PMP · Agile and Hybrid · 3 lessons · about 33 min

Part of the free PMP video course: every lesson starts with its video →

What this chapter covers

Scrum is the most widely used agile framework and one of the frameworks most frequently tested in PMP agile questions. (The exam content outline says only that adaptive/agile and hybrid approaches together make up about 60% of the exam.) This chapter gives the whole picture of Scrum. First we build intuition from an everyday shopping trip and pick out the core practices: a fixed timebox, a team that usually stays stable, work selected from an ordered backlog and turned into usable Increments, and changes continually reflected in the backlog. Then we see how Scrum turns cycle after cycle, and the three pillars (transparency, inspection, adaptation). Next you memorize the core “3-3-5-5” and the five values. Finally we cover where Scrum sits among agile methods, and how multiple teams coordinate.

The three accountabilities (often called the three roles, a common exam term), the three artifacts and the five events are covered in the later chapters on Scrum roles, the Product Backlog and Scrum events. This chapter shows only how they connect into a whole. The chapter is not long, but its content is the most stable and the easiest place to pick up points: list the artifacts, judge the values, and explain the Scrum of Scrums.

Lessons in this chapter

Chapter map

Shopping list ≈ Product Backlog; one shopping trip ≈ one Sprint  
Scrum flow: idea → Product Backlog → Sprint Planning → Sprint (with the Daily Scrum, the Sprint Review and the Sprint Retrospective; the Increment takes shape during the Sprint; the Sprint ends when the Sprint Retrospective ends) → next Sprint  
Three pillars: transparency · inspection · adaptation  
3-3-5-5: 3 roles/accountabilities (Product Owner · Scrum Master · Developers)  
         3 artifacts (Product Backlog · Sprint Backlog · Increment) and their commitments (Product Goal · Sprint Goal · Definition of Done)  
         5 events (Sprint · Sprint Planning · Daily Scrum · Sprint Review · Sprint Retrospective)  
         5 values (Commitment · Focus · Openness · Respect · Courage)  
Position: Scrum provides a lightweight management framework; Extreme Programming focuses on engineering practices; Kanban visualizes and optimizes the workflow; Lean stresses value, flow and eliminating waste  
Scaling: multiple teams can coordinate with the Scrum of Scrums and similar approaches; SAFe, LeSS and other scaling frameworks are chosen by product, number of teams, dependencies and organizational context  

Lesson 1

Understanding Scrum Through a Shopping List, and How Scrum Flows

Lesson video

Lesson overview

Scrum is the most widely used agile framework and one of the frameworks most frequently tested in PMP agile questions. This lesson gives the whole picture. First we build intuition with an everyday shopping trip and pick out the core practices: a fixed timebox, a team that usually stays stable, delivery of smaller increments in priority order, and changes going into the backlog. (A stable team is a recommended practice, not a rule of Scrum.) Then we map that intuition onto the overall flow of Scrum, and finally cover the three pillars. The three accountabilities (often called the three roles, a common exam term), the three artifacts and the five events are covered in later chapters; this lesson shows only how they connect into one whole. The next lesson covers “3-3-5-5” and the five values.

Understanding Scrum through one shopping trip

Suppose you need to restock the house at the weekend: grain and cooking oil, household goods, drinks, snacks, seasonings, meat and vegetables, a bit of everything. This job has three features. The ideas are rough and need refining. Time is short, so you must start at once. And the needs are likely to change along the way. This is exactly the kind of situation Scrum is good at.

The approach is to list what you need to buy and order the list by priority from highest to lowest, with greens, toilet paper, rice and soy sauce first and snacks last. On each trip you take only the first few items on the list, as one small delivery. Each trip has three fixed features:

  1. Fixed time: each round trip takes 20 minutes.
  2. Fixed people: one person goes. (This is an analogy for a stable team, which is a common practice, not a rule of Scrum.)
  3. Value-driven: you buy a smaller increment in priority order, delivering the most valuable things first each time.

What if a new need pops up on the way? You do not change the trip already under way. You add the new need to the list, reorder the priorities, and decide on the next trip whether to buy it. The current trip generally does not allow changes. That is how agile embraces change without automatically disrupting the Sprint in progress: add the change to the Product Backlog and reorder it. If necessary, the Developers and Product Owner may renegotiate the current Sprint’s scope without endangering the Sprint Goal or reducing quality.

The correspondence between shopping and Scrum is as follows:

ShoppingScrum
The shopping listThe Product Backlog
Deciding what to buy this tripSprint Planning, which selects the Sprint Backlog
One shopping trip (20 minutes)One Sprint (a timebox, generally 1 to 4 weeks)
What you bring homeThe product Increment
New ideas met on the wayAdded to the Product Backlog and the backlog is reordered

Where the name Scrum comes from, and the overall flow

The word Scrum borrows the image of the scrum in rugby, where players push forward together, and stresses that results are delivered through teamwork. A Sprint is a fixed-length timebox.

Figure 1 shows the overall flow. In order:

  1. Customers, the market, leaders and others raise ideas, features and defects and pass them to the Product Owner.
  2. The Product Owner organizes and orders them to form the Product Backlog.
  3. At Sprint Planning, the Product Owner proposes how the product could increase its value, and the Scrum Team defines the Sprint Goal together. They usually consider items near the top of the order that are clear enough, select the items the team can complete given its capacity, and plan how to complete them. The Sprint Goal, the selected items and the plan for delivering them together form the Sprint Backlog.
  4. The team develops within a Sprint, a fixed timebox. During it the Developers hold a Daily Scrum every working day. (The Product Owner or the Scrum Master takes part as one of the Developers only when actually doing Sprint work.) The Scrum Master serves the team and causes impediments to be removed.
  5. During the Sprint one or more product Increments take shape. Near the end of the Sprint, they are demonstrated to stakeholders at the Sprint Review to collect feedback.
  6. Then the Sprint Retrospective is held to identify improvements in how the team works. When the Sprint Retrospective ends, the Sprint is over and the next Sprint begins.
Figure 1: How the Scrum framework runs

Every project starts from requirements, turns them into work to do, executes that work and finally delivers results. A predictive approach describes requirements and scope with a requirements document and a scope statement, breaks the deliverables down with a WBS, and calls the work to be done activities. Scrum describes requirements with the Product Backlog, selects the work to be done into the Sprint Backlog, and the Developers then break it down into tasks. Hold on to two features. Work is paced by fixed-length Sprints. And requirements have a clear owner and a single person who orders them: the Product Owner is accountable for the order, and the Developers work around the Sprint Goal, usually selecting items near the top of the order that are already clear enough.

The three pillars

Scrum rests on three pillars: transparency, inspection and adaptation. When the process and the results are visible to the people concerned, that is transparency. When results and progress are inspected frequently, that is inspection. When deviations are found and adjustments are made promptly, that is adaptation. Sprint Planning, the Daily Scrum, the Sprint Review and the Sprint Retrospective are all, in essence, fixed opportunities for inspection and adaptation. Without transparency, inspection has nothing to rest on, and without inspection, adaptation is just guessing. These three pillars come from the Scrum Guide and are common exam content.

The first Sprint of a course platform

A team is building an online course platform. The Product Owner collects more than 30 ideas from marketing, customer service and leadership, and orders them to form the Product Backlog. At Sprint Planning, the team assesses what it can complete in two weeks and selects 8 items from the top to form the Sprint Backlog. On day 3, operations asks for a “quiz in class” feature. The Product Owner thinks it is valuable but does not squeeze it into the current Sprint. Instead, it is written up as an item and placed in the Product Backlog, ranked third. Two weeks later, the team demonstrates three features at the Sprint Review: login, the course list and video playback. Then it holds the Sprint Retrospective and decides to estimate more conservatively in the next Sprint.

Worked examples

Example 1: A new requirement appears during the Sprint: where does it go?

Question 1Example

A team is using Scrum to build a community group-buying mini-app, and the current Sprint is on its third day. The operations director proposes a new coupon feature, and the Product Owner thinks it is very valuable. What is the most appropriate action now?

Show answer and explanation

Correct answer: B

The project uses Scrum, the Sprint is on its third day, the operations director proposes a new coupon feature and the Product Owner thinks it is valuable. How should this change be handled?

A new requirement that appears during a Sprint cannot be pushed straight into the Sprint in progress. It first enters the Product Backlog and is reordered with the other items, and a later Sprint Planning decides which Sprint takes it. The timebox of the current Sprint stays as it is. If the Sprint scope needs adjusting, the Developers and the Product Owner negotiate it around the Sprint Goal, and the Product Owner cannot simply push items in. The answer is B.

Why the other options are wrong

  • A. Pushing the new item straight into the Sprint Backlog and extending the Sprint both breaks the fixed timebox and bypasses the mechanism by which the Developers and the Product Owner negotiate scope around the Sprint Goal.
  • C. Stopping the Sprint for one new idea breaks the team's rhythm. Only the Product Owner can cancel a Sprint, and only when the Sprint Goal becomes obsolete, which is not the case here.
  • D. Scrum embraces change, so a valuable new idea should be accepted. It goes into the Product Backlog rather than the current Sprint. “Never consider it” is wrong.

Key takeaway A change goes first into the Product Backlog to be reordered. It is not pushed into the Sprint in progress, and the Sprint is not extended.

Variation Only if the stem said the new requirement would make the current Sprint Goal pointless might the Product Owner decide to cancel the Sprint. If a new requirement is urgent and valuable, it still enters the Product Backlog first, and the Product Owner orders it by value, risk, dependencies and similar factors. If it does not affect the current Sprint Goal, the Developers and the Product Owner can negotiate whether to adjust the current Sprint scope.

Something wrong with this question?

Report an issue with this question

Example 2: The backlog is ordered: what comes next?

Question 2Example

A team has just started using Scrum to build an online course platform. The Product Owner has organized the ideas from customers, the market and leaders and has ordered them by priority into a Product Backlog. What should the team do next?

Show answer and explanation

Correct answer: C

The Scrum team is just starting. The Product Owner has organized the ideas and ordered the list, and the Sprint has not started. The question asks what the team does next.

The order in which Scrum runs is: ideas go to the Product Owner, who organizes and orders them into the Product Backlog. Then at Sprint Planning the team selects the items it can complete from the top of the list to form the Sprint Backlog, and then enters the Sprint. So the next step after the list is ordered is Sprint Planning. The answer is C.

Why the other options are wrong

  • A. The Daily Scrum is held every day after the Sprint starts, and the Sprint has not started yet.
  • B. The Sprint Review demonstrates the Increment at the end of the Sprint, and no Increment exists yet.
  • D. The Sprint Retrospective looks back on how the team worked after the review, and there is no Sprint yet to look back on.

Key takeaway After the Product Backlog comes Sprint Planning, to select items, and then the Sprint. The Product Backlog is the source of the order. The Sprint Backlog is the Developers' plan for the Sprint, containing the Sprint Goal, the selected items and the plan for delivering them, and what the team commits to is the Sprint Goal, not a fixed scope of work.

Variation If the stem said the Sprint had ended and the Increment was built, the next steps would be the Sprint Review and then the Sprint Retrospective. If it said the Sprint is in progress and the team wants to sync on the day's work, the answer is the Daily Scrum.

Something wrong with this question?

Report an issue with this question

Common traps

Common trap

  • Do not add requirements casually within a Sprint. A new requirement goes to the Product Owner, who adds it to the Product Backlog and orders it, usually for a later Sprint. If it is truly necessary, the Developers can negotiate with the Product Owner to adjust the current Sprint Backlog, but this must not endanger the Sprint Goal, must not lower quality and does not call for extending the Sprint.
  • Once the Product Backlog exists, each Sprint is started by Sprint Planning, followed by the development work. The Daily Scrum, the Sprint Review and the Sprint Retrospective all take place within that Sprint's timebox.
  • The Sprint Review is about results and collecting feedback. The Sprint Retrospective is about the way of working and discussing improvements.
  • Agile “embraces change” does not mean “change the current Sprint at any time”. It means “accept the change, put it in the backlog, and do it in a suitable Sprint”.
  • The Sprint timebox is fixed. Items that are not finished go back to the Product Backlog, and the Sprint is not extended to fit them in.

Key point

  • The Sprint timebox is fixed and the team usually stays stable. As long as the Sprint Goal is not endangered, the scope can be renegotiated between the Developers and the Product Owner, and unfinished items go back to the backlog.
  • The main line of Scrum: Product Backlog, Sprint Planning, Sprint (including the Daily Scrum), product Increment, Sprint Review, Sprint Retrospective, and then the next Sprint.
  • The three pillars: transparency, inspection, adaptation.

Key takeaways

  1. The shopping-list analogy: the list is the Product Backlog, one trip is one Sprint, and what you bring home is the product Increment.
  2. Fixed time, a team that is usually stable, and scope negotiated by priority. A new change goes into the Product Backlog, usually for a later Sprint, and does not endanger the Sprint Goal.
  3. The flow: ideas, Product Backlog, Sprint Planning, Sprint (Daily Scrum), product Increment, Sprint Review, Sprint Retrospective.
  4. Two features of Scrum: fixed-length Sprints, and requirements that have a clear owner and a single person who orders them.
  5. The three pillars: transparency, inspection, adaptation.

Lesson 2

The Scrum Core 3-3-5-5 and the Five Values

Lesson video

Lesson overview

The previous lesson covered how Scrum runs. This lesson breaks it into a list that is easy to remember: three accountabilities, three artifacts, five events and five values, which this lesson shortens to “3-3-5-5”. (The list comes from the Scrum Guide; the shorthand is only this lesson’s memory aid.) This list is the most dependable “free points” area in the exam, and it is tested in two common ways: you are asked directly to list the members of one category, or you are given a scenario and asked which value it reflects. The details of each event and accountability are covered in later chapters. This lesson only makes sure you can tell the four categories apart and remember them accurately.

What 3-3-5-5 contains

NumberContentsCovered in detail in
3 accountabilitiesProduct Owner, Scrum Master, DevelopersScrum accountabilities
3 artifactsProduct Backlog, Sprint Backlog, IncrementThe Product Backlog
5 eventsSprint, Sprint Planning, Daily Scrum, Sprint Review, Sprint RetrospectiveScrum events
5 valuesCommitment, Focus, Openness, Respect, CourageThis lesson
Figure 1: The core of Scrum: 3-3-5-5

Keep three boundaries in mind. First, the Sprint itself is an event: it is a timebox, and the other four events all happen inside the Sprint. The Increment is the artifact. Second, artifacts are “things”: two backlogs and one Increment. Meetings and people are not artifacts. Third, accountabilities are held by “people”: the people holding the three accountabilities (Product Owner, Scrum Master, Developers) together make up the whole Scrum Team, and there are no sub-teams within the team. The 2020 Scrum Guide calls the people who do the development work “Developers”. Older materials say “development team”, which roughly corresponds to today’s Developers; do not read it as a separate sub-team inside the Scrum Team. This lesson uses “Developers”.

Each artifact has one commitment attached to it, which makes the artifact more transparent and more focused (these come from the Scrum Guide): the Product Backlog has the Product Goal, the Sprint Backlog has the Sprint Goal and the Increment has the Definition of Done. So in “the three artifacts and their commitments”, the Product Goal, the Sprint Goal and the Definition of Done are not three more artifacts. They are commitments attached to the artifacts.

Pair programming, test-driven development, continuous integration and the like are engineering practices from Extreme Programming. They are not among Scrum's three accountabilities, three artifacts or five events. When a question asks “What are the three artifacts of Scrum?”, the most common trap is to slip a role and a meeting into the options.

The five values

The Scrum values are Commitment, Focus, Openness, Respect and Courage. They are not slogans but standards for the team's everyday behavior. Each value maps to a kind of behavior in questions:

ValueMeaningWhat it looks like day to day
CommitmentWilling to commit to goals and to support each otherWorking together toward the team's goals and the Sprint Goal, and actively supporting each other to get the work done. What is committed to is the team goal and the Sprint Goal, not a guarantee to finish a fixed number of items or tasks
FocusPutting your mind and your abilities into the work you have committed toConcentrating first on the current Sprint's work and moving toward the Sprint Goal as far as possible, setting aside other people's odd requests for now
OpennessBeing transparent about the work, progress and challengesThe backlog and progress are open, difficulties are stated honestly and feedback is welcome
RespectEveryone has a different background and experience, and people respect each otherTrusting teammates' professional judgment and respecting customers and the Product Owner
CourageHaving the courage to do the right thing and face hard problemsDaring to refactor, daring to say “no” and daring to expose problems

The values and the three pillars support each other: openness makes transparency possible, only with transparency can there be inspection, and courage lets the team dare to make adjustments on that basis. So when a question says “make all the backlog and progress public”, that points to Openness. “Set aside scattered requests from other departments and go all out on the committed Sprint Backlog” points to Focus. When the emphasis is on dedication to goals, lean toward Commitment. When it is on making progress and difficulties visible, lean toward Openness. When it is on daring to face thorny problems and do the right thing, lean toward Courage. One behavior may reflect several values at once, so judge by what the stem emphasizes.

How to use this: match the behavior to the value

For a values question, first catch the verb and its object and then match:

  • The verb is “make public, show, be transparent, tell everyone” and the object is work, progress or difficulties: Openness.
  • The verb is “concentrate, set aside other things, go all out” and the object is the current Sprint's commitment: Focus.
  • The verb is “agree to, take on, deliver on” and the object is the team goal or the Sprint Goal: Commitment.
  • The verb is “trust, recognize, not blame” and the object is teammates' abilities and differences: Respect.
  • The verb is “dare to, face, admit, refactor” and the object is a hard problem, a risk or an occasion where you must say “no”: Courage.

Two similar ones are easy to mix up. Openness stresses “letting others see”, while Focus stresses “how much you put in yourself”. Commitment is “being willing to be accountable for the goal”, while Courage is “daring to face difficulties and do the right thing”.

Which value?

In a Sprint, a team finds that one feature must be reworked because of a design flaw. A team member, Daniel, speaks up about it at the Daily Scrum and tells everyone it will probably take an extra day. The team does not blame him and instead discusses how to fix it. By proactively disclosing the rework and the delay and putting progress and difficulties on the table, Daniel mainly shows Openness. Speaking up about a problem takes courage, so it also shows Courage. The team's reaction shows Respect. When a question asks for only one value, look at how it is phrased: if it asks what is “mainly” shown, find the one closest to the core of the behavior.

Worked examples

Example 1: Which three are the artifacts, exactly?

Question 1Example

A new team member asks what the “three artifacts” of Scrum are. Which answer is correct?

Show answer and explanation

Correct answer: A

A new member is learning the core makeup of Scrum and asks what the “three artifacts” are.

In 3-3-5-5, the three roles are the Product Owner, the Scrum Master and the Developers. The three artifacts are the Increment plus one backlog for the product and one for the Sprint. The five events are the Sprint and four meetings. The five values are Commitment, Focus, Openness, Respect and Courage. Artifacts are “things”: two backlogs and one Increment. The Increment is the usable result that meets the Definition of Done (a Sprint can produce several Increments), the Product Backlog is the ordered list of what the product needs, and the Sprint Backlog is the work the team selected for this Sprint and its plan. The answer is A.

Why the other options are wrong

  • B. These are the three roles, which are people, not artifacts.
  • C. These are three of the five events, which are activities, not artifacts.
  • D. The Sprint itself is one of the five events, not an artifact. The Sprint Backlog belongs in that place.

Key takeaway The artifacts are three “things”: two backlogs and one Increment. Roles, events and values each have their own category.

Variation In a different phrasing, “Which of the following is a Scrum event?”, the answer must come from the Sprint, Sprint Planning, the Daily Scrum, the Sprint Review and the Sprint Retrospective, and the Increment cannot be chosen.

Something wrong with this question?

Report an issue with this question

Example 2: Making the backlog and progress fully public: which value is this?

Question 2Example

A Scrum team makes both of its backlogs and its work progress fully public, so any team member or stakeholder can view them at any time. Which Scrum value does this mainly reflect?

Show answer and explanation

Correct answer: C

A Scrum team makes both backlogs and its progress fully public, available to any team member or stakeholder at any time. The question asks which value this mainly reflects.

The Scrum values are Commitment, Focus, Openness, Respect and Courage. The key signals are “fully public” and “can be viewed at any time”: being transparent about work and progress corresponds to Openness. Making information public also supports the three pillars of transparency, inspection and adaptation. It is the precondition for the pillar of transparency: what cannot be seen cannot be inspected or adapted. The answer is C.

Why the other options are wrong

  • A. Commitment means being willing to commit to goals and support each other. It is about responsibility, not about whether information is public.
  • B. Focus means putting your mind and abilities into the work you have committed to. It is about the degree of dedication, whereas the stem is about how open the information is.
  • D. Courage means having the courage to do the right thing and face hard problems. Making a list public is not in itself facing a hard problem, so it should not be filed under Courage.

Key takeaway Openness = work and progress are transparent to the relevant parties.

Variation If the stem said that the Developers set aside other matters and went all out on the items selected for the Sprint, the answer would be Focus. If it said the team proactively exposed a serious defect, it would lean toward Courage.

Something wrong with this question?

Report an issue with this question

Common traps

Common trap

  • The Sprint itself is an “event” and the Increment is an “artifact”. Meetings are not artifacts and people are not artifacts.
  • 3-3-5-5 is what Scrum itself consists of. Pair programming, test-driven development and the like are not in it. They belong to Extreme Programming.
  • Openness is “being transparent to the relevant parties”, and Focus is “putting your mind on the work you have committed to”. Do not mix them up just because both involve “work”.
  • The order of the five values is Commitment, Focus, Openness, Respect, Courage. In a list question, do not eliminate an option because its order differs, but every one of the words must be there.

Key point

  • 3 accountabilities: Product Owner, Scrum Master, Developers.
  • 3 artifacts: Product Backlog, Sprint Backlog, Increment.
  • 5 events: Sprint, Sprint Planning, Daily Scrum, Sprint Review, Sprint Retrospective.
  • 5 values: Commitment, Focus, Openness, Respect, Courage.

Key takeaways

  1. 3-3-5-5: three accountabilities, three artifacts, five events, five values.
  2. The Sprint is an event, and the other four events all happen within it. The Increment is an artifact.
  3. Artifacts are “things”: the Product Backlog, the Sprint Backlog and the Increment.
  4. The values: Commitment, Focus, Openness, Respect, Courage. In questions, catch the verb and the object and match them.
  5. Openness points to making things public and transparent, Focus to putting full effort into the committed work, and Courage to facing hard problems.

Lesson 3

Where Scrum Fits Among Agile Methods, and Scaling Agile

Lesson video

Lesson overview

The first two lessons finished covering Scrum itself. This lesson looks two steps outward. First, where does Scrum stand among the many agile methods, and how does it divide the work with Kanban, Lean and Extreme Programming? When a question gives a scenario, you need to pick the suitable method. Second, how do multiple teams working on the same product coordinate? That means the Scrum of Scrums and scaling frameworks. Questions on both topics follow predictable patterns, and a few accurate keywords will help you answer them reliably.

There are many agile methods: focus on what matters

There are many agile practices and methods, and you cannot learn them all, so focus on what matters. Scrum is the most widely used and is often combined with other agile methods or practices. It is one of the frameworks most frequently tested in PMP agile questions. (Lean, Kanban, Extreme Programming and the others each have their own origins and do not come from Scrum.)

PMBOK 8 plots several agile methods on one figure along two dimensions: breadth, meaning how much of the project or product life cycle the approach covers, and depth, meaning how detailed or prescriptive the guidance is. The figure includes Scrum, Kanban, Lean, Scrum of Scrums, LeSS (Large-Scale Scrum), Crystal and others. PMBOK 8 also distinguishes two terms. A method is “a systematic way of doing something, typically involving a series of steps or procedures designed to achieve a specific outcome”. A tool kit is “a collection of tools, techniques, and resources that can be used to support various methods or approaches”. PMI Disciplined Agile (DA) is an example designed to be a tool kit.

How Scrum divides the work with other methods

MethodWhat it is good atOne-line distinction
ScrumA management framework: accountabilities (traditionally called roles), artifacts, eventsFixed-length Sprints, a Product Backlog, review and retrospective
KanbanVisualizing the workflow and limiting work in progressUsually uses continuous flow and does not itself require fixed iterations
LeanEliminating waste and maximizing the value streamThinking and principles that deeply influence agile practices
Extreme Programming (XP; common exam term)Engineering practices: pair programming, test-driven development, continuous integrationCovers “how to write the code well”
Feature-Driven Development (FDD; common exam term)Build an overall model first, then plan, design and build by featureOrganizes development around the domain model and building feature by feature

Scrum prescribes the accountabilities, artifacts and events, and leaves the self-managing team to decide how the work is allocated. The events are held at the cadence of the Sprint, and the Daily Scrum is held every working day. Extreme Programming focuses on software engineering and delivery practices, with a particular emphasis on continuous feedback and built-in quality (engineering practices such as pair programming, test-driven development and continuous integration). It also includes team and delivery practices such as small releases, an on-site customer, the planning game and a sustainable pace. The two work at different levels and their principles are often complementary, so they are frequently combined. A common approach is to put Extreme Programming's engineering practices inside the Scrum framework. When a question asks about “the relationship between Scrum and XP”, choose “complementary and can be used together”, not “one contains the other” or “they contradict each other”.

How do you choose? Look at the keywords. For constantly changing requirements, a cross-functional team, fixed-length Sprints and fixed inspection opportunities such as the review and retrospective, use Scrum. If the emphasis is on visualizing the existing process and limiting parallel work, use Kanban. If the emphasis is on code-quality practices, use Extreme Programming. If the emphasis is on eliminating waste, that is the starting point of Lean.

Scaling agile: how multiple teams coordinate

When several Scrum teams develop one product at the same time, new problems appear. The teams depend on each other and must wait for each other, shared components must be kept free of conflicts, and an overall roadmap must keep everyone pointed the same way. The coordination tool here is the Scrum of Scrums (SoS). In common exam practice, each team sends a representative, and they synchronize on each team's progress and on cross-team dependencies and impediments. It is a coordination mechanism between multiple teams, and how often it meets is decided as needed.

Three points are easy to mix up:

  • It is not another name for the Daily Scrum. The Daily Scrum is a 15-minute event for a Scrum Team's Developers on every working day of the Sprint, used to inspect progress toward the Sprint Goal and adapt the Sprint Backlog as necessary.
  • Scrum does not prescribe a frequency; teams may meet on a regular cadence or as needed.
  • It is not a leadership meeting and does not give the teams direction. Its purpose is coordination.

The Scrum of Scrums, LeSS (in PMBOK 8 Figure 4-7) and SAFe (common exam term) are used for multi-team coordination or scaled implementation. DSDM (common exam term) is an agile project delivery framework that covers the whole life cycle and is not a dedicated scaling framework. Scrum and the like take the single team as the basic unit. A large organization, for example one with dozens of teams, cannot roll out agile by copying a small team's Scrum as is, nor by letting every team do its own thing. It should choose or tailor suitable scaling methods, tool kits and cross-team coordination mechanisms (such as LeSS, SAFe and the Scrum of Scrums) according to the product structure, the number of teams, the dependencies and the organizational context, without assuming that the existing hierarchy must be torn down and rebuilt.

Two teams, one membership system

The membership system of a retail chain is developed by two Scrum teams, one for the front-end mini-app and one for back-end loyalty points. The mini-app team finds that the points interface will not be available until the back-end team's next Sprint, which will slow its own progress. Each team sends one person, and they meet every Wednesday. The mini-app team explains the interface it needs, and the back-end team estimates the time and negotiates the order. This cross-team meeting is a Scrum of Scrums. After it, each team still uses its own Daily Scrum to inspect progress toward its Sprint Goal and adapt its upcoming plan, and neither replaces the other.

Worked examples

Example 1: A cross-functional team with changing requirements: which method?

Question 1Example

A cross-functional team is working on a complex project whose requirements keep changing. The team needs a management framework built around a product backlog, fixed-length iterations, and iteration review meetings and retrospectives to improve the process. Which approach should it adopt?

Show answer and explanation

Correct answer: D

A cross-functional team is doing a complex project with constantly changing requirements. A framework built around a product backlog, fixed-length iterations, and iteration reviews and retrospectives is needed. Which approach should be adopted?

The signals are “product backlog”, “fixed-length iterations”, “review meetings” and “retrospectives”. These are the core elements of Scrum (the Product Backlog, Sprints, the Sprint Review and the Sprint Retrospective): a cross-functional, self-managing team uses the rhythm of fixed Sprints to inspect and adapt, which suits complex work with changing requirements. The answer is D.

Why the other options are wrong

  • A. Kanban focuses on visualizing the workflow and limiting work in progress, with continuous flow. It does not itself prescribe fixed-length iterations or review and retrospective events.
  • B. Extreme Programming emphasizes engineering practices such as pair programming and test-driven development. It is not a management framework built around a backlog and iteration events.
  • C. Feature-Driven Development is characterized by modeling by feature and building in stages. It is not a framework built around a cross-functional team, fixed iterations, reviews and retrospectives.

Key takeaway A cross-functional team, changing requirements, and a need for fixed iterations with review and retrospective: use Scrum.

Variation If the stem said the need was to visualize the existing workflow and limit work in progress, choose Kanban. If it said the aim was to raise code quality with an emphasis on pair programming and test-driven development, choose Extreme Programming.

Something wrong with this question?

Report an issue with this question

Example 2: What kind of meeting is a Scrum of Scrums, exactly?

Question 2Example

A company plans to change its project management approach from waterfall to agile and to pilot it first on an upcoming project, and it has an agile expert train the project team. The training mentions the Scrum of Scrums meeting. Which statement correctly describes this meeting?

Show answer and explanation

Correct answer: C

A company is moving from waterfall to agile, and the training mentions the Scrum of Scrums meeting. The question asks what kind of meeting it is.

The Scrum of Scrums is a coordination mechanism between multiple teams: the agile teams under the same project or product each send a representative to synchronize progress and cross-team dependencies and impediments. How often it meets is decided by the coordination need. It is a practice of scaled agile. The answer is C.

Why the other options are wrong

  • A. The Daily Scrum is a meeting inside a single team that syncs the day's work every day. The Scrum of Scrums is for multiple teams. The two are at different levels and are not aliases.
  • B. The Scrum of Scrums has no fixed “every two weeks” rhythm. Its frequency is decided by need, and this option mistakes it for a fixed routine meeting.
  • D. Its purpose is coordination, not leadership, and it does not set direction for the teams. An agile team's direction is held jointly by the Product Owner and the team.

Key takeaway The Scrum of Scrums is a coordination mechanism between multiple teams. It is not the Daily Scrum and not a leadership meeting.

Variation If asked how a large enterprise with dozens of teams should adopt agile, the answer is to adapt a scaling framework such as SAFe or LeSS, not to copy a small team's Scrum as is.

Something wrong with this question?

Report an issue with this question

Common traps

Common trap

  • The Scrum of Scrums is a coordination mechanism between multiple teams. It is not the Daily Scrum, it is not held on a fixed two-week cycle and it is not a leadership meeting.
  • Scrum is a management framework (accountabilities, artifacts, events) and Extreme Programming focuses on software engineering and delivery practices. They are complementary, neither containing the other nor contradicting each other.
  • Kanban itself does not require fixed-length iterations and is usually characterized by continuous flow and limited work in progress. When a question mentions “fixed Sprints, review and retrospective”, choose Scrum, not Kanban.
  • When a large organization adopts agile, it cannot succeed merely by copying Scrum into every team, and it should not assume that management levels must be abolished. It tailors the approach to the product structure, the dependencies and the organizational context, and it may use a scaling framework such as SAFe or LeSS, or a cross-team coordination mechanism such as the Scrum of Scrums.

Key takeaways

  1. Scrum is the most widely used and is one of the frameworks most frequently tested in PMP agile questions. PMBOK 8 plots agile methods by breadth and depth.
  2. A method has steps. A tool kit is a collection from which several methods can draw, such as DA.
  3. Scrum is a management framework and Extreme Programming is an engineering practice. They are complementary and often used together. Kanban focuses on visualization and limiting work in progress, and Lean focuses on eliminating waste.
  4. The Scrum of Scrums is a coordination mechanism between multiple teams that synchronizes cross-team dependencies and impediments. It is not the Daily Scrum.
  5. A large organization with dozens of teams should tailor by product structure, dependencies and organizational context, and may use a scaling framework such as SAFe or LeSS, or a coordination mechanism such as the Scrum of Scrums.

This chapter has 15 questions in the full bank; the questions beyond the worked examples are practiced in the question bank. Practice this chapter.