Project Management Principles

Project Management Principles

PMP · Project Management Principles · 4 lessons · about 42 min

Part of the free PMP video course: every lesson starts with its video →

What this chapter covers

Section 3 of The Standard for Project Management in the PMBOK Guide, Eighth Edition, condenses the guiding ideas of project management into six principles: Adopt a Holistic View, Focus on Value, Embed Quality Into Processes and Deliverables, Be an Accountable Leader, Integrate Sustainability Within All Project Areas, and Build an Empowered Culture. The Seventh Edition had twelve; the Eighth Edition refined and merged them to reduce overlap, repetition and confusion. This chapter covers five of the six (sustainability has a chapter of its own), explains the nature of the principles, their relationship to the seven performance domains and their relationship to the Seventh Edition, and ends with the ethical lines a project manager must never cross.

This chapter has no formulas and no fixed calculation method. It tests judgment: you are given what a team is doing and asked which principle it reflects or violates, or what to do in a dilemma. The scenarios on empowered culture and professional ethics are highly consistent. If you hold on to the direction of "create a sense of safety, report honestly, follow the rules", you will get most of them right.

Lessons in this chapter

Chapter map

Project management principles (six; not prescriptive; complementary)

  • Proactive: Adopt a Holistic View · Embed Quality Into Processes and Deliverables
  • Ownership: Be an Accountable Leader · Build an Empowered Culture
  • Value-driven: Focus on Value · Integrate Sustainability Within All Project Areas (see the Sustainability chapter)
  • With performance domains: principles are the foundation, domains are the mechanism; all principles relate to all domains
  • With the Seventh Edition: twelve → six; tailoring moved out, optimizing risk responses moved to the Risk domain
  • Professional ethics: responsibility · respect · fairness · honesty → honest reporting, reporting violations

Chapter practice: do the core questions first, then the required questions.

Lesson 1

Nature of the Principles, Adopt a Holistic View and Focus on Value

Lesson video

Lesson overview

Section 3 of The Standard for Project Management in the PMBOK Guide, Eighth Edition, condenses the guiding ideas of project management into six principles. This lesson first answers two questions: what kind of thing a principle is, and why project management is first of all a mindset. It then covers the first two of the six principles, Adopt a Holistic View and Focus on Value. In the exam this material usually appears as scenario judgment: you are told what a team is doing and asked which principle it violates or reflects. The next three lessons cover quality and the accountable leader, empowered culture and the link to the performance domains, and professional ethics. The sustainability principle has its own chapter.

Principles are not rules, and the mindset has three dimensions

In the Eighth Edition's words, principles for a profession serve as foundational guidelines for strategy, decision-making and problem-solving. The principles of project management are not prescriptive; they are intended to reinforce the mindset and guide the behavior of people involved in projects. So a principle is not like "how to calculate the critical path", with fixed steps. It is a judgment framework: in a scenario question, ask which option fits these principles better. The principles are complementary and supplement one another, meaning that no principle contradicts another. In practice there may be instances when the principles overlap, reflecting the complex and interconnected nature of project management.

The Eighth Edition defines six principles: Adopt a Holistic View; Focus on Value; Embed Quality Into Processes and Deliverables; Be an Accountable Leader; Integrate Sustainability Within All Project Areas; and Build an Empowered Culture. Collectively, these principles describe the mindset of project management. The project management mindset is composed of three dimensions (proactive, ownership and value-driven) and six principles.

DimensionPrinciples it includesWhat it emphasizes
ProactiveAdopt a Holistic View; Embed Quality Into Processes and DeliverablesSystems thinking and appropriate levels of planning; anticipating challenges and addressing them promptly
OwnershipBe an Accountable Leader; Build an Empowered CultureThe accountability of leaders and a high-performance team culture; shared ownership and commitment
Value-drivenFocus on Value; Integrate Sustainability Within All Project AreasAlignment with organizational strategy and contributions to the community and the environment; balancing measurable success with broader sustainability goals
The three dimensions of the project management mindset and the six principles

Adopt a Holistic View

This principle involves understanding and managing projects by considering all components and their interdependencies as part of a larger system. It aligns with systems thinking, and it gives you a framework for viewing interrelationships in their full context and for seeing patterns rather than static "snapshots". A holistic view is especially important for managing complexity: viewing the project as a unified entity makes it simpler to trace problems to their origins, and it allows an interdisciplinary approach that fosters more innovative and effective solutions.

In one sentence, the test is this: aim for the best result for the whole, not for the best result in one part. Locally attractive metrics can hide damage to the whole, and that is the classic mistake the holistic view guards against. The Eighth Edition adds that the principle interacts with every performance domain. In Scope it helps prevent scope creep; in Schedule it considers the interdependencies among all activities; in Risk it identifies and manages risks across all domains; in Stakeholders it brings the perspectives of all parties into decisions.

Example: watching only your own metric

On a pipe renovation project in an older residential district, the civil works crew wanted to hit its "excavation completed" target early. It dug a whole section before the gas and telecom lines had been relocated. The utility companies could not keep up, and trenches that had already been dug had to be backfilled and dug again. The whole job took three weeks longer than planned. The civil crew's number looked good, yet the project as a whole fell behind. When assessing status, the project manager should map the dependencies among the trades and use the overall goal to correct the pace of each part, rather than letting each crew report its own metrics.

Focus on Value

Value, also referred to as project value, is the ultimate success indicator and driver of projects. Value can be described and assessed using either measurable metrics, such as return on investment, or qualitative observations such as testimonials and societal benefits. All projects exist to pursue target organizational objectives that are worth more than what is invested in pursuit of those objectives. The business case and organizational strategy give the project team the information it needs to make decisions. Desired outcomes should be clearly described, iteratively assessed, and updated throughout the project life cycle using quality gates, feedback loops, and regular reviews. If misalignment persists or the project is unlikely to deliver the intended value, it may be best to terminate the effort.

The key to focusing on value is shifting attention from deliverables to intended outcomes. A deliverable is an output; an outcome is what results once the output is used. While a deliverable may support the intended project outcome, it may not fully achieve the project's vision or purpose. The Eighth Edition's example: the software is the output of the project, but it does not enable productivity by itself; adding a new deliverable, such as training in the use of the software, can enable a higher-value outcome. So project teams, stakeholders, and in particular team members, should understand both the deliverable and the intended outcome from the deliverable.

Example: delivered, but nobody uses it

A community health center launched a mini-program that lets elderly patients with chronic conditions look up their last test results before a follow-up visit. It was delivered on time and passed acceptance. Three months later fewer than one in ten patients used it: most older patients did not have smartphones, and their families did not know how to link accounts. The project's output was complete, but its outcome was not achieved. Only after on-site coaching by community doctors and printed QR-code cards were added did the time spent answering questions at follow-up visits actually fall.

Focusing on value does not mean doing more. It depends on continuous scope management to prevent scope creep and gold plating, so that all the work serves the intended value, together with a continuous assessment of financial performance against the business case. When you explain value to decision makers, convert the benefits into the measures they care about, such as hours saved, losses reduced and payback period.

Worked examples

Example 1 Do the principles "conflict"?

Question 1Example

PMLyceum’s PMO has just run training on the Eighth Edition of The Standard for Project Management. At the review meeting, a colleague says: “Focus on Value tells us to cut costs, while Integrate Sustainability Within All Project Areas tells us to spend more. The two principles contradict each other, so we can only follow one.” How should project manager Lena respond?

Show answer and explanation

Correct answer: C

The PMO has just finished training on the Eighth Edition. At the review meeting someone argues that one principle calls for cutting cost and another for spending more, so only one can be followed. The project manager has to respond to that claim.

The problem is the premise itself: “they contradict, so choose one” is wrong. The Eighth Edition explains that principles provide foundational guidance for strategy, decision-making and problem-solving, and that they are not prescriptive; they are intended to reinforce the mindset and guide behavior. The principles are complementary and supplement one another, so no principle contradicts another, and when they overlap in practice, that reflects the complex and interconnected nature of project management. Focusing on value means obtaining value for what is invested, and sustainability concerns long-term value. How to balance them in a specific case depends on the context of the organization, the project and the stakeholders; the answer is not to delete one of them. The answer is C.

Why the other options are wrong

  • A. This treats the principles as rules to follow one by one, which contradicts “not prescriptive”, and it invents a priority (“Focus on Value takes precedence”) that does not exist among the principles.
  • B. The six principles stand side by side. Even two principles in the same dimension have no order of priority and no ranking that lets one be dropped; dropping one breaks the integrity of the mindset.
  • D. Overlap is not a defect. It is normal, and the principles do not need revising before they can be used; they are meant to be applied flexibly in each organization’s own context.

Key takeaway Principles are a direction for thinking and behavior, not rules; they complement one another without contradiction, and they may overlap.

Variation If the question asked how many mindset dimensions the six principles fall into and which one sustainability belongs to, the answer is three dimensions, with sustainability and Focus on Value both in the value-driven dimension. If an option says the six principles have an order of priority, rule it out in the same way.

Something wrong with this question?

Report an issue with this question

Example 2 Local optimization and the holistic view

Question 2Example

PMLyceum’s data center migration project is in the execution stage. While assessing status, the project manager finds that the network team, to make its own cutover metric look good, moved the entire switchover window earlier. This disrupted the go-live preparation of the application and test teams, and the overall go-live date is now at risk of slipping. This is a classic case of local optimization. What should the project manager do?

Show answer and explanation

Correct answer: B

The data center migration project is in the execution stage. During a status assessment, the project manager finds that the network team disrupted other teams for the sake of its own metric, and the overall go-live date is threatened. The question asks what the project manager should do, and the key to the judgment is the principle Adopt a Holistic View.

The stem names “local optimization”, and the signal is that one team’s improved metric is paid for by other teams and by the overall date. The holistic view requires managing all components and their interdependencies as part of a larger system and aiming for the best result for the whole, not for a part. So the assessment should start from the whole project, see the dependencies among the teams clearly, and make local goals serve the overall goal, including re-planning the switchover window together with the teams if necessary. The answer is B.

Why the other options are wrong

  • A. Checking only each team’s own metrics is exactly what produces local optimization: every team can “meet its metric” while the whole project is still damaged. This approach does no integration at all.
  • C. Asking the network team to match the others “exactly” is still a local adjustment. It analyzes no dependencies and may give up time that could have been gained.
  • D. Handing the separate statuses to the sponsor means the project manager gives up the integration responsibility. The project manager should ensure that team information and dependencies are integrated in the assessment rather than passing the overall judgment to the sponsor.

Key takeaway When assessing status, look at the dependencies among the parts first and then at each part’s own metrics; the parts serve the whole.

Variation If the scenario were changed to “one team’s heavy use of the shared test environment affects the other teams”, the thinking is the same: coordinate resources and dependencies from the standpoint of the whole. If the question asks “which principle applies”, the answer is Adopt a Holistic View.

Something wrong with this question?

Report an issue with this question

Common traps

Common trap

  • A principle is not a rule. It is not a set of clauses to execute one by one, it has no order of priority, and you cannot drop one of them.
  • Overlap among principles is normal. It is not a defect in the principles, and nothing needs to be revised first.
  • Delivering on scope, schedule and budget does not equal project success: the Eighth Edition looks at the value obtained for what was invested.
  • Value is not the same as revenue. Social benefits and the customer's perceived benefits are value too, whether measured quantitatively or described qualitatively.
  • A holistic view does not mean every team moves in lockstep. It means seeing the dependencies clearly and letting local goals serve the overall goal.

Key takeaways

  1. Principles provide foundational guidance for decisions and are not prescriptive; the six principles complement one another without contradiction, and they may overlap.
  2. The three dimensions of the mindset: proactive (holistic view, quality), ownership (accountable leader, empowered culture), value-driven (focus on value, sustainability).
  3. Adopt a Holistic View: manage all components and their interdependencies as part of a larger system, and aim for the best result for the whole.
  4. Focus on Value: move attention from deliverables to intended outcomes, keep checking against the business case, and consider terminating the project if misalignment persists.
  5. Focusing on value relies on continuous scope management to prevent creep and gold plating; it does not mean adding features.

Lesson 2

Embed Quality Into Processes and Deliverables; Be an Accountable Leader

Lesson video

Lesson overview

This lesson covers the third and fourth of the six principles. Embed Quality Into Processes and Deliverables answers where quality comes from; Be an Accountable Leader answers who takes the lead on a project and how. The two principles often appear together in the exam: when a team reports inaccurately or risk scores are distorted, the problem looks like one of quality or risk, but the root cause is often that the leader has not created an environment in which people dare to tell the truth. The previous lesson covered the nature of the principles; the next covers empowered culture.

Embed Quality Into Processes and Deliverables

The Eighth Edition defines quality as the degree to which a set of inherent characteristics of a project deliverable or process helps to meet or exceed the project's target objectives. Embedding quality includes the ability to satisfy customers' and stakeholders' stated or implied needs as a matter of course, at or above target levels of efficiency. The quality of the deliverable and of the processes used to achieve it is measured by conformance to acceptance criteria, the definition of done (DoD), fitness for use, and overall efficiency. Acceptance criteria are the conditions a deliverable must meet before it is accepted. In adaptive projects the definition of done gives the team a shared standard for judging whether a work item or increment is complete. The two are related but not interchangeable. Project teams can pursue the target quality thresholds by providing training, conducting inspections, and performing testing, and project activities and processes are evaluated through reviews and audits. All of these aim to identify and prevent errors and defects.

Foundational to embedding quality is continuous improvement and waste elimination. Continuous improvement lets teams proactively identify areas for enhancement in both deliverables and workflows, and waste elimination streamlines processes and conserves resources. The Eighth Edition lists quality dimensions, "including but not limited to" the following nine, which apply to both deliverables and processes: performance, conformity, reliability, resilience, satisfaction, uniformity, efficiency, sustainability and compliance. Each is expressed as a question. For example, resilience asks: "Can the deliverables and supporting processes cope with unforeseen failures and recover quickly?" Uniformity asks: "Do the deliverables and processes demonstrate parity across similar outputs or workflows?"

In essence, "embedding" turns quality from an inspection carried out afterward into a building activity that runs through the whole process. The Eighth Edition mentions a "shift-left" strategy: prioritize quality practices early in the life cycle wherever possible, and build product quality reviews into milestones. A one-line memory aid: quality is designed and built in, not inspected in, and preventing defects works better than finding them afterward.

Example: a quality inspector joins the design review

A food plant was refitting its packaging line. The original approach was to install the line and then have the quality department run a batch inspection, sending the line back for rework if seals were not tight. The project manager changed the approach. Quality inspectors were invited to the design review, and seal strength and foreign-object detection rate were written into the acceptance criteria. At the prototype stage the team ran a small trial sealing batch every week, and the project moved to the next milestone only when the data met the criteria. The large rework effort before delivery almost disappeared. Quality requirements had moved forward into the design and the process.

Predictive and adaptive projects

The purpose of quality activities is the same in both settings: make sure the deliverable meets the target objectives, reduce waste and raise the probability of achieving the intended outcome. The difference is how stable the acceptance criteria are. In a project whose requirements are clear up front, the criteria are relatively stable. In a project where requirements are progressively elaborated and delivered in increments, the criteria may in some cases need to be updated and refined regularly as the project evolves, and then checked again at acceptance to confirm they are still valid.

Be an Accountable Leader

Projects create a unique need for effective leadership. They often involve multiple organizations, departments or vendors that do not interact on a regular basis, and the stakes and expectations are often higher than in regular operations. A broader array of managers, executives and other stakeholders may try to influence the project, which creates more confusion and conflict. As a result, effective leadership behaviors are found more frequently, and from more people, on high-performing projects. Accountable leadership is about being responsible and taking ownership of the project's target business objectives, as well as the actions taken and the decisions made.

An accountable leader has five key characteristics: integrity, honesty and fairness; self-awareness; respectfulness, humility and availability; flexibility and adaptability; and shared leadership. Respectfulness, humility and availability form the basis for the concept of servant leadership: leaders should be open to feedback and should work for the team, supporting their needs and removing barriers when possible. Leadership is different from authority. Authority is the position of control given to individuals within the organization, whereas leadership is about inspiring and motivating others by leading by example. Leadership is also not exclusive to any specific role: at different moments of the project, a team member, stakeholder or specialist may take the leadership seat.

A leader should also foster an environment of psychological safety, where people can speak up, including raising doubts and criticism, without fear of retaliation. Common exam practice describes psychological safety in four stages: inclusion safety, learner safety, contributor safety, and challenger safety.

Example: two subcontractors and one tower crane

On an office tower project, the structural and curtain-wall subcontractors argued over crane time slots, and each cited its contract to claim priority. The project manager did not split the difference, and did not just quote the contract clauses. She brought the two site leads and the supervising engineer together, found where the curtain-wall panel delivery window clashed with the structural pour dates, and agreed a staggered schedule that was written into the weekly plan. The conflict was resolved, and more importantly the friction that would have undermined quality and efficiency was removed.

Worked examples

Example 1 Where does quality come from?

Question 1Example

On project quality management, which approach best fits the principle Embed Quality Into Processes and Deliverables?

Show answer and explanation

Correct answer: B

The question asks which approach best fits the principle Embed Quality Into Processes and Deliverables.

“Embedding” means building the target quality requirements into the planning and the process itself. Through training, inspections and testing, and through reviews and audits, the team identifies and prevents errors and defects and reduces rework and waste. Quality comes from planning and prevention, not from a final inspection. Only B shows prevention first. The answer is B.

Why the other options are wrong

  • A. Concentrating inspection before delivery, with dedicated staff checking item by item, finds mistakes after the fact. The defects already exist, and rework is typically costlier than early prevention and detection, which is the opposite of prevention.
  • C. Quality requirements are set from acceptance criteria and stakeholder needs, and they cannot be relaxed step by step under cost pressure. That goes against the purpose of embedding quality into the process.
  • D. Pushing quality problems to closing for a single rework lets defects accumulate and multiplies rework, which violates the requirement to detect and prevent early.

Key takeaway Quality is built into the design and the process, not inspected in; prevention works better than inspection after the fact.

Variation If asked how acceptance criteria are handled in an adaptive project, the answer is that when the project evolves through experimentation, they may need to be updated and refined regularly and checked again for validity at acceptance. If asked from which two aspects quality is viewed, the answer is deliverables and processes.

Something wrong with this question?

Report an issue with this question

Example 2 Everyone says "all fine" at the status meeting

Question 2Example

At the weekly meeting of PMLyceum’s logistics route optimization project, nearly every team reports that “everything is fine”. In follow-up conversations after the meeting, the project manager learns that two tasks are clearly behind schedule, and that members did not want to say so in the meeting because they feared being singled out and criticized. What should the project manager do FIRST?

Show answer and explanation

Correct answer: A

At the weekly meeting every team says “everything is fine”, yet after the meeting two tasks turn out to be late, and members feared being singled out. The question asks what the project manager should do first, and it turns on the accountable leader creating a psychologically safe environment.

The signal is “did not want to say so in the meeting, feared being singled out and criticized”: the root of the concealment is a lack of psychological safety, not a lack of checking. An accountable leader leads by example and fosters an environment where people can speak freely and report problems frankly without fear of retaliation, so that problems surface early and are solved together. Change the environment first, and only then will the information be true. The answer is A.

Why the other options are wrong

  • B. Daily written statuses with item-by-item checking only add monitoring burden. Members can still polish their reports, and the root problem, that people are afraid to speak, is untouched.
  • C. Having the owners fix things privately leaves the team’s habit of reporting only good news unchanged, and the problem is still not seen and solved by the team together.
  • D. Naming people and threatening their reviews makes members more afraid of exposing problems and strengthens the motive to conceal. It is the opposite of psychological safety.

Key takeaway The earlier a problem surfaces the better. First make it safe for members to tell the truth, and only then talk about checking and performance reviews.

Variation If the same scenario were changed to “every score in the risk register is low”, the answer is still to build a culture of candid risk reporting. If asked about the purpose of creating psychological safety, the answer is to let members speak and report problems frankly without fear of retaliation.

Something wrong with this question?

Report an issue with this question

Common traps

Common trap

  • Quality applies not only to deliverables but also to processes; both are protected through prevention.
  • Quality is measured against acceptance criteria, the definition of done, fitness for use and efficiency. It is not a matter of subjective feeling, and it must not be loosened at will because of cost pressure.
  • Concentrating inspection just before delivery is checking after the fact. Embedding quality means building it into the planning and the process.
  • Being accountable does not mean being domineering or pressing people with authority. It means leading by example and owning the outcome.
  • When members report only good news, first deal with whether people dare to speak, rather than tightening monitoring, naming individuals or cutting performance ratings.
  • Adapting your leadership style flexibly does not mean giving up your core values.

Key takeaways

  1. Quality is the degree to which characteristics meet or exceed the target objectives; it covers both deliverables and processes, and its foundation is continuous improvement and waste elimination.
  2. Quality dimensions (the Eighth Edition lists these, "including but not limited to" nine): performance, conformity, reliability, resilience, satisfaction, uniformity, efficiency, sustainability, compliance.
  3. Quality comes from prevention and shifting left, not from a final inspection. In adaptive projects the acceptance criteria may need regular updating and refining as the project evolves, and their validity is checked at acceptance.
  4. An accountable leader takes responsibility for objectives, actions and decisions. The five characteristics: integrity, honesty and fairness; self-awareness; respectfulness, humility and availability; flexibility and adaptability; shared leadership.
  5. Leadership is different from authority and is not exclusive to the project manager; psychological safety lets problems surface early.

Lesson 3

Build an Empowered Culture; Principles, Performance Domains and the Seventh Edition

Lesson video

Lesson overview

The previous two lessons covered four principles: holistic view, value, quality and accountable leader. This lesson first covers Build an Empowered Culture, and then places the six principles in the wider body of knowledge: how the principles relate to the seven performance domains, and where the twelve principles of the Seventh Edition went in the Eighth. The empowered-culture scenarios are almost always about members who "do not dare to speak, try or report", and the direction of the answer is highly consistent. The relationships and mappings are classic concept-discrimination questions, and a few conclusions are enough to remember.

Build an Empowered Culture

To develop an empowered project culture, the project environment should promote mutual trust among stakeholders and project team members. There should be full clarity on individual roles, responsibilities, team agreements, and guiding processes. These factors enable individuals to work together and provide synergistic effects from their interactions. "Empowered" literally means given the ability and the authority: let the team decide what the team should decide, and do not micromanage. Micromanagement is often a two-way problem: the leader does not trust the team, and the team may not be reporting in a timely and transparent way. Delegation also has levels. Routine matters can be delegated to the team within its established authority. Major matters beyond the team's authority, such as large investments, should be submitted through governance and escalation mechanisms to the person or body with the appropriate decision authority (in exam questions this is commonly senior management).

The Eighth Edition lists five areas in which an empowered culture enables successful project execution:

  • Diversity. A diverse project team can enrich the project environment to create a more inclusive space by bringing together different perspectives. Members may be internal staff, contracted contributors, volunteers or external third parties, and conflicts have to be managed efficiently.
  • Process definition. Project teams should define processes that enable the completion of tasks and work assignments, and engage other stakeholders to understand, consider, communicate and respond to their interests, needs and opinions.
  • Interpersonal skills. Team members and stakeholders should develop a set of interpersonal skills such as initiative, integrity, honesty, collaboration, respect, empathy and confidence.
  • Knowledge of organizational structures. Being aware of the various configurations and relationships among the components of project tasks and organizational procedures; project teams tailor and employ suitable frameworks.
  • Team agreements. A set of behavioral parameters and working norms that are established by the project team and upheld through individual and team commitments. These agreements should be created at the beginning of a project.

Remote and virtual teams face heightened challenges due to varying work styles, time zones, and the absence of in-person interaction. An empowered culture gives all team members and stakeholders the opportunity to build and collaborate in effective and constructive ways, solving differences and managing conflicts proactively.

Example: ground rules for a team across time zones

A cross-border e-commerce platform project had developers in Chengdu, designers in Shenzhen and a vendor in Poland. Review meetings were always missing someone, and decisions were often overturned. At the start of the project, the whole team wrote a team agreement together: a fixed two-hour overlap window every Tuesday and Thursday for meetings; a rule that review decisions are recorded in the meeting minutes and take effect if no one objects within three days; and a right for members to decline meetings that have no agenda. The team created and maintains the agreement itself, and overturned decisions dropped noticeably. The agreement was not issued by the project manager, and that is the key to why it worked.

Principles and performance domains

Performance domains represent the mechanics of project management, and the principles are the foundation of the performance domains. The Eighth Edition's performance domains are Governance, Scope, Schedule, Finance, Stakeholders, Resources and Risk. (There is no separate quality performance domain in the Eighth Edition. Quality and verification of deliverables belong to the Scope domain and are handled through the Monitor and Control Scope and Validate Scope processes; Manage Quality Assurance belongs to the Governance domain.) All the principles relate to all the performance domains, though some are connected more strongly than others. The Adopt a Holistic View principle is supported by all performance domains. Embed Quality Into Processes and Deliverables and Focus on Value are primarily addressed within the Governance, Scope, Risk, Schedule, Finance and Stakeholders domains. Be an Accountable Leader intersects with the Governance, Stakeholders and Risk domains. Integrate Sustainability Within All Project Areas and Build an Empowered Culture are relevant across all performance domains.

How the Seventh Edition's twelve principles map to the Eighth Edition

The Eighth Edition summarizes the community feedback on the Seventh Edition's twelve principles as follows: the principles should be more actionable, more focused, and overlap less. To achieve this, principles were merged, refined or moved out, as follows.

Seventh Edition principleWhere it went in the Eighth Edition
Navigate Complexity; Recognize, Evaluate, and Respond to System InteractionsMerged into "Adopt a Holistic View"
Effectively Engage With Stakeholders; Focus on Value; Embrace Adaptability and Resiliency; Enable Change to Achieve the Envisioned Future StateMerged into "Focus on Value", with the stakeholder part carried by the Stakeholders performance domain
Build Quality Into Processes and DeliverablesRefined into "Embed Quality Into Processes and Deliverables"
Create a Collaborative Project Team EnvironmentRefined into "Build an Empowered Culture"
Demonstrate Leadership Behaviors; Be a Diligent, Respectful, and Caring StewardMerged into "Be an Accountable Leader"
Tailor Based on ContextMoved to the Tailoring section; no longer a principle
Optimize Risk ResponsesMoved to the Risk performance domain; no longer a principle

By this table, twelve became six. "Integrate Sustainability Within All Project Areas" has no separate principle of its own in the Seventh Edition, and it is a highlight of the Eighth. Hold on to two points when judging: tailoring and optimizing risk responses are no longer principles, and the number of principles is six, not seven.

Worked examples

Example 1 Members will not report risks

Question 1Example

On PMLyceum’s supply chain system upgrade project, the project manager notices that developers who find a risk are reluctant to report it, fearing they will be held responsible, and the problem is usually exposed passively only after it blows up. What should the project manager do FIRST?

Show answer and explanation

Correct answer: A

On the supply chain system upgrade project, developers who find a risk do not want to report it and the problem is exposed only after it erupts. The question asks what to do first, and the basis for the judgment is the trust and psychological safety requirements in Build an Empowered Culture.

The key signal is “fearing they will be held responsible”: the members are not failing to report because of ability, but because of a lack of trust and safety. An empowered culture requires an environment that promotes trust, so the project manager first creates an atmosphere of psychological safety and sets up a reporting channel that does not assign blame to individuals, so that risks are spoken about while they are still small. The answer is A.

Why the other options are wrong

  • B. Cutting ratings and naming names is punishment. Members will fear exposing problems even more, and the concealment will only get deeper.
  • C. Surprise spot checks are a monitoring measure. They do nothing to remove members’ worries and in fact damage trust.
  • D. Handing a cultural problem inside the team to functional managers is passing the buck. For emotional and attitude issues like this, the project manager should first talk with the people and improve the environment personally.

Key takeaway When members hide problems, first solve whether they dare to speak, not punishment, monitoring or handing it off.

Variation If the scenario were “the team does not dare try new methods for fear of failure”, the answer becomes allowing small-scale experiments and lowering the cost of failure. If it were “a new member is interrupted in meetings”, it becomes setting a team agreement and inclusive rules for discussion.

Something wrong with this question?

Report an issue with this question

Example 2 Is "tailoring" the seventh principle?

Question 2Example

Project manager Daniel used to prepare for exams and run projects using the twelve principles of the Seventh Edition, and his company has now switched to the Eighth Edition. At a team sharing session he says: “‘Tailor based on context’ should be a seventh principle and be added to the list of six.” Which of the following corrects him most accurately?

Show answer and explanation

Correct answer: B

The project manager used to work with the Seventh Edition’s twelve principles, and the company now uses the Eighth Edition. He argues that “tailor based on context” should be added as a seventh principle. The question asks how to correct this, which depends on where the Seventh Edition principles went in the Eighth.

The Eighth Edition refined the twelve principles into six, mainly to reduce overlap. “Tailor Based on Context” was migrated to a dedicated Tailoring section and is no longer a principle, while “Optimize Risk Responses” was migrated to the Risk performance domain. So tailoring has no place in the list of principles, and the principles remain six. The answer is B.

Why the other options are wrong

  • A. What was merged into “Adopt a Holistic View” were “Navigate Complexity” and “Recognize, Evaluate, and Respond to System Interactions”. Tailoring was not among them.
  • C. Effectively Engage With Stakeholders, Focus on Value, Embrace Adaptability and Resiliency, and Enable Change to Achieve the Envisioned Future State were mapped to the Focus on Value principle plus the Stakeholders performance domain. Tailoring was not among them.
  • D. What moved into the Risk performance domain was “Optimize Risk Responses”, not tailoring. The two went to different places and cannot be listed together.

Key takeaway Tailoring moved out into a separate section, and optimizing risk responses moved into the Risk performance domain; neither is a principle any more.

Variation If asked which Seventh Edition principles were merged into “Be an Accountable Leader”, the answer is Demonstrate Leadership Behaviors and Be a Diligent, Respectful, and Caring Steward. If asked how many principles the Eighth Edition has, the answer is six.

Something wrong with this question?

Report an issue with this question

Common traps

Common trap

  • Empowerment is not letting things drift. Authority is delegated within a framework of clear roles, responsibilities, team agreements and processes, and major matters beyond the team's authority go to the person with authority through governance.
  • A team agreement is created and maintained by the team at the start of the project. It is not issued unilaterally by the project manager.
  • When members do not report or innovate because they fear being blamed, first create psychological safety and lower the cost of trying. Do not use punishment, surprise spot checks or hand the matter to the functional manager.
  • When a member has an emotional or attitude problem, the project manager first talks with the person and involves the team; the first move is not to escalate it to the sponsor.
  • "All principles relate to all performance domains." Do not choose an absolute statement such as "only the holistic view relates to all domains".
  • Tailoring and optimizing risk responses are no longer principles. They went to different places, so do not list them together or fold them into another principle.

Empowered culture and the neighboring principle

Be an Accountable Leader is about the leader's own accountability and leading by example. Build an Empowered Culture is about the team's environment: trust, clear roles, team agreements, diversity and inclusion. The first is "what the person leading does"; the second is "what environment the team works in".

Key takeaways

  1. Empowered culture: build trust, clarify roles, responsibilities, team agreements and processes, so that individuals can work together and create synergy.
  2. Five areas: diversity, process definition, interpersonal skills, knowledge of organizational structures, team agreements; the team creates its agreement at the start of the project.
  3. When members do not dare to speak or try, first create psychological safety and lower the cost of trying. Do not punish or tighten monitoring.
  4. Principles are the foundation of the performance domains, and the domains are the mechanism of the principles; all principles relate to all domains, with differing strength.
  5. Twelve principles were merged and refined into six; tailoring moved out, and optimizing risk responses moved into the Risk performance domain.

Lesson 4

Professional Ethics and Professional Conduct

Lesson video

Lesson overview

The earlier lessons covered the principles themselves. This lesson covers the bottom line of how the principles show up in personal behavior: professional ethics. The Eighth Edition lists "integrity, honesty, and fairness" among the key characteristics of an accountable leader, says these values are required of all team members, and says people demonstrate the moral principles that guide their decisions, particularly in tough situations. Ethics questions in the exam are very consistent. The stem presents an awkward situation, and among the options there is always a tempting "handle it quietly" or "go along with it" choice, while, in common exam practice, the best answer is to be honest, be appropriately transparent and follow the proper procedure. (The principles are not prescriptive, and transparency has to be balanced against confidentiality duties and the specific situation.) This lesson sets out an order of judgment (common exam practice).

Four values

The professional ethics of project management professionals are usually summed up in four values: responsibility, respect, fairness and honesty. These match Figure 3-5 of the Eighth Edition, which says that "Leaders demonstrate responsibility, respect, fairness, and honesty", and they are also the common summary of PMI's Code of Ethics and Professional Conduct. Section 3.6 of the Eighth Edition lists "integrity, honesty, and fairness" among the characteristics of an accountable leader. These values are the minimum bottom line for a project manager, and the standard used most often to judge scenario questions.

  • Responsibility: take ownership of your decisions, actions, and the tools and resources you use, including using only authorized software and data and following contracts and regulations.
  • Respect: respect every team member and stakeholder, stay open to different cultures and different opinions, and do not humiliate people or call them out in public.
  • Fairness: treat everyone impartially, do not show favoritism or pursue personal gain in decisions, and disclose and step aside from any conflict of interest.
  • Honesty: keep project information truthful and transparent, do not dress up data, do not present information selectively, and do not conceal facts that affect others' interests.

Example: asked to "lower the risk a bit"

A smart-campus project was approaching its approval review. The sponsor told the project manager: "Change the high data migration risk in the risk register to medium for now, and restore it after the review." The change had nothing to do with the contract; it was only meant to make the review go smoothly. The project manager cannot go along with it. The risk is real, and dressing it up would conceal facts from the review committee, which violates honesty. The sound approach is to explain the consequences of the change to the sponsor and recommend presenting the risk and its response plan honestly in the review materials, so the committee can decide on the basis of true information.

How to judge an ethics scenario

The common exam practice is to think in the order below, and each step corresponds to a type of option you often see.

  1. Are the facts clear? If you have only heard something and have no evidence, verify with the people involved first and then decide the next step. Do not suspend, discipline or publicly accuse anyone on rumor.
  2. Is anyone being kept in the dark? If you find that a deliverable cannot meet the customer's real needs, or that schedule or quality data do not match reality, inform the stakeholders honestly and negotiate. Do not quietly fix it or hide it for the sake of a bonus or face.
  3. Is there an improper instruction? When an instruction from the sponsor, customer or a superior violates honesty, fairness or the law, decline politely but clearly, explain why, and use formal channels. An example is a sponsor who asks you to bypass the procurement process and buy directly from a related party.
  4. Is there a conflict of interest or a confidentiality issue? When a personal interest is involved, disclose it and step aside. Do not reveal confidential information learned through your role to unrelated people, and do not use it for gain.
  5. Does it involve breaking the law or the rules? When you find illegal conduct or a serious breach of professional ethics, report it promptly and honestly to the person with authority to deal with it. Do not treat it as a mere work mistake, do not make a final determination yourself, do not run an investigation beyond your role, and do not pass it to someone else. Within your authority, verify the necessary facts and preserve the information; when the conditions for reporting are met, report promptly to the person with authority.

Example: the bid evaluator is the supplier's cousin

Before the bid evaluation for a hospital information system procurement, the project manager discovered that one of the invited technical evaluators was the cousin of the head of a bidding supplier, and the evaluator had not disclosed this. The project manager should record the situation and report it honestly to the person in charge of procurement, ask the evaluator to step aside or be replaced, and, if necessary, rerun the evaluation. The project manager should not let it go on the grounds that "he will score fairly anyway", nor talk privately to the evaluator about terms. Fairness is not only a fair result; it also has to look fair, so that every party can trust the evaluation procedure.

This order is not a trick for the exam alone. The Eighth Edition stresses that the decisions of a leader with integrity and fairness are focused on the common good, helping to build trust with stakeholders. An ethical lapse often spends all of that trust at once, which is why in the exam "honesty" almost always takes priority over "efficiency" or "relationships".

Worked examples

Example 1 The deliverable meets the contract but not the real need

Question 1Example

PMLyceum signs a software development contract with a supermarket chain. The contract says that if the work is accepted earlier than the agreed date, the customer will pay an early-completion bonus. Near the end of the project, a test engineer reports to the project manager that the inventory module fully meets the acceptance terms written in the contract but cannot support the stocktaking function the stores actually need. If that function is added, the project cannot be accepted early. What should the project manager do?

Show answer and explanation

Correct answer: D

A software development contract carries an early-acceptance bonus. Before closing, the team finds that the inventory module meets the acceptance terms but not the stocktaking function the customer’s stores really need, and adding it would forfeit the bonus. The question asks what the project manager should do, and the basis for the judgment is the requirements on honesty, transparency and professional ethics.

The logic is that meeting the terms on paper is not the same as meeting the customer’s real needs, and adding the function would cost the company its bonus, which is exactly where the temptation lies. The honesty value in professional ethics requires honest disclosure of facts that affect the customer’s interests, and not avoiding them because of a bonus. So the project manager should explain the situation to the customer and negotiate a way forward acceptable to both sides, such as adjusting the acceptance date, the bonus conditions, or delivering in phases. The answer is D.

Why the other options are wrong

  • A. The project manager knows the module cannot meet the customer's real need, yet accepts it early under the contract terms without first telling the customer and postpones the known gap into a later change. That withholds information that affects the customer and is dishonest. The acceptance date, the bonus conditions and the arrangements for adding the function should be negotiated with the customer first, so A is wrong.
  • B. Blaming the customer for the delay and bargaining for the bonus puts the company’s own interest first before the problem has even been disclosed, and it does not solve the functional gap.
  • C. Not telling the customer and quietly pulling other resources to build the function conceals the facts from the customer and may drag down other work. It only moves the problem elsewhere.

Key takeaway When you find a deliverable cannot meet the customer’s real needs, first tell them honestly and negotiate; do not conceal it or fix it quietly for the sake of a bonus.

Variation If the bonus terms matched the contract’s acceptance terms exactly and the customer’s needs were already met, there is no ethical conflict and the work is accepted normally under the contract. If the scenario were that the customer asks you to make the schedule data look better, the choice is likewise to report honestly and decline.

Something wrong with this question?

Report an issue with this question

Example 2 A member is accused of leaking confidential information and the team wants the person removed

Question 2Example

On an ERP implementation project, a team member reports that a key team member disclosed another member’s confidential information to management, which may violate professional ethics requirements, but the matter has not been verified. At the team meeting, some members demand that this key member be removed from the team. What should the project manager do NEXT?

Show answer and explanation

Correct answer: D

On an ERP implementation project, someone alleges that a key member disclosed another member’s confidential information to management, and at the team meeting some people demand his removal. The question asks what the project manager should do “next”. For suspected breaches of professional ethics, the principle is to verify first and handle afterwards.

Hold on to the gap between “alleged to have violated” and “facts not yet clarified”. The respect and fairness values in professional ethics call for not disciplining anyone on rumor and not deciding in haste under team pressure; an accountable leader first learns the facts and then decides. So the project manager’s next step is to talk with this key member and clarify what happened, and then decide the follow-up measures on the verified result, avoiding losses to the team through a misunderstanding. The answer is D.

Why the other options are wrong

  • A. Convening the team to discuss and decide forms a collective view on how to handle it without verifying the facts. That easily turns into collective blame of an individual, and it also avoids the project manager’s own responsibility.
  • B. Asking human resources for a solution pushes onto someone else the fact-finding that the project manager should do first, and it looks like not taking the initiative. Human resources can take part after verification.
  • C. Suspending the member before the facts are clear is premature punishment. If it turns out to be a misjudgment, the harm to the individual and to the team is hard to undo.

Key takeaway When the team demands action against someone, the project manager first verifies the facts with the person concerned and then decides how to handle it.

Variation If verification confirms that he did disclose confidential information, report and handle it honestly to the person with authority according to organizational rules and professional ethics. If the member has clearly admitted illegal or seriously improper conduct, the project manager does not need to run a full investigation personally; preserve the facts and report to the appropriate person or department with authority under organizational policy.

Something wrong with this question?

Report an issue with this question

Common traps

Common trap

  • Under pressure, honesty comes first. Do not dress up data or conceal risks because the sponsor asks or because it would be less trouble.
  • "The contract terms are met" does not mean you can stay silent. If you know the deliverable cannot meet the customer's real needs, tell them honestly and negotiate.
  • When you find illegal conduct, a serious breach of professional ethics, or conduct that meets the organization's escalation conditions, the project manager should promptly and honestly report it to the person with authority to deal with it. Other violations should be corrected and handled promptly according to organizational policy and your authority, and escalated if necessary. Asking the person involved to report it, investigating beyond your authority, or passing the problem to someone else does not count as meeting the duty. Necessary verification within your authority is fine, but once the conditions for reporting are met you must report promptly.
  • Verify before you discipline. When the team demands action against a member, first confirm the facts with that person and then decide. Do not suspend the person or announce it publicly first.
  • Infringement in outsourced work: stop using the infringing part first and hold the supplier responsible under the contract. It is neither "not my problem" nor "the company pays first and that settles it".

Key takeaways

  1. The four values of professional ethics are responsibility, respect, fairness and honesty (they match Figure 3-5 of the Eighth Edition and are also a common summary of PMI's Code of Ethics and Professional Conduct; Section 3.6 cites "integrity, honesty, and fairness"). They are the minimum bottom line and the standard for judging scenario questions.
  2. Report honestly: do not dress up data, schedule or risk, and when you find that real needs are not being met, tell people promptly and negotiate.
  3. Refuse improper instructions and follow formal procedures; disclose conflicts of interest and step aside; do not leak confidential information.
  4. When you find illegal conduct or a serious violation, report it promptly and honestly to the person with authority to deal with it. Do not decide the matter yourself and do not pass it on.
  5. When the facts are unclear, verify first and then decide. Do not discipline on rumor, and do not call people out in public.

This chapter has 18 questions in the full bank; the questions beyond the worked examples are practiced in the question bank. Practice this chapter.