PMP Cheat Sheet: Resources and Team

The key points and common traps of 37 lessons in 11 chapters, each linked to its lesson in the study guide. Other topics are on the cheat sheet hub.

Mind map of Resources and Team
Tap the map to enlarge

Responsibility Assignment Matrix and RACI

Lesson 1: Plan Resource Management: Resource Types, Hierarchical Charts and Roles and Responsibilities

Key takeaways

  1. Plan Resource Management determines how resources are estimated, acquired, led and utilized, and outputs the resource management plan and the team charter.
  2. Resources fall into three kinds: team, physical and virtual. Acquire Resources covers all three; Monitor and Control Resourcing covers only physical and virtual resources (team members are handled in Lead the Team). External resources are obtained through partnerships, joint ventures or procurement.
  3. The WBS breaks down by deliverables, the OBS by department, and the RBS by resource category and type.
  4. Role is the position, authority is the right to decide, responsibility is the work to be done, and competence is the skill needed to do it.
  5. When competence is insufficient, train, hire, change the schedule or change the scope. Skill gaps are identified during planning.
  6. Management style is adjusted to the situation: when the team knows this kind of project well it can manage itself to a large degree, and for a completely new kind of project you give more oversight and a more directive style.

Common traps

  • The resource management plan is a guide to “how to manage resources”, not a list of “which resources are needed”. The list comes from Estimate Resources.
  • Identifying skills is the project manager's work in the planning phase and cannot be pushed to the sponsor. Initial skill needs and gaps should be identified early, not deliberately put off until work has started. During the project the skill matrix keeps being updated, and new gaps are identified and closed in Lead the Team.
  • The scope statement and the WBS mainly say what work is to be done. The WBS can show high-level areas of responsibility, but who exactly is responsible should still be checked in the roles and responsibilities of the resource management plan and in the responsibility assignment matrix.
  • In this lesson focus on the three hierarchical charts the exam tests: the WBS breaks down by deliverables (it answers “what is delivered” and does not directly show who is responsible), the OBS by department, and the RBS by resource. PMBOK 8 also lists the value breakdown structure (VBS).

Lesson 2: The Responsibility Assignment Matrix and RACI: One Accountable Person per Activity

Key takeaways

  1. A responsibility assignment matrix shows the relationship between activities and team members and ensures that each task has only one accountable person.
  2. The four RACI letters: responsible (R), accountable (A), consulted (C), informed (I).
  3. Each activity has only one A, and there can be several Rs.
  4. When responsibility is unclear, people pass the buck or work is assigned from several sources, go back to the responsibility assignment matrix first.
  5. To determine which resources are needed, do not look at the matrix; look at the outputs of Estimate Resources (resource requirements and the resource breakdown structure). The resource management plan describes how project resources are identified and quantified, acquired, allocated and monitored, and can include roles and responsibilities. The specific resource types and quantities are recorded in the resource requirements.
  6. For a team of mixed internal and external people, RACI is especially useful for making the division of work clear.

Common traps

  • For conflict caused by unclear responsibility, the most fundamental remedy is to clarify roles and responsibilities. It is not to go to the functional manager first, replace people or split tasks evenly.
  • PMBOK 8 notes that the resource management plan may include “roles and responsibilities” (role, authority, responsibility, competence), while the responsibility assignment matrix shows the relationship between work packages or activities and team members. Common exam practice: if the stem asks who is responsible or accountable for a specific work package or activity, think of the responsibility assignment matrix first. If it asks how roles, responsibilities, authority and competence are planned for the project as a whole, think of the resource management plan, and judge by the context of the stem.
  • The responsibility assignment matrix clarifies the division of responsibility for work packages or activities. During planning it can first be built by role or group and refined to individuals once resources are known. To decide which resources are needed, look at the outputs of Estimate Resources (resource requirements and the resource breakdown structure). The resource management plan describes how resources are identified and quantified, acquired, allocated and monitored, and can include roles and responsibilities, while the specific types and quantities of resources are recorded in the resource requirements.
  • There can be only one A, but there can be several Rs. Do not read “accountable” as “does the work”.

Lesson 3: The Resource Management Plan: What It Contains and How to Use It

Key takeaways

  1. The resource management plan is a component of the project management plan and may be divided into a team management plan and a physical resource management plan.
  2. Its contents: identification of resources, acquiring resources, roles and responsibilities, project organization chart, project team resource management, training, team development, resource control, recognition plan.
  3. Roles and responsibilities contain four items: role, authority, responsibility and competence.
  4. For unclear roles, overlapping responsibilities and disagreements over resource selection, check the resource management plan first; for skill gaps, assess the impact and constraints first, then decide whether to arrange training in the plan; only disagreements about member behavior go back to the ground rules in the team charter.
  5. After a contract or rule change, analyze the impact and handle it through the established change process; update the resource management plan once the change is approved.
  6. The resource plan must be aligned with the schedule.

Common traps

  • To see team members and their reporting relationships, look at the project organization chart. It belongs to the resource management plan and is not a separate plan.
  • PMBOK 8 treats training, hiring new members, schedule changes and scope changes as parallel responses when competence is insufficient, and the impact and constraints should be assessed before choosing. On the exam, choose training in the resource management plan only when the stem establishes that training can close the gap in time within the project constraints. Otherwise assess the impact and constraints before comparing training, hiring, schedule changes, or scope changes.
  • To determine which resources are needed, look at the identification methods in the resource management plan and at the outputs of Estimate Resources. The responsibility assignment matrix shows the relationship between activities or work packages and people and is not used to show which resources are needed.
  • After the project management plan is issued, if a member asks about his role, the answer is in the roles and responsibilities in the plan and in the matrix, not in calling another meeting.

Team Charter

Lesson 1: Team Charter and Team Agreements: Purpose, Contents and Who Develops It

Key takeaways

  1. The team charter establishes values, agreements and operating guidelines for the team, and is an output of Plan Resource Management.
  2. Contents: team values, communication guidelines, decision-making criteria and processes, conflict resolution processes, meeting guidelines and team agreements.
  3. It works best when the team develops it or contributes to it, and all members share responsibility for following it.
  4. It can be reviewed and updated periodically; when membership changes, review and update it together with all members.
  5. The team charter and team agreements govern members' behavior; the project charter authorizes the project. They are different things.
  6. When members have very different styles and are prone to conflict, align expectations in advance through the team charter.

Common traps

  • The project manager drafts the charter alone and then sends it out. The members did not take part, so buy-in is low. The charter should be developed early by the team together, and the kickoff meeting can be one occasion for discussing and confirming it (PMBOK 8: the team charter works best when the team develops it or at least has an opportunity to contribute to it).
  • Using a template can be a starting point, but it cannot replace the process of the team discussing and reaching consensus together.
  • The team charter governs how members work together; the project charter authorizes the project and the project manager. Do not mix them up.
  • The risk management plan, the stakeholder engagement plan and the project management plan do not set behavioral rules for members.

Lesson 2: Ground Rules and Handling Violations: Prevent First, Correct in Order

Key takeaways

  1. Ground rules are expectations about acceptable member behavior, defined in the team charter.
  2. Set ground rules early with everyone taking part; consensus comes first from thorough discussion and participation, and voting or similar methods can be used as the team charter specifies.
  3. Their main purpose is to prevent conflict by agreeing how to interact in advance.
  4. When working hours do not line up, have the team agree core working hours in the charter.
  5. For a violation, talk privately and restate the rule first; if the rule does not fit, the team updates it; if reminders fail repeatedly, go to the formal procedure.
  6. To avoid “I never saw the rules” disputes, make sure beforehand that the charter is developed by everyone together.

Common traps

  • Members keep checking email in meetings and drift off topic. The cause is that there are no communication ground rules, and the remedy is to agree them through the team charter, not to replace people, escalate first or ban the behavior unilaterally.
  • The project manager unilaterally sets the core working hours without team discussion, and compliance suffers; let the team agree them itself.
  • The project charter authorizes the project and does not set members' day-to-day behavior; using it in place of the team charter does not solve behavior problems.
  • Common exam practice: the order for handling a violation is a private talk, restating the rule, updating the rule if necessary and only last a formal procedure; do not start with discipline or escalation. Serious or compliance-related incidents should be handled immediately through the organization's procedures.

Lesson 3: Shared Vision and Clear Expectations: The Opening Order for a New Team

Key takeaways

  1. The common aspects of team development: vision and objectives, roles and responsibilities, project team operations, guidance and growth.
  2. The vision should be concise and attractive, communicated repeatedly throughout the project, and used as a reference when making decisions.
  3. Opening order for a new team (common exam practice, tailored to the situation): expectations, responsibilities, rules, then tasks.
  4. When a remote team's uneven quality comes from differing understanding of requirements or objectives, first establish common objectives through team-wide and one-on-one communication; if the cause is unclear, analyze the root cause first.
  5. When a new member joins, have them accept the existing ground rules; when the makeup changes substantially, review and update the charter together with all members.
  6. When role boundaries are blurry, clarify and confirm responsibilities; do not avoid the issue and do not add approvals.

Common traps

  • For a new team, assigning tasks first, working out the technical approach first or letting everyone “find their own way of working together” all go against the common exam practice of making expectations, roles and rules clear first.
  • The vision must be drafted and understood by the team and key stakeholders together; it is not announced by the project manager and not simply posted on the wall.
  • Time logs and progress reports are about monitoring. If a quality problem comes from differing understanding of requirements or objectives, align on objectives beforehand; for other quality problems, analyze the root cause first and take targeted action.
  • When a new member joins, have them learn and accept the existing rules; do not leave them to figure it out alone, and do not discipline first.

Estimate Resources and Acquire Resources

Lesson 1: Estimate Resources: Requirements, Basis and the Resource Breakdown Structure

Key takeaways

  1. Estimate Resources identifies the type, quantity and characteristics of resources, predicts shortages or surpluses, and is performed once or at predefined points.
  2. Inputs: resource management plan, schedule management plan, scope baseline, activity list, activity attributes, resource calendars, risk register and others.
  3. Tools: bottom-up, analogous and parametric estimating, and alternative analysis.
  4. Outputs: resource requirements, basis of estimates, resource breakdown structure, and project document updates (activity attributes, assumption log, lessons learned register, risk register and others).
  5. The resource calendar shows when and for how long a resource is available.
  6. When requirements and available resources do not match, PMBOK 8 lists alternative analysis as a tool of Estimate Resources. Common exam practice: usually analyze feasible ways to fill the gap first, then plan acquisition in line with the sourcing strategy; tailor the exact order to the situation.

Common traps

  • On finding a gap, the project manager should first analyze it and propose ways to fill it, and then ask the sponsor for support with evidence. Handing the gap straight to the sponsor passes the analysis work to someone else.
  • Cutting scope or delaying the start are options for after the gap cannot be closed by resource measures; they are not the first reaction.
  • Resource estimates and cost estimates must stay consistent, and cost is one of the factors that affect the choice of resources.
  • Estimate Resources produces “what is needed and how much,” not “who will do it”; the specific people are decided in Acquire Resources.

Lesson 2: Acquire Resources: Negotiate First, Preassignment and Multicriteria Decision Analysis

Key takeaways

  1. Acquire Resources outlines and guides the selection of resources and assigns them to activities, and is performed periodically throughout the project as needed.
  2. When acquiring resources, negotiation is an important technique; the usual parties are functional managers, other project management teams and external organizations (common exam practice).
  3. Common exam practice: if negotiation fails, escalate to the sponsor, and if that still fails, recruit or procure; the conditions in the stem take priority.
  4. Preassignment: specific people committed in a competitive proposal, dependence on particular expertise, or already named in the charter.
  5. Multicriteria decision analysis: set the criteria, set the weights, score, then weight and rank.
  6. Plan Sourcing Strategy decides between internal and external resources and sits in the Governance performance domain.

Common traps

  • In multicriteria decision analysis, the criteria are prioritized and weighted first, and only then are the candidates scored; if you look at the people before setting the criteria, the result is biased.
  • Acquiring resources is not the same as assigning them directly. Common exam practice: when the project manager has no authority to assign directly and the resources are not preassigned, you would normally negotiate with the functional manager or resource manager; if the stem clearly says the project manager has authority to assign, the resources are preassigned or the sourcing strategy says otherwise, follow the stem.
  • Preassignment is a state that was determined in advance, not the result of scoring and selecting; the physical or virtual resource assignments and the project team assignments are outputs of Acquire Resources, not methods.
  • Acquire Resources covers team, physical and virtual resources; external resources are obtained through partners, joint ventures or procurement, and in common exam practice this normally comes after internal negotiation.

Lesson 3: Outputs of Acquire Resources: Assignments, Team Assignments, Resource Calendars and Handling Resource Changes

Key takeaways

  1. The three outputs of Acquire Resources: physical or virtual resource assignments, project team assignments and resource calendars.
  2. The resource calendar shows available dates and shifts and must honestly reflect vacations and training.
  3. When a resource problem arises: establish the facts first, then negotiate, and only then change.
  4. A member tied up by a functional department: negotiate hours and priority with the functional manager; a resource tied up by another project: negotiate with that project manager or the functional manager.
  5. When capability is insufficient, assess the gap first, then choose among reassignment, training, outsourcing or recruiting.
  6. If alternative resources may have to be used, risks must be acknowledged and legal, regulatory, mandatory or other specific criteria must not be violated.

Common traps

  • The resource calendar must honestly reflect vacations, training and local holidays, and scheduling is based on it; it answers “when is the resource available” and is not something to be negotiated.
  • When resources are pulled away, first assess the impact on both sides and then negotiate formally; talk to the member before moving them, and when a member is absent, do not start with discipline or removal.
  • When resources fall short, first clarify the need and seek support from stakeholders; do not start by logging a risk, changing a baseline or cutting scope.
  • What you need to resolve is “who is taking up the member's time.” When the member is tied up by the functional department's work, you mainly negotiate with the functional manager; when tied up by another project, with that project manager or the functional manager. Negotiate primarily with whoever controls the competing allocation (the functional manager or the other project's project manager), while consulting the affected member as appropriate.

Lesson 4: Resource Optimization and Release: Balance Workload, Match Skills, Release on Time

Key takeaways

  1. Resource leveling balances resource supply and demand by adjusting the schedule and may affect the critical path; resource smoothing uses only float and does not affect the critical path.
  2. The resource histogram shows resource demand over time and is used to spot overloads.
  3. Tasks should match skills; when overload and idleness coexist, rebalance.
  4. Remove single points of dependency: plan cover and handover in advance; for shared resources, agree priorities and rules.
  5. Acquire resources when they are needed and release them promptly when done.
  6. When assignments can be improved, review the proposed reassignments; if they affect an approved baseline or controlled plan component, obtain approval through change control before implementing them.

Common traps

  • Resource leveling can change the critical path and the duration; resource smoothing uses only float and does not change the critical path. Do not mix them up.
  • Resources that arrive early create idle costs; acquire resources when they are needed, and if the timing is mismatched, adjust the acquisition time rather than taking delivery early as a buffer.
  • When you find that assignments can be improved, proactively review the proposed reassignments; if they affect an approved baseline or controlled plan component, obtain approval before implementing them. Do not ignore the opportunity because the plan was approved or rely on overtime to cope.
  • The purpose of the resource histogram is to show resource demand over time and spot overloads, not to show cost trends.

Negotiation

Lesson 1: Purpose and Parties of Negotiation: Whom to Ask for Resources, with a Win-Win Goal

Key takeaways

  1. Negotiation is a discussion aimed at reaching an agreement, used to achieve support, reach consensus and resolve conflicts.
  2. When acquiring resources, negotiate first; the goal is a win-win.
  3. Parties: functional managers, other projects' management teams, external organizations (common exam practice).
  4. Asking the sponsor for help when the matter exceeds your authority is escalation; common exam practice: escalate only after negotiation fails.
  5. Resource negotiations are usually conducted by the project manager or project team; procurement negotiations are led by a procurement team member with authority to sign contracts.
  6. Networking helps the project manager influence stakeholders and build support for the project.

Common traps

  • When the resource is in the functional manager's hands, negotiate with that manager first. Do not skip a level to the sponsor, contact the member directly or change the baseline.
  • The common parties are functional managers, other projects' management teams and external organizations (common exam practice). Asking the sponsor for help is escalation when the matter exceeds your authority, but you can also negotiate when the sponsor controls the resource (exam tip: when asked for the “party to negotiate with,” choose the resource owner first).
  • Negotiation aims for a win-win. Pulling rank and persuading with business value are two ways of pressing your case, and the latter is more effective.
  • Resource negotiations are usually conducted by the project manager or project team (PMBOK 8: negotiate effectively); procurement negotiations are led by a procurement team member with authority to sign contracts.

Lesson 2: Preparing for Negotiation, Techniques, and Applications to Resources and Procurement

Key takeaways

  1. Before negotiating, be clear about your own objectives, bottom line, best alternative and the other side's interests.
  2. Before negotiating, clarify priorities with stakeholders and rank your objectives.
  3. Focus on interests, not positions; make concessions with conditions and at a measured pace; influence the other side through value.
  4. When a key person is pulled away and the impact is already clear, negotiate with the functional manager next (common exam practice); if the impact is not yet known, assess it first.
  5. Procurement disputes: negotiate first (which is itself ADR), then use third-party methods such as mediation and arbitration if unresolved; litigation is the last option.
  6. Negotiating conflicts: collaborating (problem solving) is usually the first choice, and compromise is each side giving up something.

Common traps

  • When a scarce resource is contested by several projects, apply the organization's governance and portfolio priority criteria, weighing value, strategic alignment, schedule, budget, risk and dependencies; it is not a matter of whoever outranks the others (common exam practice: when the stem gives no other conditions, compare the projects' business benefits first, then look at budget and schedule).
  • When the other side simply has no time, first negotiate a workable arrangement with that person; do not go around them and do not rush to escalate.
  • Do not change the baseline directly; usually you first communicate and clarify the proposal, and once it becomes a change proposal that needs formal review, raise a change request, and do not implement it or change the baseline before approval; whether to negotiate first depends on the situation in the stem (common exam practice).
  • Showing all your cards, changing priorities on the fly and refusing to flex on a fixed objective are all poor preparation; rank your priorities in advance, and have a bottom line while leaving room to move.

Virtual Teams

Lesson 1: Colocation and Virtual Teams: Meaning, Advantages and Disadvantages

Key takeaways

  1. Colocation places members in close physical proximity and can be temporary or last the whole project.
  2. The benefits of colocation are better communication (osmotic communication, a common exam term) and quick trust building; a team meeting room (a war room, a common exam term) is a common practice.
  3. A virtual team has little or no face-to-face contact and is connected by communication technology.
  4. Virtual team benefits: more skilled resources, lower cost, less travel and relocation. Disadvantages: isolation and communication difficulty.
  5. When members are dispersed and there is no relocation budget, form a virtual team and set up an online team environment.
  6. When online communication is causing misunderstandings and conditions allow, colocate temporarily.

Common traps

  • Colocation is not required, and longer is not better; it can be used only at critical times.
  • The problems of a virtual team are mainly about communication, not ability. When members are dispersed, think communication first, not criticizing individuals or replacing people.
  • Adding budget so that everyone can work in one place is often not the best answer; a virtual team is precisely what saves the relocation and travel.
  • A war room should seat members of the same project team. Do not put unrelated people in it.

Lesson 2: Virtual Team Communication, Time Zones, Trust and Cross-Cultural Management

Key takeaways

  1. Communication planning matters more for virtual teams: spend more time setting expectations and establishing conflict resolution protocols.
  2. Time zones: find overlapping hours, have the team agree the meeting times and rotate them, and use minutes plus asynchronous participation for those who cannot attend.
  3. The follow-the-sun model works like a relay through handoffs; the fishbowl window model strengthens belonging through always-on video.
  4. Building trust: one-on-one conversations, informal online activities, and ongoing check-ins and meetings.
  5. Cross-cultural teams: learn proactively and discuss differences openly, and agree working methods and conventions together.
  6. Resolve cultural conflict by understanding differences and building common practices, not by avoiding it or forcing one culture on everyone.

Common traps

  • With a time zone conflict, do not favor one side and do not escalate at once. Negotiate a time both sides can accept, and rotate.
  • Conflicts in virtual teams often come from the communication mechanism. Understand the background first, then improve how the team communicates. Do not reassign people first.
  • Cultural differences should be discussed openly and learned about proactively. Do not avoid them, do not just record them, and do not ask people to give up their cultural habits.
  • A one-time kickoff meeting cannot replace ongoing, planned check-ins and meetings.

Lesson 3: Collaboration Tools and Remote Work: Equip the Team First, Then Agree How to Use the Tools

Key takeaways

  1. Communication technology means the tools, systems or computer programs used to transfer information among project stakeholders. Common methods include conversations, meetings, written documents, databases, social media and websites; videoconferencing, email and instant messaging are common examples.
  2. A newly formed virtual team that runs into collaboration problems can set up a collaboration platform and a team site and use instant messaging to stay in contact; where conditions allow, schedule at least one face-to-face meeting and create a team charter.
  3. Collaboration tools are project resources: listen to the team’s needs first, then trial the tool and evaluate it.
  4. When moving to remote work, first make sure the tools exist and that people are trained to use them, then talk about budget or scope.
  5. Remote meetings: give information beforehand, take turns speaking, and choose the communication method to suit where members are.
  6. When an expert cannot get to the site, use video conferencing or similar technology to let the expert take part remotely.

Common traps

  • When a virtual team performs poorly, first assess team performance and analyze the root cause. If the cause is confirmed to be tools or communication channels, then train members, provide the tools and strengthen contact, rather than replacing people outright or going back to colocation.
  • When people disagree about a new tool, have the team try it and decide on the facts. Do not default to the old tool, and do not let the project manager or sponsor simply decide.
  • One-on-one meetings only improve communication between the project manager and an individual, and a weekly meeting only provides interaction while the meeting is on. Neither replaces a collaboration environment that can support day-to-day communication.
  • One-way emails and logs are not interactive communication. Remote teams should combine real-time interaction with asynchronous collaboration as needed.

The Tuckman Ladder

Lesson 1: The Tuckman Ladder: Five Stages and How to Lead in Each

Key takeaways

  1. The five stages in order are forming, storming, norming, performing and adjourning; a team can get stuck, regress, or skip a stage.
  2. Storming has the most conflict and the lowest performance, and performing has the highest (common exam practice).
  3. Norming is the “beginning” of trust; in performing the team runs itself and absorbs its own disagreements.
  4. Common pairings: forming directive, storming coaching, norming participative, performing delegating.
  5. In storming, guide disagreements into the open and agree shared ways of working; do not suppress or punish. An agile coach encourages the team to work through it on its own.
  6. A new arrival can send the team back to an earlier stage, so leave time for settling in.

Common traps

  • Norming and performing are the easiest to confuse. Norming is “beginning” to work together and “beginning” to trust, and the team still relies on agreements to get things done. Performing means the team runs itself, absorbs its own disagreements, and has the highest performance.
  • “Little conflict” in forming does not mean the team is healthy; it means no one is yet willing to say what they really think. In storming there is a lot of conflict and performance is usually lowest (common exam practice), but it is a normal step.
  • For ordinary disagreement in storming, give priority to guiding open discussion and collaborative resolution and to agreeing ways of working that everyone follows. Do not immediately punish, suppress, replace people or escalate everything. If disruptive conflict persists and the team cannot resolve it, formal procedures can be used, and disciplinary or escalation measures if necessary.
  • PMBOK 8: a team can get stuck in a stage or regress to an earlier one. Treating a new member as causing regression is common exam practice; do not assume the stages only move forward.

Lesson 2: Team Building: Activities, Trust and Shared Goals

Key takeaways

  1. Team building is a set of activities that strengthen social relationships and create a collaborative environment, with the aim of helping members work together more effectively.
  2. It is an ongoing process: crucial in the early stages of a project, with the project manager continually monitoring how the team operates and performs.
  3. Three kinds of signals call for team building: competent individuals but poor overall cooperation, a new team, and a team that is slow to settle in.
  4. Trust comes from collaboration, transparent communication and keeping commitments; shared goals and tasks that require cooperation make relationships real.
  5. Common aspects of team development: vision and objectives, roles and responsibilities, team operations, guidance, growth.
  6. Virtual and international teams should take location, culture and communication needs into account and choose suitable team-building activities according to the situation, without a fixed order.

Common traps

  • When individuals are all competent but overall performance is low, think team building first. Do not first replace people, reassign tasks or revise the communications management plan, unless the stem clearly says the problem lies in those areas.
  • Team building is not a one-time dinner. It is continuous, and trust builds through collaboration, transparent communication and keeping commitments.
  • When a team cannot get out of the storming stage, do not punish the ringleader and do not rush to replace people. Build relationships and set shared goals together.
  • Common exam practice: when the stem gives no other conditions, a new team usually gets to know one another and connect before discussing requirements and scope. In practice, tailor the sequence to the situation; team building runs throughout the project. Virtual and international teams especially need team building arranged proactively.
  • When members are unwilling to take part, explain the value first and then invite them. Do not force or criticize.

Team Performance

Lesson 1: Team Performance Assessments: What to Assess, What to Base It On, What to Do Next

Key takeaways

  1. Team performance assessments are an output of the Lead the Team process and can be formal or informal.
  2. Assessment indicators: improved individual skills, improved team competencies, reduced turnover and increased cohesiveness.
  3. The purpose of assessment is to find the training, coaching, mentoring, assistance or improvements needed, and the resources they require, and then carry out the matching improvement actions, creating a performance improvement plan where appropriate.
  4. When you take over a new team, assess its current effectiveness first, then decide which capabilities to improve.
  5. Individual assessment rests on performance criteria defined in advance (such as key performance indicators agreed beforehand), with feedback given item by item; align expectations with the functional manager.
  6. Open communication, freedom from blame and appropriate delegation are the soil in which cohesiveness and trust grow.

Common traps

  • Team effectiveness is judged on four indicators: individual skills, team competencies, turnover and cohesiveness. Schedule and cost variances belong to project performance and are generally not used to judge how well team building is working (common exam practice).
  • Common exam practice: the step after an assessment is to develop and carry out improvement measures (and, where appropriate, create an improvement plan). It is not to keep the results confidential, give a universal reward or simply rotate people.
  • An individual rating should rest on performance criteria that were defined and communicated beforehand (KPIs can be one of them). Common exam practice: when the stem gives indicators agreed in advance, feedback goes back to each indicator and cannot be just a conclusion.
  • When a functional manager is responsible for member appraisals, the project manager proactively aligns expectations and reporting.
  • An atmosphere where members dare to tell the truth and surface problems is the foundation of cohesiveness. PMBOK 8 says that an environment that fosters open and safe communication helps productive meetings, problem solving, brainstorming, understanding, trust and collaboration; without it, trust and collaboration are hard to build.

Lesson 2: Training, Coaching and Mentoring: Find the Gap First, Then Choose the Remedy

Key takeaways

  1. Training includes all activities that enhance members' competencies, formal or informal, and the training strategy goes into the resource management plan.
  2. The order for closing a gap: define requirements, assess the current state, find the gap, set training needs, choose a method, write it into the plan, evaluate the effect.
  3. If the problem persists after training, run a root cause analysis first.
  4. Coaching uses questions to help a person solve a specific problem on their own. Mentoring is an experienced person sharing knowledge and experience over the long term.
  5. A common skill gap across many people usually calls for training. A need to solve a specific problem independently through questions calls for coaching. A need for ongoing sharing of knowledge, skills or experience calls for mentoring (an apprenticeship, or pairing).
  6. In-house experts come first (common exam practice; choose according to the gap, cost and timing). With no budget, assess the value first and then apply through the funding approval process (common exam practice: make the case to the sponsor).

Common traps

  • When the gap is unclear, training is not the first step. Assess the current state and find the gap first. When the stem already states the gap, go straight to the training, coaching or mentoring approach that fits.
  • If the problem persists after training, run a root cause analysis. Do not add the same training again, and do not punish directly.
  • Common exam practice (when the stem gives no other conditions): when the organization already has experts or experienced members, have them mentor or pair first, with no need to hire outside trainers first. PMBOK 8 says only that training can be given by in-house or external trainers.
  • Coaching works through questions that let the person work it out, with a focus on specific goals. Mentoring is a long-term relationship that shares experience. Both can include one-to-one conversations (mentoring can also be directed at the whole project team). Keep their distinct purposes straight, while remembering that PMBOK 8 treats coaching and mentoring as possible training methods within the broader category of training.
  • Training goes into the resource management plan, with time set aside for mentoring and learning. It is not something to do "when there is time."
  • When members volunteer to learn skills the project needs, support them. Do not refuse across the board just because the schedule is tight.

Lesson 3: Recognition and Rewards: Prompt, Specific, Matched to Needs

Key takeaways

  1. Recognition and rewards happen in the Lead the Team process. The original rewards plan is developed during Plan Resource Management and goes into the resource management plan.
  2. Beyond tangible rewards (money), intangible rewards (growth opportunities, sense of accomplishment, appreciation) can be equally effective and sometimes more so.
  3. Give recognition throughout the project life cycle, promptly and specifically, and do not wait until the end.
  4. Understand individual motivation and needs before choosing a reward. Keep rewards fair, and where there is a misunderstanding about their use, let members help agree it.
  5. Actively identify hidden contributions, recognize them and balance the workload.
  6. Cultural differences affect how recognition lands, so tailor it to cultural preferences.

Common traps

  • Recognition runs through the whole project. It is not handed out all at once at the end. "Save it all for a single reward after closing" is wrong.
  • Rewards should match individual needs. A ready-made uniform form (a certificate, an email to everyone) does not suit everyone, so understand the motivation first. Note the distinction: for an individual's reward, understand their motivation first; for a team-wide, phase-level, immediate recognition, a public certificate is acceptable (see Example 2).
  • Intangible rewards (growth, sense of accomplishment, appreciation, responsibility) work equally well and sometimes better. Common exam practice: monetary rewards are treated as less durable than intangible ones.
  • With an overtime-pay dispute, talk first and then look for a solution. Do not refuse outright, and do not approve every request.
  • When recognition has been missed, explain the situation to the member in person and add suitable recognition promptly, based on the person's preferences and the original rewards plan. PMBOK 8 notes that even a simple thank-you reinforces positive behavior, but an apology alone, with no remedy for the omission, is usually not enough to repair the damage.
  • After a phase-level result, recognize the contribution promptly (PMBOK 8: give recognition throughout the project life cycle rather than waiting until the project is complete). Whether to give a rest and when to plan the next phase should be decided from the team's condition and the project's needs. Common exam practice: when the stem gives no other conditions, the usual order is recognize first, then rest, then plan.

Lesson 4: Poor Performance and Team Problems: Talk First, Find the Cause, Then Choose Measures

Key takeaways

  1. The main line for poor performance: talk privately, find the cause, agree a solution, train or adjust where necessary. Punishment and replacement usually come later. Serious dereliction of duty, or compliance or safety problems, should be handled early in line with organizational policy and governance requirements.
  2. When the stem asks for the "first step," choose a one-to-one conversation to understand the cause, and do not blame anyone in public.
  3. For problems affecting the whole team, do a root cause analysis first, hold an open conversation, and then clarify the situation.
  4. Cliques and isolation: find the cause, set up open information sharing, and help the member integrate through team building.
  5. Groupthink and reluctance to speak: create a safe environment and encourage critical thinking. For diffusion of responsibility, use a responsibility assignment matrix.
  6. A tired team needs better planning and processes, not longer hours.

Common traps

  • "Document first," "punish first," "add a bonus first," "replace first" and "escalate to HR first" are usually later-stage measures in a performance problem, not the first step.
  • Talking privately is not the same as doing nothing. If there is still no improvement after the conversation, agree measurable corrective actions together and use formal procedures only when necessary.
  • Cliques cannot be solved by banning communication or breaking them up. Use open, transparent information sharing and shared goals.
  • A team that works long overtime without results does not need still longer hours. Find the step that limits output.
  • When nobody raises a different opinion, it does not mean there is no disagreement. It may be groupthink, or members may be afraid to speak. Create a safe environment.
  • When a superior's decision is already made, the project manager should support the appointee and not express dissatisfaction in public.

Conflict Management

Lesson 1: Conflict on Projects: Nature, Sources and Management Principles

Key takeaways

  1. Conflict is unavoidable on projects; its sources include scarce resources, scheduling priorities and personal work styles.
  2. Well-managed conflict can raise productivity, spark creativity and improve decisions; the project manager manages conflict, neither eliminating it nor ignoring it.
  3. The first step is to identify the source and analyze the context; different sources have different fixes.
  4. Three levels: members resolve it themselves, the project manager collaborates privately, formal procedures (including disciplinary action).
  5. Early, private, direct and collaborative; focus on the issue, not the person.
  6. Communicate the conflict management principles to the team and external stakeholders in advance.

Common traps

  • Conflict cannot be eliminated entirely and is not always bad; saying it “can be eliminated” or “is all healthy and needs no intervention” is too absolute.
  • When differences become a negative factor, the people involved talk first; the project manager helps only after the conflict escalates; assigning blame and disciplinary action belong to the last stage, formal procedures.
  • It is also wrong to stay completely hands-off and assume an agile team can handle everything itself: when conflict escalates, the project manager still has to help.
  • Criticizing the people involved in public, putting it off, or only suppressing the conflict without following up on the real problem are not good practice.
  • The first response to conflict is to identify the source and analyze the context, not to rule, escalate or replace someone right away.

Lesson 2: The Five Conflict Resolution Techniques: Names, Meanings and When to Use Each

Key takeaways

  1. Factors that influence the choice: importance and intensity, time pressure, relative power of those involved, importance of maintaining the relationship, long-term or short-term motivation.
  2. The five techniques: withdraw/avoid, smooth/accommodate, compromise/reconcile, force/direct, collaborate/problem-solve.
  3. Collaborate/problem-solve can produce a win-win and pursue a durable resolution through consensus and commitment; it is usually the first choice when no special conditions are given.
  4. Compromise/reconcile means each gives a little, for a temporary or partial resolution that may be lose-lose; smooth/accommodate gives way for the relationship while the disagreement remains.
  5. Force/direct is win-lose and is often used when a decision must be made quickly in an urgent situation, so use it with care; withdraw/avoid suits unimportant matters or moments when people need to cool down first.
  6. In questions, catch the signal words first and then match the technique.

Common traps

  • Compromise/reconcile and smooth/accommodate are the easiest to confuse: in the first, both step back and each gets part of what it wants; in the second, one side gives way for the sake of the relationship and the disagreement remains.
  • Shelving, postponing or only recording without dealing with it is withdraw/avoid, not collaboration.
  • If the stem has no urgency signal, do not choose force/direct; it is a win-lose approach and harms relationships.
  • “A long-term resolution,” “win-win” and “consensus and commitment” point to collaborate/problem-solve; “temporary or partial resolution” points to compromise/reconcile.
  • Collaboration needs open dialogue and real needs, not each side submitting a plan to compare, and not making one side give way.

Lesson 3: Judging Conflict Scenarios: From Identifying the Source to Choosing the Right Action

Key takeaways

  1. Sequence for scenario questions (common exam practice): identify the source and understand the context, talk privately, choose a suitable method, choose collaboration when there are no urgent conditions, and follow up until it is truly resolved.
  2. Technical disagreements and priority disputes: anchor on the project objectives, have both sides discuss together and find a solution that serves both.
  3. Public blame and escalating emotion: stop it first, move to private, cool down before turning to the facts.
  4. Misunderstandings and credit disputes: clarify the facts first and set up transparent practices.
  5. Competition for resources and stakeholder disagreement: analyze the context first, find the sticking point, drive consensus and do not push it to the sponsor.
  6. Stay neutral; bring in human resources for a personality clash only if the team cannot resolve it, and treat escalation as a later-stage measure.

Common traps

  • “Escalate to the sponsor first,” “remove someone outright,” “point out mistakes in public” and “punish first” are usually later-stage measures in scenario questions.
  • With no urgency signal, do not choose force/direct; bring the parties together, find the root cause and discuss it jointly.
  • Suppressing a conflict is not resolving it: follow up on whether the real problem is actually resolved, and where you collaborate, also work for the parties' acceptance of the solution.
  • Do not take sides or jump to conclusions; stay neutral and help the parties come up with a solution.
  • In an agile environment, a technical disagreement is settled by team discussion and consensus, not by one role making the call, and it is not simply left alone either.
  • Handle cultural conflict head-on, but not by settling it in front of everyone at a public meeting; for a personality clash, bring in human resources only if the team cannot resolve it.
  • Waiting for a quarterly meeting or the lessons learned session to deal with a conflict misses the window.

Lesson 4: Conflict and Ground Rules: Set the Rules in Advance, Correct Violations Afterward

Key takeaways

  1. Ground rules are expectations regarding acceptable behavior by project team members, defined in the team charter; team agreements are a parallel term, a set of behavioral parameters and working norms established by the team and upheld through individual and team commitments, and the two cannot be swapped.
  2. Team ground rules and norms can reduce conflict; ground rules should be agreed early; the team charter works best when the team develops it or at least contributes to it; team agreements should be created at the beginning of the project.
  3. Establishing an environment that fosters adherence to ground rules (in advance) and correcting behavior that violates them (afterward) are two different things.
  4. For violations: if it happens in public, stop it on the spot and restate the rule; if it keeps happening, talk privately and invite the person to help improve the process.
  5. Disagreements can be resolved against the ground rules agreed in advance and the shared vision; unclear responsibilities call for defined roles and responsibilities.
  6. When similar conflicts keep recurring, repair the rules and processes.

Common traps

  • Set the rules in advance and correct afterward: agreeing rules in advance is building the environment, and only after a rule has been broken does correcting behavior come in.
  • Ground rules work best when the team develops them or at least has an opportunity to contribute; in exam questions, rules the project manager announces alone are usually not the good answer.
  • When a rule is broken, check against the rule and talk in private first; do not start with public criticism, tattling or escalating to the functional manager.
  • When a rule is broken in public, stop it on the spot and restate it; letting it pass amounts to condoning it.
  • For conflict caused by unclear responsibilities, the root fix is to define roles and responsibilities, not to move people.
  • When the same kind of conflict keeps recurring, go back and repair the rules and processes instead of handling only the individual case.

Leadership Styles

Lesson 1: Leadership vs. Management, and Choosing a Leadership Style

Key takeaways

  • Management activities focus on the means of meeting objectives; leadership activities focus on people: influencing, motivating, listening, enabling.
  • A project manager should be sensitive to members’ willingness and ability and adjust management and leadership style accordingly.
  • Laissez-faire: the team sets goals and decides; transactional: rewards and penalties for performance; charismatic: personal appeal; transformational: vision drives change.
  • Teams that lack relevant experience or whose goals and roles are not yet clear, and organizations facing a new type of project, generally need clearer direction and support; experienced teams manage themselves more, so use delegation plus support.
  • When members say they are managed too closely, adjust your own style first instead of adding more checking.

Common traps

  • Laissez-faire does not mean not managing. Laissez-faire suits a mature, self-driven team; a new team needs goals, roles and rules, and a hands-off approach leads to delay and confusion.
  • When micromanagement is the problem, what must change is the project manager’s own style, not a patch of team building, more one-on-ones or more checking.
  • Charismatic and transformational leaders can both “inspire people”; the difference is the focus. Charismatic looks at the leader’s personal appeal, while transformational looks at driving a vision and members’ development.
  • Transactional means trading rewards and penalties for performance; it does not mean letting the team make decisions.
  • An option saying “always stick to one style” is usually wrong: PMBOK 8 asks for switching with the situation.

Lesson 2: Servant Leadership: Serve the Team First, Then Lead

Key takeaways

  • Servant leadership: leading by focusing on understanding and addressing team members’ needs and development so as to enable the highest possible team performance, in service to the project’s business/mission objective(s).
  • Its values are respectfulness, humility and availability (being ready to listen and provide support): be open to feedback, work for the team, support its needs and remove barriers when possible.
  • Four jobs: remove obstacles, foster collaboration, educate stakeholders, develop the team.
  • Empowerment: first define the scope of delegation, let the team decide within it and be accountable, and share information at the same time.
  • Preventing dependence: ask more and answer less, draw decision boundaries, let go gradually.
  • A capable team waiting for approval: the answer is to clarify responsibilities and delegate.

Common traps

  • Servant does not mean “hands off.” A newly formed team or one whose skills are not yet adequate needs more direction, and delegation starts by defining the scope.
  • Servant is not laissez-faire either: a laissez-faire leader rarely intervenes, whereas a servant leader actively removes obstacles, wins resources and promotes growth.
  • When members wait for approval, the bottleneck is delegation, not ability. Training, escalating to the functional manager or adding approval steps will not fix it; clarifying responsibilities and delegating will.
  • Delegating while hiding key information in order to control the team is not empowerment.
  • The destination of servant leadership is the project’s business/mission objective, not making the team comfortable.

Lesson 3: Emotional Intelligence: The Four Areas and How to Use Them on Projects

Key takeaways

  • Emotional intelligence: the ability to identify, assess and manage the emotions of oneself, other people and the team; it is a basis of all forms of leadership.
  • Four areas: self-awareness, self-management, social awareness, social skills.
  • Inappropriate behavior that is still denied when pointed out: weak self-awareness (low emotional intelligence).
  • A stressed, diverse team: use emotional intelligence to identify and guide emotions; a member who has lost control: show empathy and listen first.
  • The project manager also carries an emotional load; learn to regulate it and leave room for support for the team.

Common traps

  • The four areas of emotional intelligence are self-awareness, self-management, social awareness and social skills. Do not mix up social awareness and social skills: the former is understanding other people, the latter is building the relationships and consensus.
  • When a member loses control of his or her emotions, show empathy and listen first, then discuss responses; do not criticize in public, do not ignore it and do not start by citing procedures.
  • Common exam practice: when the stem says only “stressed” or “need to understand the team’s state” and no specific disagreement appears, the answer is usually emotional intelligence. Negotiation can be used beforehand to gain support and build consensus and also to resolve conflict that has already arisen, so do not treat it only as something that follows a dispute.
  • Forcing through power only adds to the stress in a high-pressure environment and is almost never a preferred approach.
  • Inappropriate behavior that the person still denies after being told points to weak self-awareness, a sign of low emotional intelligence, not to a training, authority or job-fit problem. Repetition alone does not establish weak self-management.

Lesson 4: Inputs, Tools and Team Decision-Making for Leading the Team

Key takeaways

  • Inputs: resource management plan, team charter, project team assignments, issue log, lessons learned register, team performance assessments and so on; the most distinctive output is team performance assessments.
  • Decisions: unilateral decisions are fast but error-prone; group decisions raise buy-in but take time; team decisions often follow a diverge/converge pattern.
  • For decisions beyond the team’s authority, bring alternatives and an impact analysis and escalate; do not bring only problems.
  • Six Thinking Hats: blue facilitates, white facts, red feelings, black negative view, yellow positive aspects, green new ideas.
  • When the project manager is absent: if the impact of the absence and the decision authority are unclear, first analyze the impact and set up the team’s decision arrangements, then delegate; if already clear, delegate directly.

Common traps

  • Wanting the team to have decision authority during an absence: the common exam practice is that, if the stem shows it is not yet clear which decisions the absence will affect, analyze the impact first, then clarify decision authority, escalation conditions and contact methods, and then delegate; if the authority and arrangements are already clear, confirm or carry out the delegation directly. PMBOK 8 notes that team members who feel empowered to make decisions and are given delegation and autonomy generally perform better.
  • Do not push decisions within the team’s or project manager’s authority to the sponsor without analysis; for decisions beyond that authority, bring alternatives and an impact analysis and escalate to someone with the corresponding authority, who may be the sponsor if necessary.
  • A “one-person show” cannot be fixed by shortening meetings, defaulting to the dominant person’s view or deciding alone; every member must have an equal chance to take part.
  • In Six Thinking Hats, the black hat holds the negative point of view; it is not the “facilitator.” The blue hat facilitates the meeting.
  • When members are unclear about their responsibilities, check the roles and responsibilities in the resource management plan, the responsibility assignment matrix and project team assignments (assignments record the list of team members and their roles and responsibilities), choosing according to how the question is phrased: for overall roles and responsibilities, the resource management plan; for who is responsible for a specific activity, the matrix.

Lesson 5: The Tasks of Leading the Team: Empowering, Speaking Up, Diversity and Problem-Solving

Key takeaways

  • The seven requirements of leading the project team: set clear expectations, empower, solve problems, speak up for the team, support diversity, determine a leadership style, establish roles and responsibilities.
  • Capable but waiting for authorization: clarify decision authority and delegate; empowerment = a defined scope of delegation + autonomous decisions + accountability for results.
  • Lost or lacking confidence: set short-term goals, build realistic confidence with facts and candid communication, and do not overpromise.
  • Speaking up for the team: fight upward for resources, relay requests and let the team focus on its work.
  • Diversity: build an inclusive atmosphere of equal participation, respect minority views and encourage dissent and improvement suggestions.
  • Understand before acting. Within its authority, let the team solve things first; for decisions beyond the project team’s authority, investigate alternatives, consider the impacts of each alternative and escalate the decision to someone with proper authority (PMBOK 8); replacing people or adding process depends on the root cause. Common exam practice: when the stem gives no other conditions, do what you can do yourself first, and put escalating, replacing people and adding process later.

Common traps

  • “Delegating most of the authority while holding back important information to control the team” is not empowerment; when the person is capable and willing to be accountable, delegate and share information.
  • On the other hand, a new team cannot be left to itself: empowerment has to match maturity.
  • When a member is silent but performs well, encourage him or her to speak in a suitable way; do not speak for the person and do not call on him or her to force a response.
  • When a member is capable but afraid to decide, it is not a training problem or a replacement problem; it is that authority was not made clear.
  • Speaking up for the team means fighting for resources, not passing the team’s problems up to superiors as they are.
  • On a diverse team, let different views be fully expressed before deciding; consensus or voting may be used as agreed in the team charter, but a majority vote alone must not suppress minority views.

Lesson 6: Power and Influence: Getting Things Moving Without Authority

Key takeaways

  • Positional power: formal, reward, coercive; personal power: expert, referent. Common exam generalization: think of expert power first (it must be judged against the situation).
  • The basis for assigning members is the formal power set out in the project charter (common exam practice).
  • In a matrix environment direct authority is limited, so rely on influence: persuasion, clear articulation, active listening, considering different perspectives and maintaining mutual trust.
  • Political awareness: recognize formal and informal power relationships, know who holds power and influence, and communicate with them.
  • Leadership is different from authority; multiple people exercising leadership skills together is called shared leadership.

Common traps

  • If the question asks “which power is shown by assigning team members to carry out tasks,” the answer is formal power, based on the project charter (common exam practice); do not choose reward or coercive power just because people are involved.
  • Influence rests on persuasion, listening and mutual trust, not on stressing urgency to demand compliance or going over someone’s head to apply pressure.
  • Political awareness is not forming cliques and certainly not manipulation; it is identifying and communicating, not opposing or undermining people with influence.
  • Authority is not leadership; a person without a title can exercise leadership.

Motivation Theories

Lesson 1: Maslow’s Hierarchy of Needs and Herzberg’s Hygiene and Motivational Factors

Key takeaways

  • Motivation is providing a reason for someone to act; people perform better when motivated, and what motivates them differs by person.
  • Maslow’s five levels from low to high: physiological, safety, social, esteem, self-actualization; when lower-level needs are not met, people generally do not pursue higher ones.
  • Friendship and belonging correspond to social; achievement and recognition to esteem; learning, development and realizing potential to self-actualization.
  • Hygiene factors (company policies, salary, the physical environment and so on) cause dissatisfaction when insufficient and do not bring satisfaction even when sufficient; motivational factors (achievement, growth, advancement and so on) bring satisfaction when sufficient.
  • Hygiene factors roughly correspond to the lower three levels and motivational factors to the upper two (common exam practice).

Common traps

  • Social and esteem needs are the most easily confused: social is about relationships with others and belonging, esteem is about your own achievements and the recognition you receive.
  • Salary is a hygiene factor. “A raise for everyone will raise motivation” is wrong: a raise can prevent dissatisfaction, but raising motivation takes achievement, recognition and growth opportunities.
  • In two-factor theory, insufficient motivational factors lead to dissatisfaction and sufficient motivational factors lead to satisfaction; sufficient hygiene factors still do not lead to satisfaction. Do not mistake “no dissatisfaction” for “satisfaction.”
  • Hygiene factors are not unimportant: if they are missing, they cause dissatisfaction and have to be secured first.

Lesson 2: McGregor’s Theory X and Theory Y, McClelland’s Theory of Needs and Intrinsic Motivation

Key takeaways

  • Theory X: working for income, lacking ambition, with a hands-on, top-down management style; Theory Y: intrinsically motivated, with a personal, coaching style that encourages creativity and discussion.
  • Theory Z: Maslow’s transcendent dimension (self-realization, values, higher calling), or Ouchi’s job for life.
  • McClelland’s theory of needs: three needs, achievement, power and affiliation, with strength varying by person.
  • Pink’s three intrinsic motivators: autonomy, mastery, purpose.
  • When you see “setting goals together, no strict monitoring, trusting members to take responsibility,” choose Theory Y; when you see “using challenging tasks to satisfy the need for achievement,” choose the need for achievement.

Common traps

  • A stem that describes “delegating freely, trusting employees to take responsibility” is Theory Y; “believing employees slack off and need strict monitoring” is Theory X. Do not pair practices with theories the wrong way round.
  • McGregor addresses a manager’s view of people, while Maslow and Herzberg address people’s needs and the conditions for satisfaction; do not treat them as the same kind of theory.
  • Motivating through “challenging tasks that satisfy the need for achievement” corresponds to McClelland’s need for achievement. Expectancy theory stresses the expected relationship among effort, performance and reward; it is a common exam term, so when the stem says nothing about expectations of reward, do not choose it.
  • Extrinsic rewards lose their power once pay is reasonable; for complex work, rely more on autonomy, mastery and purpose.

Lesson 3: Applying Motivation Theories: Understand the Need First, Then Choose the Measure

Key takeaways

  • Motivation differs by person: understand the need first, then match the response; recognition and growth opportunities last longer than bonuses alone.
  • For a morale problem, listen first to find the root cause; do not start with team building, bonuses or punishment (common exam practice).
  • Feels the work has no value: connect it to the project vision, give challenging tasks and recognize them; feels no growth: adjust tasks and provide a mentor or pairing.
  • When a member volunteers to learn a new skill, an agile team should support it (common exam practice); when interest conflicts with delivery, the team discusses it together.
  • Expectations affect performance (common exam practice); assessment should center on delivered value, not on one indicator that is easy to optimize.

Common traps

  • Team building, bonuses and added pressure all “act before the cause is clear,” and in scenario questions they are usually not the first step.
  • When material rewards have no effect, it often means the need was not identified correctly; do not keep raising the stakes.
  • Slackening as the project nears closure: first find out why, then use recognition, communication and similar measures to keep morale up, rather than punishing or replacing people.
  • Facing layoff anxiety, communicate confirmed information within authorization and confidentiality constraints; do not conceal information that should be disclosed or make promises you cannot keep.
  • When designing a motivation plan, first find out what each member values, then fit it to the budget and company policy; a standard list, a budget ceiling and a uniform showcase event can only be parts of the plan.

Monitor and Control Resourcing

Lesson 1: Monitor and Control Resourcing: Purpose, Inputs, Outputs and Data Analysis Tools

Key takeaways

  • Monitor and Control Resourcing: ensure physical or virtual resources are available as planned, monitor planned versus actual use and take corrective action as necessary; it runs throughout the life cycle, and resources are released when no longer needed.
  • Inputs include the resource management plan, physical or virtual resource assignments and work performance data; outputs are work performance information, change requests, and plan and document updates.
  • Main line: compare against the plan and the assignments, use performance reviews to find the gap, then assess and take suitable corrective action; negotiate where needed, and raise a change request when the plan or a baseline is affected.
  • Data analysis: performance reviews, trend analysis, alternative analysis, cost-benefit analysis.
  • Team member matters are addressed in the Lead the Team process.

Common traps

  • Monitor and Control Resourcing is continuous, not something done only when a problem appears. Regularly reviewing resource availability and capacity is how you find a gap before a delay occurs.
  • When resource costs overrun, first use alternative analysis and cost-benefit analysis to optimize the resource mix instead of simply cutting or simply adding money.
  • The resource management plan is the basis, but asking people to "follow the plan" is not monitoring. Monitoring compares actual usage data against the plan.
  • The scope statement describes scope; it is not the document that sets out skill requirements.
  • Performance reviews ask "how big is the gap?", trend analysis asks "what will happen?", alternative analysis asks "what are the options?" and cost-benefit analysis asks "which one is worth it?"

Lesson 2: Assess Before You Act: Resource Variances and Change Control

Key takeaways

  • The shared order for monitoring processes: confirm the facts, assess the impact, choose a remedy, then act or raise a change.
  • A key member may leave, a key resource will be absent, or the plan does not match capability: assess first, then act.
  • When the assessment confirms a formal change is needed, raise a change request under the change management plan and your authorization; changing a baseline or an item under configuration control requires the formal change control procedure, never a unilateral edit.
  • Resources are cut and a baseline exists: assess first; if the current baseline cannot be maintained, raise a change request to adjust it and supply alternatives.
  • Resource allocation departs from priorities: correct it to the established priorities and update the physical or virtual resource assignments.
  • A senior-management decision shrinks the team: first assess the impact on schedule, cost, scope and risk (when the stem already gives the assessment result, start from the next step), then discuss project viability with the sponsor and decide the next step.

Common traps

  • When the options include "immediately escalate to the sponsor", "just add people", "change the baseline directly" and "assess the impact", check whether the assessment step comes first. The option that assesses or analyzes is usually the correct answer.
  • A member who "may" leave has not left yet: assess and mitigate per the plan. Do not start by lining up a replacement, and certainly do not start by asking the sponsor to "make sure the project is not affected".
  • Common exam practice: a change request comes after the assessment. A change raised without assessment is usually treated as out of order in scenario questions; impact information such as schedule and cost must be available before approval.
  • Do not push the schedule through with overtime and bonuses without assessment, and do not announce the project's termination outright. Compare options such as crashing or outsourcing, and when the assessment shows a baseline must change, go through a change request.
  • When resource shortages cause delays, first call the team together to assess, then agree on action; do not escalate directly.

Lesson 3: Team Member Changes: Assessment, Handover and Negotiating with the Functional Manager

Key takeaways

  • Answering order for member changes: assess the impact, check the resource management plan, responsibility assignment matrix and risk register, then notify, negotiate or raise a change.
  • Knowledge must not leave with people: coach newcomers who take over, cross-train, and keep knowledge from concentrating in one person.
  • A member who wants to resign: communicate first to understand why and work out a solution together; for a late-iteration resignation, agree a mitigation plan with stakeholders.
  • A member occupied by other work: first find out the effect of the delay, then negotiate directly with the functional manager and work with the member on ways to speed up.
  • Communicate and assess first; escalate and change later.

Common traps

  • When a member is replaced or reassigned, assess the impact first and act on it: escalating first, reversing the adjustment first, raising a change first or updating the plan first are all skipped steps.
  • Merely "notifying stakeholders" without first assessing the impact does not support a decision; raising a change request to add staff before assessing has no basis.
  • When a member wants to leave, communicate first to find out why; do not force them to stay and do not pass the problem to someone else.
  • A new member taking over complex work cannot be left to work it out alone; proactively explain and coach.
  • When a functional manager takes up a member's time, go to that functional manager directly to negotiate; do not just put up with it, and do not escalate first.