PMP · Resources and Team · 2 lessons · about 27 min
Part of the free PMP video course: every lesson starts with its video →
What this chapter covers
A team does not work efficiently the moment it is formed. Members first have to get to know one another, then collide, then agree on how to work, and only then can they cooperate smoothly. The Tuckman ladder divides this path into five stages: forming, storming, norming, performing and adjourning. It is the basis on the exam for judging which step a team is on and how the project manager should lead it. The chapter takes two lessons. Lesson 1 covers the characteristics of the five stages, how to lead the team in each stage, and regression between stages. Lesson 2 covers how team building shortens the settling-in period.
Almost all the questions in this chapter are scenario questions. The stem describes how the team behaves and asks which stage it is in, or what the project manager should do. There is only one method for judging: first pick out the words that describe the team’s state and fix the stage, then choose the action that fits the stage.
Lessons in this chapter
- Lesson 1: The Tuckman ladder: the five stages and how to lead in each. The PMBOK 8 description of each stage and the signals to look for in a stem; the stage-to-leadership-style pairing is common exam practice (directive for forming, coaching for storming, participative for norming, delegating for performing; the style must be chosen according to the team’s needs and the specific situation); do not suppress or punish in storming; PMBOK 8: a team can get stuck or regress to an earlier stage; treating a new member’s arrival as causing regression, which requires settling in again, is common exam practice.
- Lesson 2: Team building: activities, trust and shared goals. What team building is and why it is an ongoing process; three signals that call for it (individuals are competent but cooperation is poor, a new team, stuck in storming); trust comes from collaboration, transparent communication and keeping commitments; approaches for virtual and international teams.
Chapter map
Forming ──> Storming ──> Norming ──> Performing ──> Adjourning directive coaching participative delegating little conflict most conflict trust begins runs itself middling performance lowest performance performance recovers highest performance ▲ │
- may regress to an earlier stage ─┘
Team building: strengthen social relationships and create a collaborative environment, shortening forming and storming
The performance levels shown for each stage (middling, lowest, recovering, highest) are common exam practice.
Study tips
First memorize the order and one or two key words for each stage, then do the three worked examples in Lesson 1 and get a feel for “fix the stage first, then choose the action.” In Lesson 2, focus on the logic of choosing team building when individuals are competent but the team as a whole is not working well. When you finish this chapter, go on to team performance, which covers how to assess, train, recognize and handle problems once the team is built. The key takeaways at the end of each lesson are worth reviewing the day before the exam. One more common way to lose points: seeing the word “conflict” and choosing storming. First check whether the conflict is increasing or has already decreased. Decreasing conflict can be a clue to the norming stage, but you also need to see whether members have begun to work together, adjust their behavior and build mutual trust (conflict can also decrease for a while because it is suppressed or avoided). And when you see harmony, do not jump to performing; look for descriptions of trust and of the team resolving disagreements on its own.
Lesson 1
The Tuckman Ladder: Five Stages and How to Lead in Each
Lesson overview
A group of people assigned to the same project will not work in harmony on the first day. They first get to know one another, then collide, then agree on how to work, and only then run smoothly. The Tuckman ladder breaks this path into five steps. The exam uses it for two kinds of questions: given a description of team behavior, decide which stage the team is in; given a stage, ask how the project manager should lead. This lesson covers both. The next lesson covers how team building shortens the first two stages.
What each of the five stages looks like
The Tuckman ladder (also called the Tuckman model of team development) describes five stages of development that teams may go through: forming, storming, norming, performing and adjourning. “Although it is common for these stages to occur in order, it is not uncommon for a team to get stuck in a particular stage or regress to an earlier stage. Projects with team members who worked together in the past may also skip a stage.”
PMBOK 8 writes only a sentence or two about each stage, yet on the exam you must recognize the stem from those sentences. The table puts the official description next to the signals commonly seen in stems:
| Stage | Key points of the official description | Signals commonly seen in stems |
|---|---|---|
| Forming | “This phase is where the team members meet and learn about the project and their formal roles and responsibilities. Team members tend to be independent and not as open in this phase.” | Just formed, polite, exchanges stay on the surface, nobody voices an objection |
| Storming | “During this phase, the team begins to address the project work, technical decisions, and the project management approach. If team members are not collaborative or open to differing ideas and perspectives, the environment can become counterproductive.” | Fights over approaches, nobody gives ground, meetings end badly, challenges to the division of work |
| Norming | “In this phase, team members begin to work together and adjust their work habits and behaviors to support the team. The team members learn to trust one another.” | Arguments clearly decrease, people act on what was agreed, communication becomes smooth |
| Performing | “Teams that reach the performing stage function as a well-organized unit. They are interdependent and work through issues smoothly and effectively.” | Disagreements resolved by the team itself, the project manager does not need to oversee everything, performance steady at a high level |
| Adjourning | “In this phase, the team completes the work and moves on from the project. This typically occurs when staff is released from the project as deliverables are completed.” | Delivery complete, members moving on, team disbanded |
In the forming stage conflict is usually low, or latent disagreements have not yet been voiced. The reason is not that everyone agrees but that members tend to be independent and not as open, and nobody wants to speak first. The following description of “most conflict, lowest efficiency, highest efficiency” is common exam practice. In the storming stage conflict is at its highest and team efficiency is usually at a low point; the team has begun addressing the work, differences have surfaced, and they need to be handled constructively. For the norming stage, hold on to the word “begin”: trust has only just started and the team is still finding a shared way of working. By the performing stage the team can run itself, and this is usually the stage with the highest efficiency. How long a particular stage lasts depends on team dynamics, team size and team leadership.
How to lead in each stage
Different stages call for different leadership. Common exam practice pairs stages with “leadership styles”. In forming, use a directive style: make goals, roles and rules clear first. In storming, use a coaching style: hold to the direction while guiding everyone to put their disagreements on the table. In norming, use a participative style: work with the team to sort out processes and boundaries so that trust continues to grow. In performing, use a delegating style: hand decision-making to the team, and give more attention to milestones, obstacles and necessary governance and performance oversight. This pairing is common exam practice, and questions are written around it, so learn the correspondence.
The storming stage is where the traps are. Treating disagreement in the storming stage as normal is common exam practice, and handling it constructively helps the team move into the norming stage; disagreement itself is not evidence that the project manager has failed. Suppressing opinions, issuing public warnings, pushing every dispute to the sponsor, and having the project manager make all the technical decisions all make members less willing to speak up and leave the team stuck in storming. The right approach is to guide members to discuss disagreements face to face and to agree on ways of working that everyone will follow, which paves the way into the norming stage. The same goes for agile teams: when a new team struggles to settle in during its first iteration, the agile coach should tell the team that this is normal in the storming stage and encourage them to find their own way through, rather than solving it for them.
PMBOK 8 says a team can get stuck in a stage or regress to an earlier one. Treating a new arrival as causing regression is common exam practice. A team that has been running steadily can drop back a stage when two new members join, and needs to settle in again, and its velocity takes a while to stabilize. So when new people arrive, the project manager should actively help them integrate and leave room for settling in, and should not expect the newcomers to be as fast as the old team from the moment they arrive.
Example: a year in the life of a store app team
A bakery chain pulls seven people from three departments to build a store app. At the first weekly meeting everyone nods and there is not one objection. This is the forming stage, and the project manager uses the meeting to make clear the goals, the division of work and the meeting rules. In week four, two camps argue three times over which front-end framework to use for the ordering flow, and the meeting ends badly. This is the storming stage. The project manager does not rule on it. Instead she asks both sides to evaluate the options against three criteria, launch time, maintenance cost and compatibility with store devices, and they agree to “decide the approach by the evaluation results.” After that the arguing drops sharply and everyone follows what was agreed. This is the norming stage, and the project manager begins to invite members to help improve the review process. Half a year later the team handles its own disagreements and the project manager looks only at milestones: the performing stage. After launch members return to their home departments, which corresponds to the adjourning stage.
Worked examples
Example 1: A home goods trade show preparation group: judging the Storming stage from its characteristics
The members of a preparation group for a home goods trade show now understand their roles and responsibilities, but lately they argue often about the exhibit layout, and meetings frequently end badly. Which stage of the Tuckman ladder is the team in now?
Show answer and explanation
Correct answer: A
The preparation group already understands its roles and responsibilities, but recently it has argued often over the exhibit layout and meetings often end badly. The question asks which Tuckman stage the team is in.
There are two key pieces of information. First, roles and responsibilities are already clear (learning about roles and responsibilities can also happen in the Forming stage, so it cannot decide the question alone). Second, members have begun to deal with the specific plans and approach but are unwilling to accept differing views, with constant arguments and meetings that cannot proceed. This is the typical picture of the Storming stage, in which conflict is at its highest and performance tends to be lower. Preparation work is still going on, and there is no sign of interdependence or of disagreements being resolved by the team itself. The answer is A.
Why the other options are wrong
- B. The Adjourning stage is when work is complete and members leave the project. Preparation is still under way and the team has not been disbanded.
- C. A team in the Performing stage functions as a well-organized unit and works through disagreements smoothly, the opposite of “meetings end badly.”
- D. In the Norming stage arguments have clearly decreased and members begin to act on what they have agreed. Here the arguments are still frequent, so the team has not reached this step.
Key takeaway Clear roles but frequent arguments and meetings that cannot proceed point to Storming. Clearly fewer arguments and acting on agreed ways of working point to Norming.
Variation If the stem said arguments had clearly decreased and members had started reviewing the layout using the process everyone agreed on, the answer would be the Norming stage. If it said members had just met, were polite to one another and no one raised an objection, the answer would be the Forming stage.
Something wrong with this question?
Example 2: Arguments decrease and people start to collaborate: choosing a leadership style by stage
The development team of a community group-buying platform had members who held to their own views on the technical approach and would not cooperate. After a period of settling in, the project manager sees that arguments are steadily decreasing and that members are starting to collaborate and trust one another. Which leadership style is MOST suitable for the project manager to use now?
Show answer and explanation
Correct answer: A
The development team used to hold firmly to opposing views on the technical approach. After settling in, arguments are decreasing, and members are beginning to collaborate and trust one another. The question asks which leadership style suits the project manager best.
Fewer arguments, with members starting to collaborate and build trust, is the mark of the Norming stage: it is not the Forming stage of people who have just met, and it is not yet the self-running Performing stage. Trust has only just begun, and processes and boundaries still need to be worked out together, so the project manager should discuss with the team, build ways of working together, and delegate gradually. That is the participative style. Note that the pairing “Forming: directive, Storming: coaching, Norming: participative, Performing: delegating” is common exam practice. The answer is A.
Why the other options are wrong
- B. The directive style goes with the Forming stage, where members do not yet know the project and the leader needs to explain goals, roles and rules. This team has already been settling in for some time, so there is no need to start over.
- C. The coaching style goes with the Storming stage, where the leader guides people to air disagreements while they still exist. Here the arguments are already decreasing, and the focus has moved to building trust.
- D. The delegating style goes with the Performing stage, where the team runs itself and the leader largely steps back. In the Norming stage trust has only just started, so stepping back completely carries more risk.
Key takeaway Under common exam practice, stages and leadership styles pair up one to one: Forming directive, Storming coaching, Norming participative, Performing delegating.
Variation If the stem said the team had worked together for years, understood one another well and quickly solved hard problems on their own, the answer would be delegating. If it said a new team had just been formed and members did not know one another, the answer would be directive.
Something wrong with this question?
Example 3: Friction in the Storming stage: the project manager’s best action
A team has entered the Storming stage. Competition and friction have appeared among members, and progress is affected. What is the BEST thing for the project manager to do now?
Show answer and explanation
Correct answer: A
A team has entered the Storming stage, with competition and friction among members and progress affected. The question asks for the project manager’s best action now.
Storming is a stage a team may experience as members begin addressing the work and differences surface. It is not by itself a sign that the project manager has failed, but the differences need to be handled constructively. The project manager’s job is to make differences open and discussable: guide members to talk through disagreements face to face and agree on ways of working that everyone will follow. With shared rules the team can move toward the Norming stage. This approach keeps differing opinions and turns conflict into rules. The answer is A.
Why the other options are wrong
- B. A written warning as an example makes members afraid to speak up, communication becomes more closed, and the Storming stage may drag on even longer.
- C. Escalating each dispute to the sponsor takes away the team’s chance to solve problems and build rules itself, and the project manager gives up the responsibility of leading the team.
- D. Suspending discussion and deciding all technical approaches personally shuts members out, merely pushes the disagreements down, and leaves the team dependent on the project manager, so it never reaches self-running Performing.
Key takeaway In the Storming stage, guide disagreements into the open and agree on shared ways of working. Do not suppress, punish or escalate everything.
Variation If an agile team has friction in its first iteration and proposes ending the iteration early, the coach should tell the team that this is normal in the Storming stage and encourage the team to work through it on its own.
Something wrong with this question?
Common traps
Common trap
- Norming and performing are the easiest to confuse. Norming is “beginning” to work together and “beginning” to trust, and the team still relies on agreements to get things done. Performing means the team runs itself, absorbs its own disagreements, and has the highest performance.
- “Little conflict” in forming does not mean the team is healthy; it means no one is yet willing to say what they really think. In storming there is a lot of conflict and performance is usually lowest (common exam practice), but it is a normal step.
- For ordinary disagreement in storming, give priority to guiding open discussion and collaborative resolution and to agreeing ways of working that everyone follows. Do not immediately punish, suppress, replace people or escalate everything. If disruptive conflict persists and the team cannot resolve it, formal procedures can be used, and disciplinary or escalation measures if necessary.
- PMBOK 8: a team can get stuck in a stage or regress to an earlier one. Treating a new member as causing regression is common exam practice; do not assume the stages only move forward.
Key takeaways
- The five stages in order are forming, storming, norming, performing and adjourning; a team can get stuck, regress, or skip a stage.
- Storming has the most conflict and the lowest performance, and performing has the highest (common exam practice).
- Norming is the “beginning” of trust; in performing the team runs itself and absorbs its own disagreements.
- Common pairings: forming directive, storming coaching, norming participative, performing delegating.
- In storming, guide disagreements into the open and agree shared ways of working; do not suppress or punish. An agile coach encourages the team to work through it on its own.
- A new arrival can send the team back to an earlier stage, so leave time for settling in.
Lesson 2
Team Building: Activities, Trust and Shared Goals
Lesson overview
The previous lesson explained that teams may go through forming and storming, although some teams can skip a stage. The longer the settling-in period, the more is wasted, and the project manager cannot simply wait: team building is how to shorten it actively. This lesson answers three questions: what team building actually does, in what situations to choose it, and how to do it effectively. This topic is common on the exam. The stem often gives a team where “every individual is competent but they do not cooperate well” and asks you to pick the fitting remedy. The next chapter covers how team performance is assessed and improved.
What team building is
Team building is conducting activities that enhance the team’s social relationships and build a collaborative and cooperative working environment. The activities can vary from a 5-minute agenda item in a status review meeting to an off-site, professionally facilitated event designed to improve interpersonal relationships. Whatever the form, there is one objective: to help individual team members work together effectively.
Team building is not something done once at the start of a project and then finished. While it is essential during the initial stages of a project, it should be a continuous process. Changes in a project environment are inevitable, and members come and go, so a continuous or renewed effort is needed. The project manager should also continually monitor team functionality and performance to determine if any actions are needed to prevent or correct various team problems. When members work from remote locations without the benefit of face-to-face contact, team-building strategies are particularly valuable, and informal communication and activities can help in building trust and establishing good working relationships.
It is also worth remembering where team building sits in the Lead the Team process. PMBOK 8 lists the common aspects of team development. Vision and objectives are communicated throughout the project, and the team references the intended outcomes when making decisions. Project managers ensure that team members understand and fulfill their roles and responsibilities, and use training, mentoring or coaching to close gaps where needed. Project team operations are shaped by working with the team to develop a project team charter and a set of operating guidelines or project team norms. Guidance is directed to the overall project team. Growth is supported by identifying areas where the team is performing well and areas where it can improve.
When to choose team building
Abstracting from the stems, there are three kinds of signals that point to team building. First, individuals are competent but the team as a whole is not working well: each person’s own deliverables are fine, but things stumble at joint reviews and cross-group cooperation, and what is missing is trust and collaboration. If the stem shows that what is missing is trust and collaboration, replacing people or only changing the reporting frequency does not fit the symptom (poor task pairing can also be a cause, and where necessary tasks can be re-paired to create opportunities for collaboration). Second, a newly formed team or new members joining: members do not know one another, so arrange introductions and relationship building early, and form a shared understanding of the project vision, objectives, requirements and scope, with the order tailored to the situation (common exam practice: with no other conditions in the stem, first have everyone get to know one another and connect, then discuss requirements and scope). Third, the team is slow to get out of storming: relationships are strained and people accuse one another, so work on relationships and goals together.
The specifics vary by scenario.
A new team has just been formed, especially with members spread across several countries: first send a welcome email and hold an introduction meeting so everyone gets to know one another, then work through cultural differences and likely conflict points, and arrange online team-building activities. Meeting members one by one while also organizing a team-building activity is a sound way to begin when taking over an unfamiliar team. If a new member joins during the performing stage, organize an activity to help the person integrate quickly, and explain the team’s basic rules.
The team is not settling in well and there are already rifts: hold social activities to build understanding among members, set the team’s goals together, and arrange tasks that can be done only through cooperation so that members build connections as they collaborate. If the rifts remain after the activities and communication stays at work handoffs, social events alone may not be enough: dig further into the core cause, and as appropriate strengthen shared goals or collaborative tasks, or take other targeted measures.
Building trust: trust accumulates through collaboration, transparent communication and keeping commitments. It does not come from pressure through appraisals or from a one-off get-together. When members with complementary skills each work on their own, their strengths go unused, so adjust task pairings and have them collaborate. When members are uncomfortable with the “team member” identity and would rather work alone, conduct team building, talk with them one-on-one first to understand the cause, and then guide them to collaborate.
What to watch for when doing it
When members are unwilling to join activities, first explain what the activity offers the team and then invite them to take part, without criticizing or forcing. For an international team, take cultural differences into account. For a virtual team, choose suitable online activities based on location, culture and communication needs, without prescribing a fixed order. If many team members are introverted, send out the agenda the day before the meeting so they have time to think before speaking. This is a way of accommodating members’ traits, and it also counts as creating a collaborative environment.
Other models of team development and effectiveness exist with different emphases. For the exam, concentrate on the Tuckman ladder, using it to judge the stage of team development and then choosing the leadership approach and team-building activities accordingly. There is no need to memorize the other models one by one.
Example: settling in across three locations
The ordering system for a pharmacy chain is being developed jointly by engineers in Shanghai, Chengdu and Manila. Every person’s module is delivered on time, but integration testing keeps running into problems: the Chengdu colleagues say the interface notes from Shanghai are too thin, and the Shanghai colleagues feel Chengdu always replies late at night. The project manager does not replace anyone and does not immediately change the reporting frequency. Instead she does three things: an online meet-and-greet where everyone describes their working habits and time zone arrangements; a shared written agreement from all three sites on “how soon a reply is required” during integration testing; and ten minutes each week for two people at different locations to pair up and demo their modules. Three weeks later, integration problems have clearly decreased.
Worked examples
Example 1: Competent individuals but poor cooperation: team building is the fitting remedy
On a logistics company’s information platform project, members are in three countries and different time zones. The work each member delivers is acceptable, but joint reviews and cross-group cooperation always go badly, and overall performance is below expectations. What should the project manager do?
Show answer and explanation
Correct answer: B
An information platform project has members in three countries and different time zones. Each member’s own deliverables are acceptable, but joint reviews and cross-group cooperation are always rough, and overall performance is below expectations. The question asks what the project manager should do.
Start with “each member’s own deliverables are acceptable”: there is no evidence of deficient individual ability. The stem explicitly locates the problem in joint reviews and cross-group cooperation—that is, communication and collaboration while working as a team—and gives no indication that tasks were assigned poorly. Team building is conducting activities that enhance the team’s social relationships and build a collaborative and cooperative working environment, and a team across countries and time zones needs to promote communication actively. The answer is B.
Why the other options are wrong
- A. The stem does not say any member is unqualified, and individual performance is satisfactory, so swapping members will not fix the cooperation problem and would force the team to settle in again.
- C. The communications management plan might be worth reviewing, but the stem does not point to reporting frequency or channels as the problem. Time zones only show that communication is harder. Since individual deliverables are all acceptable, the issue is trust and collaboration, and revising a plan does not replace team building.
- D. Task assignment has not been identified as a problem, and every individual deliverable is acceptable, so reassigning tasks does not address the issue.
Key takeaway When individuals are competent but the team does not work together well, what is missing is trust and collaboration, and team building is the fitting remedy.
Variation If one member’s deliverables were always unacceptable, first find out why and then consider training or coaching, not team building.
Something wrong with this question?
Example 2: Stuck in the Storming stage: how to move the team into the Norming stage
The members of a project team come from several countries, and cooperation has never gone smoothly. The project manager has accompanied the team through the Storming stage of the Tuckman ladder for some time, but the team still has not moved into the Norming stage, and the schedule has started to slip. What should the project manager do to move the team into the Norming stage?
Show answer and explanation
Correct answer: A
A multinational team has not cooperated smoothly. The project manager has been with the team through Storming for some time, but it has not entered Norming and the schedule is slipping. The question asks how to get the team into the Norming stage.
The crux of Storming is that members disagree about ways of working, views and roles, and their relationships are not yet solid. To enter Norming, members need stronger interpersonal relationships and goals they all accept. Social activities build understanding, and jointly setting team goals gives everyone one direction. Used together, they address this crux directly. The answer is A.
Why the other options are wrong
- B. Leading the team out of Storming is the project manager’s responsibility. Asking the sponsor to replace people at the first conflict is evasion and does not explain how cooperation would improve.
- C. Finding the instigator and applying step-by-step discipline deals only with an individual’s behavior, while poor cooperation is already a team-level problem, and punishment makes the atmosphere tenser.
- D. The stem does not say the delay is directly caused by communication problems. Pressuring the team with data and demanding that people “set differences aside” does not change relationships among members.
Key takeaway When stuck in Storming, use team building to strengthen relationships and set shared goals together.
Variation Once the team has entered Norming, shift to a participative style. Once it is in Performing and running smoothly, shift to a delegating style and intervene less.
Something wrong with this question?
Common traps
Common trap
- When individuals are all competent but overall performance is low, think team building first. Do not first replace people, reassign tasks or revise the communications management plan, unless the stem clearly says the problem lies in those areas.
- Team building is not a one-time dinner. It is continuous, and trust builds through collaboration, transparent communication and keeping commitments.
- When a team cannot get out of the storming stage, do not punish the ringleader and do not rush to replace people. Build relationships and set shared goals together.
- Common exam practice: when the stem gives no other conditions, a new team usually gets to know one another and connect before discussing requirements and scope. In practice, tailor the sequence to the situation; team building runs throughout the project. Virtual and international teams especially need team building arranged proactively.
- When members are unwilling to take part, explain the value first and then invite them. Do not force or criticize.
Key takeaways
- Team building is a set of activities that strengthen social relationships and create a collaborative environment, with the aim of helping members work together more effectively.
- It is an ongoing process: crucial in the early stages of a project, with the project manager continually monitoring how the team operates and performs.
- Three kinds of signals call for team building: competent individuals but poor overall cooperation, a new team, and a team that is slow to settle in.
- Trust comes from collaboration, transparent communication and keeping commitments; shared goals and tasks that require cooperation make relationships real.
- Common aspects of team development: vision and objectives, roles and responsibilities, team operations, guidance, growth.
- Virtual and international teams should take location, culture and communication needs into account and choose suitable team-building activities according to the situation, without a fixed order.
This chapter has 26 questions in the full bank; the questions beyond the worked examples are practiced in the question bank. Practice this chapter.