but conforming; promptly find the cause and correct it, and decide whether to stop production according to risk and established procedures. Choose D.
Why the other options are wrong
- A. Conforming products do not mean the process is in control. Seven in a row on one side is already an out-of-control signal, and ignoring it would miss the chance for early correction.
- B. All 20 sampled units are within the specification limits, and the stem shows no nonconforming products needing rework, so you cannot demand an immediate stop and rework of everything on this basis. The response to out of control is to find the cause; whether to stop production or widen inspection afterward is decided by risk and established procedures.
- C. The purpose of the seven-point rule is to warn before a point goes beyond the limit. Waiting until a point is beyond the control limits is already too late.
Key takeaway Conformance of the product depends on the specification limits, and out of control depends on the control limits and the seven-point rule (exam practice). When a process is out of control but the product conforms, the cause must be found; whether to stop production or expand inspection is decided by risk and established procedures.
Variation If only 6 points were consecutively above the mean, it would not be out of control and you would keep monitoring; if one of the points reached 257 g, it would be beyond the upper control limit and judged out of control directly.
- Question 107Select 3
An e-commerce website redesign uses a predictive approach, and the project manager is responsible for the project scope from development through management. Which THREE of the following practices are appropriate? (Select THREE.)
Show answer and explanation
Correct answer: BDE
The project uses a predictive approach, and the project manager owns the scope from development through management. (Adaptive projects manage scope through the product backlog and iteration planning, with lighter governance.) The question asks which three practices are appropriate when developing and managing the project scope.
The Scope performance domain is about identifying all of the work required, and only the work required, to complete the project successfully. In practice, developing and managing scope comes down to three things. First, reach agreement with stakeholders on the project scope, so everyone shares one basis for what is and is not included (B). Second, decompose the scope level by level into smaller parts that can be assigned, forming the work breakdown structure (D). Third, once the scope baseline exists, handle every change through the formal change control process, evaluated and approved before taking effect (E). These three correspond to define, decompose and control. The answer is BDE.
Why the other options are wrong
- A. Agreeing to every new request immediately lets unevaluated, unapproved work into the project. That is the source of scope creep and goes against “do no unnecessary work.”
- C. Without a clear scope boundary, the team and stakeholders have no shared basis for what is in and out, and deliverables cannot be checked against the baseline; with a blurred boundary, changes cannot be recognized or controlled either.
Key takeaway Three scope management tasks: define and agree, decompose, and control through change procedures.
Variation If the stem described an adaptive project, scope would usually be managed through the product backlog and iteration planning: the product owner orders the backlog, and, in Scrum, no change that endangers the iteration goal is made during the iteration. E would then be not a “formal change control process” but governance light enough for that life cycle.
- Question 108
At the iteration review, the product owner and key stakeholders inspect 4 user stories the team has completed. One key stakeholder confirms that the order-filtering feature meets the agreed acceptance criteria but raises a new expectation those criteria did not cover. What should the product owner do FIRST?
Show answer and explanation
Correct answer: D
At an iteration review, a key stakeholder confirms that the order-filtering feature meets the agreed acceptance criteria but raises a new expectation those criteria did not cover. What should the product owner do first?
The purpose of the review is to get feedback. When a stakeholder raises a new expectation the criteria did not cover, the first step is to verify the real expectation: talk with the stakeholder to find out what they want added or changed, then rewrite the relevant story accordingly, put it in the product backlog and order it, and only then schedule the implementation. Any action taken before the expectation is clear is guesswork, so the first thing to do is to talk about expectations and rewrite the story. The answer is D.
Why the other options are wrong
- A. Adding other high-value stories does not respond to this stakeholder's dissatisfaction and does not establish the real expectation.
- B. Assess and Implement Changes is not limited to predictive projects. Here, first clarify the expectation, refine and adjust the Product Backlog, and continuously analyze impact and priority rather than immediately starting a formal change-request process. If baselines, contracts, or governance requirements are affected, follow the applicable formal change control as well.
- C. A fix may well be needed, but scheduling it before the expectation is clear does not answer “what first” and may fix the wrong thing.
Key takeaway When there is an objection to the increment at a review: clarify the expectation with the stakeholder first, then rewrite the story and put it in the product backlog.
Variation If the objection comes from the customer and the product owner and the customer disagree about acceptance, handle it on the basis of the agreed acceptance criteria, the definition of done and the contract arrangements, with the product owner deciding how to update and order the product backlog. If the question asks what the outcome of a review is, the answer is feedback and follow-up adaptations, which may lead the product owner to adjust the product backlog and its ordering.
- Question 109
A company launches a robot-vacuum development project and appoints a project manager. At a review meeting, a stakeholder questions the project manager's role, arguing that he must be an expert in mechanics, programming and sensing, or he cannot ensure the project's success. What should the project manager do?
Show answer and explanation
Correct answer: B
The project has just started and the project manager has been appointed. A stakeholder questions the technical skills the project manager should have. The question is how the project manager should respond.
The core role of the project management team is to guide the team, manage the processes that deliver the intended outcomes, and coordinate the project. It is not to be an expert in every technical field. The project manager's assignment and the corresponding responsibility and authority are set out in the project charter. Showing and explaining the charter uses a formal document to clarify the role and remove the stakeholder's doubts. The answer is B.
Why the other options are wrong
- A. The project manager's job is to manage the project, and nobody requires expertise in every technical field. Asking the sponsor to cancel the project because of one missing skill is an extreme response.
- C. The stakeholder is questioning the project manager's role, which the charter can clarify. Hiring another expert does not respond to the challenge and creates unnecessary cost.
- D. The stakeholder engagement plan records strategies for fostering stakeholders' engagement in decisions and execution. It does not cover the project manager's role and responsibilities, and the problem is not a lack of stakeholder engagement.
Key takeaway The project manager's responsibility and authority are defined by the project charter. When your qualifications are questioned, use the charter to clarify.
Variation If a stakeholder questions whether the project manager must personally have every strategic competency, explain that the project management team can supply the needed competencies together (including business acumen). If there is a genuine business acumen gap, assess the learning need and fill it through training, coaching or bringing in the relevant expert. If the question is about the limits of the project manager's authority, clarify with the charter, and let the sponsor decide anything beyond it.
- Question 110
PMLyceum’s enterprise sustainability strategy requires every project to report the carbon emissions associated with its deliverables and to include the related KPIs in contracts. A newly appointed project manager thinks this is an internal company initiative that has nothing to do with the project and can be ignored. Which of the following describes the relationship between such requirements and the project MOST accurately?
Show answer and explanation
Correct answer: C
The company’s sustainability strategy requires all projects to report the carbon emissions associated with their deliverables and to include the related metrics in contracts. The new project manager regards this as an internal initiative. The question asks about the relationship between enterprise requirements and the project.
The signal is that the enterprise already has a sustainability strategy with specific requirements. The Eighth Edition says relevant sustainability processes and practices may already be integrated into enterprise environmental factors; for example, an enterprise sustainability strategy may impose requirements on project deliverables and teams. The related metrics can go into the scope statement, charter, business case, contracts and other documents, and compliance can be monitored in planning, execution and closing. So it is a constraint on the project and must be followed. The answer is C.
Why the other options are wrong
- A. Enterprise strategy can impose requirements on a project’s deliverables and team. It does not bind only the operations department.
- B. Compliance is monitored in planning, execution and closing, not checked once at closing, and it has to be handled from the planning stage.
- D. Such requirements may already be enterprise environmental factors, not an optional organizational process asset for reference, and a project cannot decide for itself whether to adopt them.
Key takeaway An enterprise’s sustainability requirements may already be enterprise environmental factors that constrain the project, and compliance can be monitored in planning, execution and closing.
Variation If asked who is responsible for integrating sustainability, the answer is the project manager, the team and the sponsor jointly. If asked which documents the requirement goes into, the answer is the scope statement, project charter, business case or contracts.
- Question 111
A project is going very badly. The newly assigned project manager wants first to find out what resources the organization can supply, so reviews the procurement agreements the organization has signed with outside suppliers and the contractual constraints. Which kind of content is the project manager looking at?
Show answer and explanation
Correct answer: C
A project is going badly. The newly assigned project manager wants to know what resources the organization can supply and reviews the procurement agreements with outside suppliers and the contractual constraints. You must decide which kind of content is being looked at.
PMBOK 8 defines enterprise environmental factors as conditions not directly influenced by the project team that impact, constrain or direct the project, and lists “resource availability” as an internal enterprise environmental factor, covering contracting and purchasing constraints, staffing levels or team capacity, and collaboration agreements. The contracting and purchasing constraints reflected in procurement agreements affect whether resources can be obtained and in what quantity; because the project team cannot directly influence these conditions, they are enterprise environmental factors. The answer is C.
Why the other options are wrong
- A. Organizational process assets include the organization's plans, processes, templates and knowledge repositories. The project team may tailor or update some of these assets in accordance with organizational policies, but policies, processes and procedures generally are not updated by the project team; the question concerns the contracting and purchasing constraints that affect resource availability.
- B. Policies and procedures are a category of organizational process assets and set how work is done. The question is about whether resources can be obtained, not about a work process.
- D. The lessons learned knowledge repository holds historical information from earlier projects. The project manager here is looking at existing contractual constraints, not historical experience.
Key takeaway Resource availability (including contracting and purchasing constraints) is an internal enterprise environmental factor that the project team cannot directly influence.
Variation If the project manager were looking at supplier evaluation records from earlier projects, those would be historical information within organizational process assets.
Reference Enterprise Environmental Factors · Lesson 1: Enterprise Environmental Factors: Definition and Internal Factors
- Question 112Select 3
A convenience retail chain's store management system upgrade project has entered planning. Before preparing the project management plan, the project manager sorts out the enterprise environmental factors and organizational process assets that affect the project. Which of the following statements about them are true? (Select 3)
Show answer and explanation
Correct answer: BCF
The project is in planning. You must decide which of six statements about the two kinds of influencing factors are true. The core is “which are enterprise environmental factors, which are organizational process assets, and can they be controlled?”
Enterprise environmental factors are conditions not directly influenced by the project team that impact, constrain or direct the project, and their source can be inside or outside the organization; internal ones include organizational culture, structure and governance, employee capability and so on. Organizational process assets are the organization's own processes, policies, procedures and knowledge repositories, including the lessons learned and historical information of earlier projects. So B (employee capability is an internal enterprise environmental factor), C (lessons learned are organizational process assets) and F (the source can be inside or outside) are correct. The answer is B, C and F.
Why the other options are wrong
- A. Organizational structure falls under “organizational culture, structure and governance,” an internal enterprise environmental factor. A restructuring is a change in an environmental condition, not a change in organizational process assets.
- D. The two kinds are inputs of a different nature, and there is nothing to support that enterprise environmental factors always affect a project more than organizational process assets. The degree of effect depends on the particular project and cannot be generalized.
- E. The characteristic of enterprise environmental factors is that the project team cannot directly control them and has to take them into account during the project, with the legal, policy and other mandatory constraints among them to be obeyed. What the team can draw on, and in part update, are organizational process assets.
Key takeaway Enterprise environmental factors: not directly controllable by the team, to be considered in planning, from inside or outside. Organizational process assets: from the organization itself; knowledge repositories are updated throughout the project, while policies, processes and procedures change only under organizational procedures.
Variation If the stem were changed to “select the statements that are NOT true,” the answer would become A, D and E. If one more option were added, “organizational process assets come from inside the organization and their knowledge repositories can be updated,” it would be true. In multiple-response questions, judge each option separately against the definitions and not by overall impression.
- Question 113Select 2
The project manager is sorting out this month's quality work. Which TWO of the following are quality control activities rather than quality assurance? (Choose 2.)
Show answer and explanation
Correct answer: BC
Some of the four options are aimed at the process and some at the deliverables, and you must pick the two that are quality control. Quality control and quality assurance both serve the quality objectives, and the key to telling them apart is the object each focuses on.
The test is the focus: quality control focuses on whether deliverables meet defined specifications and thresholds, and quality assurance focuses on whether processes are compliant and effective. B, “checking whether completed deliverables meet the quality metrics”, and C, “recording product defects found in testing”, are both aimed at deliverables and are quality control. The objects of A and D are processes, so they are quality assurance. In a multiple-response question, judge each option by its object, and do not pick an option just because it sounds “related to quality”. The answers are B and C.
Why the other options are wrong
- A. Auditing whether the team's process follows organizational standards focuses on the process. It is a quality audit and belongs to quality assurance.
- D. Summarizing good practices from a quality audit and spreading them uses the audit results to improve the process, which is the role of quality assurance.
Key takeaway Look at the focus: checking deliverables and recording defects are quality control; process audits and spreading good practices are quality assurance. Quality control answers “is the result acceptable?”, and quality assurance answers “is the way of working right, and can it be improved?”
Variation If an option said “draft the quality management plan”, that is quality management work in project planning. It is neither a quality assurance nor a quality control activity.
- Question 114
A supermarket chain is using a hybrid approach to migrate its inventory management system to an upgraded system, planning to go live in batches by store region. The operations team says it is not yet ready to take over and support the new system. How should the project manager respond appropriately?
Show answer and explanation
Correct answer: A
A hybrid project migrates the inventory system by store region in batches, and the operations team says it is not ready to take over and support the new system. You must decide how the project manager should respond appropriately.
The migration goes live in batches, and after each batch goes live the operations team must take over and support it, so knowledge transfer must proceed in step with the batches. Arranging a knowledge transfer meeting between the project team and the operations team for every migration batch lets operations take over gradually, so the “not ready” problem is effectively resolved, and the practice carries through every later batch. The answer is A.
Why the other options are wrong
- B. Recording lessons learned and putting training into future projects does not solve the current migration problem; the operations team is still not ready.
- C. Delivering the documentation only at the end of the project is too late. And documentation alone cannot give the operations team the real ability to provide support.
- D. Adding a handover phase at the end means operations must struggle through every batch until the project ends, which is far too late.
Key takeaway Delivering in batches means handing over in batches; knowledge transfer runs through every batch and must not be left to the end.
Variation In a predictive project with a single delivery, formal handover can be concentrated at the final delivery point, but the operations team’s involvement, training, and handover preparation should still be planned and started early. In a hybrid or adaptive project that delivers in batches, arrange handover at each delivery point.
- Question 115
You have been appointed project manager to add new functions to the company's smart Q&A chatbot. The project management office has approved the project charter, but several key stakeholders are discouraged: they feel that what comes out will be no different from what they have now. To help them see what requirements the project is meant to meet and to remove their doubts, what should you do?
Show answer and explanation
Correct answer: B
The project charter is approved, but key stakeholders worry that what is delivered will be no different from what exists today. The question asks how to help them see the requirements the project is meant to meet.
Their doubt comes from not knowing exactly which functions and capabilities the final product will have. Requirements documentation is the document that describes how individual requirements meet the business need. Writing each functional requirement in it in detail describes the product's behavior and capabilities, so stakeholders can see how the new functions differ from the existing product and their doubts disappear. The answer is B.
Why the other options are wrong
- A. A business case is an economic feasibility study, with cost-benefit content as well. The charter is already approved, so there is no need to redo the whole thing, and it would not explain specific functions.
- C. A work breakdown structure decomposes deliverables and work to organize and assign the work. It is not a document that explains requirements to stakeholders, and with the requirements still unclear the conditions for decomposition are not met.
- D. Quality requirements are the conditions or standards for confirming that deliverables have been completed successfully. The stakeholders' worry is about what functions will be built, not how acceptance standards are set.
Key takeaway To let stakeholders see “what will be built,” spell out the functional requirements in the requirements documentation.
Variation If the stem were changed to “stakeholders worry there will be no standard at acceptance,” you would add quality requirements to the requirements documentation and write the acceptance criteria into the scope statement.
- Question 116
A team has entered the Storming stage. Competition and friction have appeared among members, and progress is affected. What is the BEST thing for the project manager to do now?
Show answer and explanation
Correct answer: A
A team has entered the Storming stage, with competition and friction among members and progress affected. The question asks for the project manager’s best action now.
Storming is a stage a team may experience as members begin addressing the work and differences surface. It is not by itself a sign that the project manager has failed, but the differences need to be handled constructively. The project manager’s job is to make differences open and discussable: guide members to talk through disagreements face to face and agree on ways of working that everyone will follow. With shared rules the team can move toward the Norming stage. This approach keeps differing opinions and turns conflict into rules. The answer is A.
Why the other options are wrong
- B. A written warning as an example makes members afraid to speak up, communication becomes more closed, and the Storming stage may drag on even longer.
- C. Escalating each dispute to the sponsor takes away the team’s chance to solve problems and build rules itself, and the project manager gives up the responsibility of leading the team.
- D. Suspending discussion and deciding all technical approaches personally shuts members out, merely pushes the disagreements down, and leaves the team dependent on the project manager, so it never reaches self-running Performing.
Key takeaway In the Storming stage, guide disagreements into the open and agree on shared ways of working. Do not suppress, punish or escalate everything.
Variation If an agile team has friction in its first iteration and proposes ending the iteration early, the coach should tell the team that this is normal in the Storming stage and encourage the team to work through it on its own.
- Question 117
The figure below is the activity network diagram of a network upgrade project, showing the sequence and duration (in weeks) of each activity. The project manager is asked to shorten the project duration by 2 weeks. None of the activities can be fast tracked; activities P and T cannot be crashed, activity U can be crashed by at most 2 weeks, and each of the other activities can be crashed by at most 1 week. To meet the new duration requirement, which action should the project manager take?
Show answer and explanation
Correct answer: A
The network diagram has two paths, the duration must be shortened by 2 weeks, and the stem limits which activities can be crashed. The question is which activities to crash.
Both paths are critical, and the total duration must come down by 2 weeks, so each path must be shortened by 2 weeks; compressing only one is as good as compressing none. P and T cannot be crashed, so path 2 can only be shortened by crashing U by 2 weeks. On path 1, two of Q, R and S must be crashed by 1 week each, and the combination offered in the options is R and S. The answer is A.
- Path 1: P-Q-R-S = 2 + 3 + 2 + 2 = 9 weeks; path 2: P-T-U = 2 + 4 + 3 = 9 weeks; both are critical paths
- Path 2: T cannot be crashed, so crash U by 2 weeks, giving 7 weeks
- Path 1: crash R and S by 1 week each, giving 7 weeks
- Both paths are 7 weeks, the total duration is shortened by 2 weeks, and the target is met
Why the other options are wrong
- B. It includes T, which cannot be crashed, and it shortens path 1 by only 1 week (through R), leaving it at 8 weeks.
- C. Crashing only U brings path 2 down to 7 weeks, but path 1 is still 9 weeks, so the total duration does not change. Only one critical path was compressed.
- D. Crashing only R and S brings path 1 down to 7 weeks, but path 2 is still 9 weeks. It ignores the other critical path.
Key takeaway With several critical paths, every one must be compressed by enough; compressing only one is as good as compressing none.
Variation If U could be crashed by at most 1 week, path 2 could come down to only 8 weeks, so the total duration could be shortened by only 1 week and the 2-week requirement could not be met.
- Question 118
After the vision of a government services project is set, the project manager finds that what the team actually does is drifting further and further from the vision. Which measure is MOST effective?
Show answer and explanation
Correct answer: B
The vision has been set, and the project manager finds the team’s actual work is increasingly off the vision. The question asks which measure is most effective.
To keep the team’s work from drifting, treat the vision as a reference point: regularly compare the team’s work with the vision, check whether each activity still serves it, and correct course promptly when drift appears. This is continuous, it addresses the cause, it does not change the vision itself, and it does not substitute control measures for calibrating direction. A vision becomes the standard for the team’s everyday trade-offs only when it is brought out and checked against repeatedly. The answer is B.
Why the other options are wrong
- A. Immediately cutting scope without analyzing the cause or following the applicable change process may remove necessary approved work and does not establish an ongoing mechanism for checking work against the vision and correcting drift.
- C. Lowering the demands of the vision accommodates the deviation and strips the vision of its guiding role. It would also let stakeholders’ expectations of the project go unmet.
- D. Adding supervisors to check hours looks only at how much effort goes in and cannot tell whether the work is in line with the vision. It also raises cost and hurts team morale.
Key takeaway Regularly check the work against the vision, and correct course promptly.
Variation If the drift arises because a change in the external environment has made the vision itself no longer applicable, revise the vision together with stakeholders instead of forcing the work back on course.
Reference Project Charter · Lesson 3: Shared Vision
- Question 119
An order-system rework project at PMLyceum has six activities (durations in days) and starts on Day 1: A takes 3 days and has no predecessor; B takes 7 days, predecessor A; C takes 5 days, predecessor A; D takes 4 days, predecessor B; E takes 8 days, predecessor C; F takes 2 days, predecessors D and E. Using the convention LF = the minimum LS of the successors − 1, on which day is the late finish of Activity A?
Show answer and explanation
Correct answer: A
The project starts on Day 1. The question asks about only one step of the backward pass: how to take the late finish of A when A has two successors.
In the backward pass, when an activity has several successors, take the minimum of their late start dates and subtract 1. A's successors are B and C, so you must find the LS of each before you can take the smaller. A-C-E-F is the critical path and A is on it, so LF equals EF, Day 3. The answer is A.
- Forward pass: A Days 1-3; B Days 4-10; C Days 4-8; D Days 11-14; E Days 9-16; F has ES = 17 and EF = 18, so the duration is 18 days
- Backward pass: F has LS = 17; D has LF = 16 and LS = 13; E has LF = 16 and LS = 9; B has LF = 13 − 1 = 12 and LS = 6; C has LF = 9 − 1 = 8 and LS = 4
- A's successors are B (LS = 6) and C (LS = 4); take the smaller, 4, so LF = 4 − 1 = 3
- Check: A-C-E-F = 3 + 5 + 8 + 2 = 18, the critical path, so A has total float 0 and LF = EF = 3
Why the other options are wrong
- B. This takes the smallest LS = 4 but forgets to subtract 1. If the next activity can start as late as Day 4, A has to finish on Day 3.
- C. This takes the larger successor LS (B's 6) and subtracts 1. It is the error of “taking the maximum on the backward pass” and would let A finish later than C allows.
- D. This takes B's late start, 6, directly as A's late finish. It takes the larger value and also forgets to subtract 1.
Key takeaway On the backward pass, take the minimum LS of the successors and subtract 1; the activity just before a split is the one most often done the wrong way round.
Variation If C were shortened to 3 days, A-B-D-F and A-C-E-F would both be 16 days, both would be critical paths, and A's LF would still be Day 3.
- Question 120
An agile team has just finished its previous project and is about to join a new one. What should the team do to keep its understanding of the overall goal aligned with stakeholders' expectations?
Show answer and explanation
Correct answer: D
A new project is about to start, and an agile team that has just finished its previous project is joining it. The team needs to understand the overall goal first. Which action keeps the team's understanding of the overall goal in line with stakeholder expectations?
A vision statement summarizes the product's target market, users, major benefits, and differentiation. It is a basis for understanding the overall goal and stakeholder expectations, and a starting point for the roadmap and backlog that follow. The team should therefore review the project's vision statement first and elaborate from there. The other options either demand a complete specification up front or are general requirements, and none of them directly identifies for whom the product creates value and what major benefits it offers. The answer is D.
Why the other options are wrong
- A. Agile does not rely on a complete specification written in advance, and the team should not “require” the product owner to hand over as detailed a specification as possible; what the product owner maintains is the backlog.
- B. A kickoff meeting and clear roles help collaboration, but this option focuses on dividing responsibilities and does not directly explain the product's target users and major benefits.
- C. Working with the coach and following agile principles are general requirements and do not help the team understand this product's target users and major benefits.
Key takeaway To know why the project is being done and what it will deliver, look at the vision statement first.
Variation If the vision statement is unclear, the team should hold a vision workshop with the product owner to clarify it and then build the roadmap from it.
Reference Release Planning and Prioritization · Lesson 1: From Vision to Iteration Plan: Planning Levels, the Product Roadmap and the Planning Onion
Practice test or full mock exam: what is the difference?
- Free practice tests: 8 tests, the first with 120 questions and the others about 107 each, drawn from the 1,000 free questions (you may have met some while practicing by chapter), no login. Good for a quick self-check and for finding your weak domain.
- Full mock exams: 180 questions each, separate from the practice bank (none of them appear there), timed in 3 sittings like the real exam. Use them to judge whether you are ready. See the full mock exams.
Free PMP practice test: common questions
Is this PMP practice test really free?
Yes. There is no account and no email wall. All 120 questions and the full explanation of every answer are free, and your progress is saved in your browser.
How were the 120 questions chosen?
They come from the 1,000 free questions: 40 People, 49 Process and 31 Business Environment questions, covering 26 of the 26 tasks of the Exam Content Outline, with single-answer and multiple-answer questions and graph-based questions. The mix follows the current exam weights (People 33%, Process 41%, Business Environment 26%).
How long does the test take?
Timed mode follows the real exam's pace of 80 seconds a question, so 120 questions get 160 minutes. You can also choose untimed practice and take as long as you like.
How are multiple-answer questions scored?
A multiple-answer question counts as correct only when you select every correct option and nothing else. There is no partial credit, and an unanswered question counts as wrong.
Are these real PMP exam questions?
No. PMI does not release exam questions. Every question here is original, written to the Exam Content Outline, to practice the question styles and the reasoning.
What should I do after the test?
Take another of the free tests, keep practicing by chapter in the 2,876-question bank, or take one of the 10 full mock exams of 180 questions. Your score here is a practice signal, not a prediction of the exam result.
To study first, read the study guide; for the whole bank, practice by chapter.