- Stakeholders and Communication
Cheat sheet · free to read or print
PMP Cheat Sheet: Stakeholders and Communication
The key points and common traps of 18 lessons in 4 chapters, each linked to its lesson in the study guide. Other topics are on the cheat sheet hub.
Identifying and Analyzing Stakeholders
Lesson 1: The Stakeholders Performance Domain and Identifying Stakeholders
- A stakeholder is an individual, group or organization that can affect the project, be affected by it, or perceive itself to be affected; supporters, neutrals and opponents all count.
- The Stakeholders performance domain has seven processes; initiating has only Identify Stakeholders, and the other six belong to planning, executing and monitoring and controlling.
- Identification must cover those inside and outside the organization, the earlier the better, and be repeated periodically, at least once at phase transitions.
- Sources for finding people: the project charter, business documents and agreements, plus questionnaires and surveys, brainstorming and brainwriting.
- The output is the stakeholder register, along with change requests and updates to related plans and documents.
- When every baseline is normal and the product is rejected, and the stem hints at users who were missed or whose needs were not taken in, first suspect that a key stakeholder was missed (common exam practice).
- Stakeholders are not only people with a say. People who are affected but have no decision power (such as residents or end users) are stakeholders too, and they are the easiest to miss.
- The people you analyze and engage include opponents. If you focus only on supporters, you will be interrupted later by sudden resistance.
- A customer or sponsor saying "ignore them" does not cancel a group's status as stakeholders: first register them, analyze their impact, and then decide how to engage them.
- Identification is not a one-time job. When a new group or a new manager appears mid-project, add them to the register right away, analyze their interests, influence and involvement at the same time, and then update the engagement plan accordingly.
- When every baseline is normal but the product is rejected, use the clues in the stem to check the requirements and acceptance criteria, the quality of the product, and whether stakeholders were identified and engaged (PMBOK 8 stresses collecting end-user feedback continuously and verifying and validating iteratively, to lower the risk that the product does not deliver its intended utility). Common exam practice: when all the metrics match the plan and the product is still rejected, the first suspicion is often that a key stakeholder was not identified, rather than quality or technology; if the stem gives other clues, follow them.
Lesson 2: Stakeholder Analysis: What Information to Collect and the Five Kinds of Stakes
- The analysis has to pin down six things: position, role and stakes, plus expectations, attitude and what project information they want.
- The five common kinds of stake (PMBOK 8 says "may include but are not limited to"): interest, rights, ownership, knowledge and contribution, and a person can hold several.
- Analysis is core work within the Identify Stakeholders process. Common exam practice: when the stem asks "what is the next step after identification?", answer with analysis, then classification, then planning engagement.
- To learn a person's motives and real concerns, a one-on-one interview is usually the better fit, cross-checked with questionnaires, document analysis and other sources where needed.
- Write the conclusions of the analysis into the stakeholder register and update them as attitudes change.
- Identification gives you the list; analysis gives you "what they want and which side they are on". Starting to report progress or putting people to work as soon as you have the list skips the analysis.
- A stake is not the same as a high position. Affected residents and long-serving employees who hold knowledge also have stakes.
- The business case mainly explains the project's economic feasibility, the reason for starting it, the costs, the benefits, how value is created and the success criteria. It usually cannot tell you directly someone's current motive; ask the person.
- Silence in public is not agreement. A key person's real concerns often come out only in a private conversation.
- Analysis is not a one-time job. People's attitudes change, and the conclusions need to be updated in the register as the project moves on.
Lesson 3: Stakeholder Mapping and Classification: the Power/Interest Grid and Other Models
- Mapping is for classifying, and it decides who gets your effort.
- Power/interest grid: high-high is manage closely, high power low interest is keep satisfied, low power high interest is keep informed, low-low is monitor.
- Grid models suit simple situations; the cube is three-dimensional; the salience model (power, urgency, legitimacy) suits large, complex communities.
- Directions of influence: upward, downward, outward, sideward.
- When there are many stakeholders or they change frequently, prioritize (PMBOK 8 notes that the stakeholders with the greatest concern and influence are usually placed at the top of the list).
- People with high power and low interest are the easiest to overlook, yet they may hold approval authority. The purpose of "keep satisfied" is to keep them from becoming a source of resistance.
- People with low power and low interest need only the least effort (monitor), but keep watching them, because their position may change as the project moves on.
- A person with high power and high interest who is opposed still belongs to "manage closely". Communicate with them proactively instead of dropping them to monitor.
- "Keep informed" fits low power and high interest. For a person with high power, merely reporting progress is not enough.
- Classification is not permanent: after a phase change or a change of people, place them in the grid again and update the register.
Lesson 4: The Stakeholder Register: What to Record and What to Do When a New Person Appears
- The register holds three kinds of information: identification, assessment and classification, and it is the main output of Identify Stakeholders.
- The register focuses on people and their assessment; common exam practice is to write strategies and the current and desired engagement levels in the stakeholder engagement plan.
- When people change or attitudes change, update the register; review it at phase transitions and update it when the information has changed.
- A new stakeholder: first register and analyze them, then update the engagement plan and the communications management plan.
- When communication left someone out: if the person left out is a stakeholder who has not yet been identified or whose registered information is out of date, check and update the register; if the person is already in the register but was not included among the recipients of information, check and update the communications management plan.
- The register normally does not emphasize response measures; strategies and actions belong primarily in the engagement plan. Common exam practice: engagement levels (unaware, resistant, neutral, supportive, leading) are recorded together with the strategies in the engagement plan. When a question asks "where are the strategies written?", answer the engagement plan.
- When a new person appears, first enter them in the register and analyze them, then update the engagement plan and the communications management plan. Do not first copy them on every email, and do not refuse on the grounds that they are not in the plan.
- When communication missed someone, first suspect whether the register has an omission or is out of date, not the business case or the risk register.
- The project charter lists only key stakeholders. It is not the full list and cannot replace the register.
- After updating the register, do not forget to go back and check the engagement plan and the communications management plan.
Stakeholder Engagement
Lesson 1: Planning Stakeholder Engagement and the Stakeholder Engagement Plan
- Plan Stakeholder Engagement develops strategies for engaging stakeholders based on their needs, expectations and impact. Its formal output is project management plan updates, that is, creating or updating the stakeholder engagement plan.
- One strategy per person: use root cause analysis to find out why someone resists, then choose the strategy.
- Tools: assessment matrix, prioritization/ranking, assumption and constraint analysis, mind mapping, benchmarking.
- The plan contains current and desired engagement levels, the scope and impact of changes, and relationships among stakeholders; it may contain sensitive information (common exam practice), so limit its circulation according to the information's sensitivity and organizational requirements.
- When you foresee opposition, communicate proactively before the meeting. When a new key person appears, assess him, then update the plan and set a strategy.
- The engagement plan is not written once. New stakeholders, a change in a key person's attitude and a phase transition all mean going back to update it.
- The register focuses on recording people and their assessments and classifications; the plan focuses on strategies and actions. Do not needlessly write responses into the register, and do not needlessly copy the register into the plan; the engagement plan should center on strategies and actions and can refer to the relevant register information as needed.
- When you foresee that a key person will object, reach out proactively before the meeting and hear his views. Sending only a written notice, only logging a risk or only drawing the assessment matrix does not actually engage him.
- Putting all your effort on one high-power person neglects other important people. Engagement must cover all important parties, with effort allocated by priority.
- Giving in to every demand of a high-power person is not engagement and only brings scope creep.
Lesson 2: The Stakeholder Engagement Assessment Matrix: Five Engagement Levels and the C–D Gap
- The stakeholder engagement assessment matrix compares each person's current level (C) with the desired level (D).
- The five levels: unaware, resistant, neutral, supportive, leading.
- The gap determines the communication effort; C and D in the same cell means no increase is needed.
- Supportive is agreement; leading is full commitment to ensuring success. A sponsor typically needs a higher desired level of engagement, but whether he is Leading has to be assessed in context and cannot be decided from his position alone.
- To find out whether engagement is at the right level, compare with the assessment matrix. When you find resistance, first analyze the reason for it, record the gap between current and desired engagement in the matrix, and then develop targeted engagement measures.
- C is the current level and D is the desired level. Do not reverse them.
- “Resistant” and “Unaware” are different. A resistant stakeholder knows about the project and opposes it; an unaware stakeholder knows nothing about the project or its impacts, first needs the necessary information, and once informed can be judged on his attitude to see whether further engagement is needed.
- The desired level is not necessarily “Leading.” The team sets it according to what project success requires, and it differs from person to person.
- The matrix and the strategies that go with it are generally used to develop and update the engagement plan, and where they are recorded can be tailored to the project. PMBOK 8 defines the stakeholder register as a project document that includes assessment and classification, so the register may also hold the relevant assessment information.
- The matrix compares engagement levels, not power and interest. Use the grid for classification and the matrix for engagement; do not mix them up.
Lesson 3: Managing Stakeholder Engagement: Follow the Plan, and Use Interpersonal Skills for Concerns and Conflict
- Manage Stakeholder Engagement: communicate and collaborate according to the engagement plan, meet needs and expectations, address issues and foster appropriate involvement.
- Four kinds of activity (a memory aid): gain support, manage expectations, address concerns, reach agreement.
- Tools include conflict management, negotiation, observation/conversation, political awareness, cultural awareness, ground rules and meetings; outputs include change requests and updates to plans and documents.
- Conflict: early, private, direct, collaborative; of the five techniques, collaborate/problem-solve is generally best.
- The sponsor is a key stakeholder, and an active sponsor is a critical success factor.
- Managing engagement is executing the plan: communicate where communication is due and report where reporting is due. Systematically adjusting strategy after assessing results belongs to Monitor Stakeholder Engagement; if handling an issue during execution requires changes to the plan, you can raise a change request and update the relevant plans, but first find out the cause.
- When a stakeholder objects out of worry, first handle his concerns with interpersonal skills; do not escalate first, do not go to change control first, and do not monitor first.
- When there is a disagreement with a stakeholder, communicate directly first, find the cause and discuss options together. Do not escalate to the sponsor first, and do not bypass the person concerned to consult the team.
- Conflict should be handled early and usually in private. Calling someone out in a public meeting may make him dig in harder, so conflict is generally handled in private.
- PMBOK 8 lists withdraw/avoid, smooth/accommodate, compromise/reconcile, force/direct and collaborate/problem-solve as conflict resolution techniques, each with its place: withdrawing and smoothing generally cannot remove the underlying disagreement, forcing mainly fits emergencies, and collaborate/problem-solve generally works best for long-term consensus (common exam practice: when asked for the “most appropriate,” think collaboration first).
Lesson 4: Aligning and Managing Stakeholder Expectations: Dissatisfaction, Conflict and Out-of-Scope Requests
- Task 5, align expectations: categorize, define expectations, facilitate discussion to reach agreement. Task 6, manage expectations: identify expectations, continually align outcomes, monitor satisfaction.
- The order of handling: clarify first, then check the basis, then align, go through change if scope must change, and finally record and update.
- If the client is dissatisfied but the work matches the plan, first meet him to clarify his expectations.
- Do not agree privately to an out-of-scope request: clarify it first and check scope and authority; if a change is needed, go through a change request; escalate to the sponsor, and record it, only when it exceeds the project manager's authority or meets the escalation criteria. A new request that requires changing an approved document, deliverable or baseline is handled under the applicable change mechanism; work already within the approved scope proceeds under the current plan.
- Report schedule slippage ahead of time and align with data; earn trust by keeping commitments.
- When there is dissatisfaction, ask first. Do not speculate in the team first, do not run variance analysis first, and above all do not change the plan first.
- When stakeholders have concerns, communicate early, because the cost of adjusting early is lowest. Do not wait until it escalates into action, do not pass it to the owner or the sponsor, and certainly do not recommend canceling the project.
- A reasonable new request goes through change. An unreasonable one gets an explanation of the boundaries; do not agree to it for the sake of the relationship.
- When stakeholders conflict with one another, the project manager coordinates first. Only when cross-department priorities cannot be settled or the matter exceeds his authority is the sponsor asked to decide.
- Expectation management is continuous. Check against expectations after every communication and every change.
Lesson 5: Monitoring Stakeholder Engagement: Assess Results, Adjust Strategy and Plan
- Monitor Stakeholder Engagement: assess the effectiveness of engagement efforts, identify adjustments, and refine the strategy or plan, throughout the project.
- The core is using the stakeholder engagement assessment matrix to compare current and desired levels again.
- Outputs include work performance information, change requests (corrective and preventive actions), and updates to the engagement plan, communications management plan and others.
- When engagement drops or someone cannot be reached: go back to the engagement plan, find the cause, adjust the strategy.
- Telling the processes apart: develop strategy, execute the plan, check and adjust.
- When several people who used to support the project become neutral or even opposed, first check against the stakeholder engagement plan (use the assessment matrix to compare current and desired engagement, together with the strategies in the engagement plan and the assessment information in the register), analyze the deviation, and then adjust the strategy; do not change the register classifications first, and do not call an all-hands meeting to force agreement.
- If a department manager is merely “unsure” about the direction and scope of the plan and has not clearly asked for changes, do a stakeholder analysis first to understand the concerns; do not go straight to a change request.
- When a high-power, high-interest key stakeholder objects at a meeting, communicate with him immediately, find out what he wants and seek consensus; do not ignore him, do not remove him from the list, and do not ask the sponsor to step in right away.
- Insufficient engagement is a signal that needs checking: first confirm whether actual engagement is below the required level, then review the engagement plan and communication strategy, analyze the causes, and decide whether to adjust the strategy; having the sponsor step in or sending a feedback template does not touch the causes.
- Monitoring cannot look only at meeting attendance; look at attitudes and feedback.
Plan Communications Management
Formulas
- Number of Communication Channelsn is the number of communication participants as defined by the question; whether the project manager, sponsor and so on are included depends on the question's scope of interconnection; the common exam way to count potential communication channels
Lesson 1: Plan Communications Management: Purpose, Inputs, Techniques and Outputs
- Plan Communications Management: plan how to communicate with the identified stakeholders, both inside and outside the team; the output is the communications management plan.
- Inputs include the stakeholder register and the stakeholder engagement plan; communication planning has to align with the engagement plan.
- Information can be classified as internal or external, sensitive or public, and general or detailed.
- Communication styles assessment finds the methods, formats and content stakeholders prefer; political awareness and cultural awareness help adjust communication to the environment.
- In a scenario like this lesson's, where the project manager is planning how to communicate, use the register to analyze information needs and develop the communications management plan before executing communications.
- The output of Plan Communications Management is the communications management plan, not a particular notice or meeting. When the scenario says the project manager is now planning how to communicate, analyze first and then plan; do not jump straight to "sending information".
- Communication styles assessment looks at preferred methods, formats and content; it does not judge whether a person's personality is good or bad. It is often used with stakeholders who do not support the project.
- Communication materials and standard operating procedures from past projects must be assessed for fit and then adapted; they cannot be applied directly. Where the organization has a mandatory requirement, follow the organization's rule.
- Political awareness does not mean playing power games. It means recognizing formal and informal power relationships and working effectively within them.
Lesson 2: Communication Requirements Analysis and the Number of Communication Channels
- Communication requirements analysis: determine the type and format of information stakeholders need and the value of that information; sources include interviews, workshops and lessons learned.
- When stakeholders or their needs change: analyze the needs first, then choose a suitable communication method and update the communications management plan, then communicate according to the plan.
- Number of communication channels = n(n-1)/2; first decide whether n includes the project manager, then tell "increases to" from "increases by".
- Check: add up (n−1)+(n−2)+…+1, or use "one more person adds n channels".
- Use formal written communication for important matters and private oral communication for individual reminders.
- Writing n(n-1)/2 as n(n-1) and forgetting to divide by 2 (with 12 people, 132 is wrong; the answer is 66).
- Using n² or n(n+1)/2: both are misremembered formulas.
- "Increases to" asks for the total and "increases by" asks for the difference; both numbers will appear among the answer options, so read the question carefully.
- When needs change, first run a communication requirements analysis and find out what is wanted, then choose a suitable communication method accordingly and update the communications management plan, and communicate afterwards according to the updated plan; do not send a report or arrange a meeting straight away.
- The number of communication channels depends only on the number of people taking part in the communication, not on the amount or frequency of information.
- Communication requirements analysis asks about "the type and format, combined with the value of that information", not only "what the other party wants".
- Upward, downward, lateral and external communication each have their own requirements, and a small group's needs cannot be met with a single one-size-fits-all report.
Lesson 3: Communication Technology and Communication Methods: Push, Pull and Interactive
- Communication technology is the tool, a communication method is the way information flows, and communication skills are a person's ability.
- Choose technology by five factors: urgency, availability and reliability, ease of use, project environment, and sensitivity and confidentiality.
- Interactive communication: real-time and multidirectional, best for reaching consensus. Push: ensures the information is sent, not that it is understood. Pull: the recipient takes it, suited to large amounts of information and large audiences.
- Five main forms of communication: interpersonal, small group, public, mass, and networks and social computing communication.
- Methods depend on stakeholder needs and are written into the communications management plan.
- Push communication only guarantees "sent", not "received and understood"; to confirm understanding you need feedback or interactive communication.
- Email and reports are push; public web pages, intranets and knowledge repositories are pull; meetings, calls and video conferences are interactive.
- By how information flows, communication methods fall roughly into three types: interactive, push and pull. (PMBOK 8 also lists five major forms of communication.) "Portal communication" and "broadcast communication" are not official categories; a web portal is usually a vehicle for pull communication.
- Technology is the tool, a method is the way information flows, and skills are a person's ability; the three cannot be swapped.
Lesson 4: Communication Models: Encode, Transmit, Decode and Feedback
- Basic model: encode, transmit message, decode; it is concerned only with delivery.
- Interactive model: adds acknowledgment and feedback/response; it stresses being understood and requires managing noise.
- Cross-cultural model: the emotions, knowledge, background, personality, culture and biases of both sender and receiver affect communication and can create barriers or noise.
- The sender ensures the message is clear and complete and confirms it was understood; the receiver receives it in full, interprets it correctly and responds.
- Receipt is not understanding; having the receiver send their understanding back is effective feedback.
- "Acknowledging receipt" only says the message arrived; it does not mean agreement or understanding. Real feedback is the receiver understanding the message and then encoding it and sending it back.
- The basic model is concerned with delivery, the interactive model with understanding, and the cross-cultural model adds the human factors of both sides.
- Noise and other barriers may exist on both sides; identify them and try to eliminate or reduce their interference.
- The cross-cultural model cannot be used to develop communication strategies for email, broadcast messages or social media.
Lesson 5: The Communications Management Plan: Contents, Use and Updates
- The communications management plan is a component of the project management plan that describes how, when and by whom information will be administered and disseminated, and how communication effectiveness will be monitored.
- Its contents center on requirements, information, timeframe and frequency, responsible persons, methods or technologies, escalation processes, resources, the update method, a glossary and constraints.
- Confidential information is released by the person the plan designates; for external communication, set the rules first.
- When communication goes wrong or needs change, consult the plan and understand the needs first, then choose a suitable communication approach; if the existing plan does not cover the need, update it accordingly and then execute. When a new stakeholder is identified, first register and analyze the stakeholder, then check and update the stakeholder engagement and communications management plans.
- Complex projects with many stakeholders need more detailed plans; adaptive projects communicate more often and more informally.
- The communications management plan records rules and arrangements, not the content of any one communication; it is a component of the project management plan, not a project document.
- When someone misses information, first separate whether the plan did not provide for it or the plan was not followed. If the plan did not provide for it, update the plan; if the plan provided for it and it was not done, send it as the plan says.
- Adding a stakeholder to the distribution list usually does not involve changing a baseline. Whether a change request is needed should follow the change management plan and the configuration management plan; if the plan is under configuration control, handle it through the formal change process. (PMBOK 8: a change request is a formal proposal to modify any document, deliverable or baseline.) The stakeholder register does not need updating either, unless the person is a newly identified stakeholder.
- The stakeholder register, the stakeholder engagement plan and the communications management plan each handle one thing: who the stakeholders are, which strategies and actions promote their effective engagement, and how information is delivered. Do not mix them up.
Managing and Monitoring Communications
Lesson 1: Manage Communications: Collecting, Creating and Distributing Information According to the Plan
- Manage Communications: ensuring timely and appropriate collection, creation, distribution, storage, retrieval, management, monitoring, and ultimate disposition of project information.
- Inputs include the communications management plan and work performance reports; the outputs are project communications, plus updates to the communications management plan, the stakeholder engagement plan and others.
- Communication skills fall into three kinds: oral, visual and electronic. Feedback and nonverbal communication are the points to focus on.
- Active listening, conflict management, cultural awareness, meeting management, networking and political awareness are the common interpersonal skills.
- When communication goes wrong, follow the communications management plan first. For critical push communication or communication that requires a closed loop, confirm that the other party has received and understood it.
- Manage Communications is carried out according to the communications management plan, not by sending information at random. When needs or methods change, analyze first and then update the plan appropriately. A request outside the plan should not be taken in without analysis.
- A meeting is a form of interactive communication and one of the tools and techniques. Do not equate “holding a meeting” with Manage Communications itself.
- Communication skills (what a person can do) are not the same as communication technology (the tools).
- Feedback supports interactive communication; it is not a one-way notice. Sending an email does not mean communication is complete.
Lesson 2: Project Reports, Meetings and Information Sharing: Including Reporting in Agile Settings
- Project reporting: collecting and distributing project information, adapted in level, format and detail to each type of stakeholder, and prepared regularly or on an exception basis.
- The meaning of red-amber-green indicators should be stated in writing, and a text explanation can accompany any measure outside its threshold.
- A status report should be truthful, complete and forward-looking; in this lesson's scenario, it should explain what has been achieved, the expected benefits of the unfinished features and the plan going forward.
- Meetings need an agenda, a published start and finish time, and recorded actions with owners.
- Information radiators are visible, physical, easy to update, and posted where people can see them. Agile reporting relies on transparency and self-service, and with management you explain the metrics.
- Reports adjust level, format and detail to the audience. Sending the same report to everyone does not meet the requirement.
- A status report should be truthful, complete and forward-looking. Reporting only the gap, waiting until the work is done, or sending just one short note are all wrong.
- When management wants more status information, do not simply write more reports. Let them see progress for themselves, and explain the agile basics behind the metrics.
- An information radiator goes where people can easily see it and is easy to update. It is usually a manually maintained “low tech and high touch” tool, not an electronically generated report.
Lesson 3: Monitor Communications: Checking Whether Information Needs Are Met
- Monitor Communications: ensuring the information needs of the project and its stakeholders are met, performed throughout the project.
- Inputs include the communications management plan and project communications; outputs are work performance information, change requests, and updates to the communications management plan and others.
- Method: compare plan with actual, assess effectiveness through observation and conversation, and analyze before acting.
- When the same problem recurs or someone is unhappy despite communication following the plan: assess the needs, find the gap or sticking point, and adjust the plan if necessary.
- It pairs with Monitor Stakeholder Engagement: one looks at information, the other at people's engagement.
- Monitor Communications checks whether information needs have been met, not whether “I sent it”. Information sent according to plan can still fail to meet the need.
- When a problem is found, analyze the cause first, then update the communications management plan or raise a change request. Do not start by changing tools, escalating or replacing people.
- Monitor Communications looks at information flow, and Monitor Stakeholder Engagement looks at the level of engagement. Their inputs and outputs are similar, but their objects differ.
- Repeating an approach that has already proved ineffective will not solve the problem.
Lesson 4: Tailoring Communication and Common Scenarios: Virtual Teams, Time Zones and External Stakeholders
- Communication varies by project: organizational culture, the product and the use of AI are all tailoring considerations.
- The three official examples: daily coordination meetings and real-time platforms on an agile project; biweekly email newsletters and monthly town halls on a manufacturing project; multilingual updates and monthly virtual forums on a global project.
- For teams spread over locations, time zones and languages: revise the communications management plan, accommodate time zones, raise transparency with online boards or collaboration tools, and confirm understanding.
- External stakeholders: build their information needs into the plan (PMBOK 8); agreeing rules and contacts for external communication is common exam practice.
- When barriers arise (common exam practice): compare with the communications management plan first, then analyze needs, environment and tools to find the root cause, then revise. Do not replace people or escalate first.
- When you meet a communication problem, do not start by changing tools, sending emails, escalating or replacing members. First check whether the communications management plan covers it and, if needed, update it after analyzing the needs.
- For problems across time zones and languages, revising the communications management plan to arrange things in one place is more complete than holding a single training course or workshop.
- An agile team's communication relies on transparent shared information, with real-time collaboration where useful, rather than relying only on daily emailed reports.
- Before AI generates communication material, assess whether that is appropriate and consider security and ethics. It is not simply “use it if you want to”.